More so because DB desperately needs some work for a class where half are already in storage!
How is 11 half of 30?
Brian
More so because DB desperately needs some work for a class where half are already in storage!
It should have moved from Norwich on the 21st to Laira for refurbishment before it heads off to TPE.I thought it was already with TransPenine for testing with a class 68 loco?
anymore info on whos tendering for this?
It may have been a facebook post, but I saw that GWR will be retaining the units until 2018, having an 'impact up north'.
Any update on the tender for business yet
According to Rail Express magazineNothing. Probably will never happen. The latest is that the Cardiff?Taunton/West of England route will be short HSTs. I have read on a Forum that there are already 4 HST coaches in Doncaster Works for Power doors to be fitted.
Quite surreal!As Requested
HST next to IEP at Paddington
Any more news on this. Or are the 150s staying?
Any more news on this. Or are the 150s staying?
Electric trains are required to operate the (partially) electrified GWML, and the Hitachi trains can improve journey times and increase capacity. The HSTs are forty years old, making all of Great Western's HST sets PRM TSI compliant by 2020 would be a huge undertaking, and half of them (in terms of power cars, less in terms of total vehicles) are earmarked for use by Scotrail.Don't understand the need for IEP programme then if HST stay
Don't understand the need for IEP programme then if HST stay
See post 297 on GWR Night Riviera updates thread.
The retention of the 14 cl.153 units till at least January 2018 now means LHCS is no longer required.
Not sure that this had a direct influence on the LHCS but the supposed decision to use the short HSTs on the route
With the delays caused by the wiring, could the Summer Saturday 57 hauled extra be making a comeback this summer?
Should do. The Sleeper will be running and the wires not affecting Cornwall.
retain 24 powercars and 48 carriages to form 11 four-carriage sets for use on local services between Cardiff and Penzance. These will be fitted with automatic doors and controlled emission toilets to allow there operation beyond 2020 at Doncaster Works.
Someone has put on Wikipedia that this month's Modern Railways is reporting (p. 67) that GWR will
Is this correct?