how about Johnny Cash: "I hear the train a-coming..."?Nah, let's go with Flanders and Swann's anthem of which the first two lines are:
NB. This post is completely tongue in cheek so please don't bother with the "outraged" posts.
how about Johnny Cash: "I hear the train a-coming..."?Nah, let's go with Flanders and Swann's anthem of which the first two lines are:
NB. This post is completely tongue in cheek so please don't bother with the "outraged" posts.
I don't think they do, the ones in Bavaria that I've used just have a standard tone
Definitely.This thread is supposed to be about Class 800 not announcements on European rolling stock or at stations. New thread time perhaps?
10 car IETs have now been labelled a no go area for Swindon- Cheltenham now due to all sorts of issues. Apparently there is now one with the sidings at Cheltenham.
10 car IETs have now been labelled a no go area for Swindon- Cheltenham now due to all sorts of issues. Apparently there is now one with the sidings at Cheltenham.
Now? They weren’t cleared to operate to Cheltenham in the first place; as has been mentioned numerous times on this thread.
Definitely.
In 800-related news, 800314 has now made it to the Western; it was stabled at North Pole this afternoon.
According to the Network Rail Enhancements Delivery Plan, the platforms at Cheltenham are being extended for 10 car IEP operation.
Yes they were, and that was the original plan before 9car were changed to bimode.
It wasn`t a particularly busy service early on so now it seems to make sense to split many 10 car services presumably at Plymouth, certainly at quieter parts of the year. Something I didn`t agree with earlier.
I think she says certain places oddly - Carmarthen is a said "Camaaarfen", and Cardiff Central is "sen-trul".Having been on several IETs between Swansea and Paddington, and having lived in Wales for nearly two decades... Yep. I was able to hear the Welsh twang straight away. I chuckled at it, and thought it was only for the PAD-SWA line. I'll be a lot happier if the same voice is employed across the UK. I like her voice!![]()
Had a short trip Thursday on 1G11 to Stonehouse. I had walked onto a path which runs alongside the railway but at a lower level. As the 9 car unit pulled away I could hear a very loud noise which sounded like a lot of compressed air being ejected. Was this some kind of pop off valve?
Also, why do the 180's and 800's have squeeling breaks?
So basically what we are saying is that with the 9 cars now being bi-mode, they will scrap the planned use of 10 cars on the Cheltenhams and use 9 cars (or occasionally 5 cars)?
I think that's probably what it is, but don't forget there's also the hilariously loud air-operated windscreen wipers...The doors are automatically pressure sealed above a certain speed (3mph?) - the noise was probably the seals inflating, it can be quite a sharp noise at times.
Brake Squeal will be down to what pad material is used. Both the 180s and 800s use a form of Dynamic braking as their primary means of slowing down (Hydrodynamic braking on the 180s, Rheostatic/Regenerative braking on the 800s) with disc brakes supplementing at low speed and in emergency braking. The pad material thus has to be sturdy enough to cope with infrequent, high-energy use.
I think she says certain places oddly - Carmarthen is a said "Camaaarfen", and Cardiff Central is "sen-trul".
10 car IETs have now been labelled a no go area for Swindon- Cheltenham now due to all sorts of issues. Apparently there is now one with the sidings at Cheltenham.
Because no one is planning to rebuild or alter every platform on the entire GW network (let alone the rest of the railway) to a standard height to fit the trains? Although that’s what further posts in that thread suggest ought to be done, it isn’t ever likely to be affordable.Out of interest stemming from this post, why were the 80x trains ordered without level boarding?
Unless it really is the DfT just not thinking, or going along with what it's been before?
I just think there must be a particular reason rather than someone just not thinking about it.
Because no one is planning to rebuild or alter every platform on the entire GW network (let alone the rest of the railway) to a standard height to fit the trains? Although that’s what further posts in that thread suggest ought to be done, it isn’t ever likely to be affordable.
Indeed. The voice artist for the Great Western Railway IETs is Janine Cooper-Marshall, a voice artist from the South Wales area.I think she says certain places oddly - Carmarthen is a said "Camaaarfen", and Cardiff Central is "sen-trul".
Quick question about East Coast 800s. Will they be using the bounds green depot, as per the Class 91/MK 4 fleet?
Occasionally see one in the sidings by hornsey, but never at bounds green.
Meeting EMC standards depends on the environment the testing is done in. It might meet the test requirements in a factory test area (may be even with the equipment on a static load bank but not on real railway lines where the environment is much more complex.)You can see why really! If Hitachi have delivered a product that meet the standards they were told would be sufficient to have Network Rail now move the goal posts is going to rankle.