It seems 802003+004 are finally on their way...
So would those be delivered via the Channel Tunnel or a more traditional ship shipment.
It seems 802003+004 are finally on their way...
Channel Tunnel. I'm just glad they aren't 68s trying to be shipped to Velim!So would those be delivered via the Channel Tunnel or a more traditional ship shipment.
800036 on test at Aycliffe 05/04/18
No idea whether they are better in poorer weather as such but the programme certainly seemed to imply that the HSTs were failing left, right and centre so to speak.
are you sure? the body is white (ish) and the doors are darker - wouldn't vinyl/paint get applied before fitting parts to the body shell?Good pic. Last 5 car 800/0 for GWR IIRC (I know there are also some 5 car 802s on order)
The first batch 800001-036 are painted white and have been vinyled at Doncaster after delivery from Aycliffe. The next batch 800301-321 and all the class 802’s for GWR are painted green.are you sure? the body is white (ish) and the doors are darker - wouldn't vinyl/paint get applied before fitting parts to the body shell?
The HST fleet performed as normal. The 800s were largely removed from service, due to frozen horns and problems with the TMS taking a dislike to the snow brakes. One would assume those issues will have been duly rectified.
are you sure? the body is white (ish) and the doors are darker - wouldn't vinyl/paint get applied before fitting parts to the body shell?
Hopefully they will be seeing as we'r stuck with the 800s. Also, what is the snow brake, I've seen reference to these being fitted to the Pendolinos but no explanation of what it is?
My understanding - which may or may not be complete tosh! - is that the brakes are held very lightly applied, enough to cause heat which in turn prevents the brake rigging from freezing and becoming inoperable. This appears in some cases to have confused the TMS into thinking there is a dragging brake. Which, in essence, I suppose there is, but intentionally!
I thought sending prototype trains to the Czech republic for freezing conditions testing was supposed to sort out such things.The HST fleet performed as normal. The 800s were largely removed from service, due to frozen horns and problems with the TMS taking a dislike to the snow brakes. One would assume those issues will have been duly rectified.
They might have encountered the wrong type of snow.I thought sending prototype trains to the Czech republic for freezing conditions testing was supposed to sort out such things.
K
I thought sending prototype trains to the Czech republic for freezing conditions testing was supposed to sort out such things.
K
Applied while the train is under power?
I thought sending prototype trains to the Czech republic for freezing conditions testing was supposed to sort out such things.
K
I believe so, yes. The idea is to prevent a major braking defect resulting from the brakes freezing solid whilst not being used. Obviously this can, and has in the past, led to serious operating incidents (SPAD with an HST in snow comes to mind). Ordinarily, the potential effects of snow are mitigated through performing running brake tests at frequent intervals, however this of course can slow progress quite significantly on a long journey.
It seems 802003+004 are finally on their way...
Has anyone heard anymore on the 802’s working there was across Europe..
See attached for an 802 already here and testing, pictured yesterday (07/04/18) as the crew seemed to be changing ends just outside Paddington in the reinstated (I forget what they are called) sidings.
See attached for an 802 already here and testing, pictured yesterday (07/04/18) as the crew seemed to be changing ends just outside Paddington in the reinstated (I forget what they are called) sidings.
- the engines are only marginally less noisy than a Voyager. At higher constant speed it was drowned out by track noise though.
- seat was hard as nails. No way would I want to go down to Truro on that.
- standard interior is garish.
- interior is already showing signs of wear and developing rattles.
- automated announcement was muffled, like the speaker was damaged.
All in all a far more inferior experience to the HST I went to Didcot on this morning.
Basically my view as well - an utterly mediocre train with an utterly mediocre interior at an utterly outrageous price.
Just look at what TPE are getting (interior wise) if you want quality. Or Stadler. Or for a more traditional 125mph bi-mode I think Bombardier's product will knock spots off them.
I would not be at all upset if Hitachi got no further orders of any kind for the UK with the third-rate products they appear to be offering.
Finally got a go on these, but my first high-speed electric run on the GWR will have to wait. For some reason it ran on diesel all the way from Didcot to Paddington, despite the pantograph on the unit (800016) being up on arrival.
Pros:
- it's not a Voyager.
- acceleration was decent.
Cons:
- the engines are only marginally less noisy than a Voyager. At higher constant speed it was drowned out by track noise though.
- seat was hard as nails. No way would I want to go down to Truro on that.
- standard interior is garish.
- interior is already showing signs of wear and developing rattles.
- automated announcement was muffled, like the speaker was damaged.
All in all a far more inferior experience to the HST I went to Didcot on this morning.
In my opinion the new material actually makes the seats worse. I couldn't notice any real difference in the padding, but the covering used is now very rough and scratchy rather than smooth.I understand the seats are being recovered with an improved material? I wonder with these hard seats whether it is the shape of the seats themselves or the material placed on them that is more to blame.