Any particular issue?
Not per se - the fleet utilisation percentage since the latest set of diagrams were introduced has gone up a bit and there’s been a couple of significant failures in the evening the past few days - 5 car with GU (engine) issues that got stuck between Didcot and Swindon for a couple of hours on Tuesday; and a 10 car with brake issues in Wales(?) yesterday evening. All 3 units involved were shown as stopped for repairs in the early hours of this morning; and Agility requested permission to uncover 4 diagrams; resulting in 4x 5 vice 10 sets in traffic when I left work this morning. The other issue is we’re now at the stage where Stoke Gifford and North Pole don’t have as many spare units over their daily requirement; so if failure forces a set to go to the wrong depot - it can leave Agility short of sets for the following days service. I think that’s been a factor the last couple of days; and we barely have enough drivers to cover day-day services; never mind as-hoc transfers from Stoke Gifford or North Pole.
I think (hope!) this is just a little reliability blip. The general; anecdotal trend is that reliability is improving. Certainly feel like I’m dealing with fewer issues with them compared to November/December last year. Don’t have any hard figures to back that up though, and I could just be lucky with where my shifts fall! Staffing issues remain a problem, but that’s not the trains fault!