When are 9 car IETs entering service? Will the 802 9 cars enter service before the 800 ones? I’ve only seen 9 car 802s. No 9 car 800s (GWR)
5 car 802 001/002 are around at the moment.
When are 9 car IETs entering service? Will the 802 9 cars enter service before the 800 ones? I’ve only seen 9 car 802s. No 9 car 800s (GWR)
Looking at the Fainsa website I think they are the same basic design as the 2nd Class ICE seats.From what I've seen of pictures, 1st in the 800 seems very similar to Standard in an ICE, seat-wise. I'm still yet to go on one!
Thanks for the detailed info. I guess the 9 car set is due in service soon?Informed posting on wnxx suggests that 800023 should be accepted on Monday or Tuesday to add to 800005/6/8-15/7/8/20 in service.
There appears to be a gen group 'ietgen' created with workings on groups.io which includes reports of 800s in service.
Oh ok thanks. So we won’t see 9 car sets to Bristol/South Wales then?
As I understand it, South Wales won't be getting 9 cars at all, just 2x5s

As I understand it, South Wales won't be getting 9 cars at all, just 2x5s
Clarence > are you saying that 9 car trains could be in service sooner than June and are just ‘sitting around’ because of the DfT contract? Surely, it would be in everybody’s interests to get the new trains into service so that the HST’s can go to Scotland and the GWR can have their ‘mini’ HST fleet (modified) and up and running.
Clarence > are you saying that 9 car trains could be in service sooner than June and are just ‘sitting around’ because of the DfT contract? Surely, it would be in everybody’s interests to get the new trains into service so that the HST’s can go to Scotland and the GWR can have their ‘mini’ HST fleet (modified) and up and running.
The first two are due to be handed over on the 8th June.
With the trains provided under the IEP, Agility Trains gets paid by completed diagrams with no passenger-affecting faults. It's up to them how they will achieve this, but having a spare unit or two seems likely to be part of the solution.I didn't have time to follow up and ask whether there are spare 800s on standby for instances where one is taken out of service or whether the scheduled services to be run by that unit would simply be cancelled until the set was brought back into service.
And Agility Trains are responsible for all maintenance under the IEP.With the trains provided under the IEP, Agility Trains gets paid by completed diagrams with no passenger-affecting faults. It's up to them how they will achieve this, but having a spare unit or two seems likely to be part of the solution.
And they have failed miserably so far. The service is shambolic and it is to be hoped it is costing Agility a large amount of money.With the trains provided under the IEP, Agility Trains gets paid by completed diagrams with no passenger-affecting faults. It's up to them how they will achieve this, but having a spare unit or two seems likely to be part of the solution.
If the service is shambolic and if it's the fault of the product then yes, Agility will have lost money.And they have failed miserably so far. The service is shambolic and it is to be hoped it is costing Agility a large amount of money.
And they have failed miserably so far. The service is shambolic and it is to be hoped it is costing Agility a large amount of money.
Thanks all - interesting to hear that they only get paid per diagram. I'm one of the few enjoying the HSTs before they disappear.
I could well be wrong, but I thought the shells were always going to be built overseas (in Japan and Italy) and then built up and fitted out in Newton Aycliffe. This is because the friction stir welding plant was too big an investment for a relatively limited production run, given that there was already a plant this side of the Pacific.Are the body shells still being shipped over from Japan? (I thought that this was only going to be the first few trains).
Hope someone can clear up my confusion - I spoke with a GWR TM today about the class 800s on the Cotswold Line. He implied that the great aspect of the 800s was that if there was a fault, even if it was with the WiFi, that couldn't be resolved, the entire unit would be taken out of service
I didn't have time to follow up and ask whether there are spare 800s on standby for instances where one is taken out of service or whether the scheduled services to be run by that unit would simply be cancelled until the set was brought back into service.
Thanks all - interesting to hear that they only get paid per diagram. I'm one of the few enjoying the HSTs before they disappear.
. 800s will be with us for the next 30 years so better to enjoy the wonderful HSTs in their final days as intercity trains......That's no different from (eg) Virgin Trains and their Pendolinos which are maintained by Alstom under contract.
Or any of the new fleets with contracted maintenance (class 700, 345 etc).
They operate to contractual levels of set availability, so they will turn out an alternative set if there is one.
But at times of poor fleet reliability, gaps will occur and they (Agility/Hitachi, Alstom, Bombardier etc) will lose money.
The difference for GWR (and VTEC) is going from in-house maintenance to contracted (and hence the high leasing costs).
There have been regular cancellations/part cancellations as a result of set failures from day one. That's before you get on to 5 vice 10 short forms, sets blocking the flyover at Reading for 20mins, sets running with an engine out etc etc etcShambolic? Really? In what way?
The biggest problem facing GWR passengers right now is whether there will be enough crew available to operate their service - irrespective of the type of train supposed to be working it.
Or have I missed the mass cancellations of IET services somehow?
There have been regular cancellations/part cancellations as a result of set failures from day one. That's before you get on to 5 vice 10 short forms, sets blocking the flyover at Reading for 20mins, sets running with an engine out etc etc etc
GWR are just as bad: HST short forms, regular unit shortages and staff shortages.
The whole operation is an utter farce currently. Thing is, it was all utterly predictable and management is too clueless and inept to see it.
The other notable thing, given I assume you haven't read all 6k posts in this thread, is that Agility got paid nothing from the time they won the IEP procurement contract till the first diagram ran in service a few months ago, and the fact they had to raise the funds for Hitachi to build them privately is a large part of the cost of the contract (given Hitachi has millions in loans, plus interest, to repay for the R&D costs).Thanks all - interesting to hear that they only get paid per diagram.
I could well be wrong, but I thought the shells were always going to be built overseas (in Japan and Italy) and then built up and fitted out in Newton Aycliffe. This is because the friction stir welding plant was too big an investment for a relatively limited production run, given that there was already a plant this side of the Pacific.
There have been regular cancellations/part cancellations as a result of set failures from day one. That's before you get on to 5 vice 10 short forms, sets blocking the flyover at Reading for 20mins, sets running with an engine out etc etc etc
GWR are just as bad: HST short forms, regular unit shortages and staff shortages.
The whole operation is an utter farce currently. Thing is, it was all utterly predictable and management is too clueless and inept to see it.