• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR Class 800

Status
Not open for further replies.

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
The standard class seats are alright, being lucky enough to sit in one at Newton Aycliffe a few weeks back. The charging ports are pretty much the same as a MK3, but there is a tad more legroom, about the same as the priority access seats in the GWR MK3's. There is more room overhead, and I'm 6 ft exactly and can walk fine through the carriages. As for 1st Class, it looks very similar to standard (sadly) and could really do with better seats, especially since the price difference between standard and 1st is huge, and I wouldn't say it's worth it for what I looks like.

The reasons the interiors of the first batch of 800s look the way they do is well documented - civil servants know best...

Virgin have at least been allowed to go for a splash of colour, if the artist's impressions are anything to go by, but the black and red first class seats look rather tacky to my mind.

Fingers crossed GWR has commissioned the same people who did the current HST first class to make a rather better job of the 802 interiors, though almost anything would be an improvement than DfT's shades of grey...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,068
Location
Redcar
Changed that, so as to give everyone nightmares!!!

Although that would explain a lot of transport policy....

Listen! This is supposed to be a famiyl friendly forum so this sort of thing has no place here! How are we supposed to sleep soundly tonight after that!!

:lol::p:lol:
 

Julia

Member
Joined
19 Jun 2011
Messages
379
800003/4 on 5X80 North Pole - Doncaster today, noted hammering up the ECML just behind a 91+Mk4. Is this a regular working, and if so - training, rotating the sets around, ...?
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
800003/4 on 5X80 North Pole - Doncaster today, noted hammering up the ECML just behind a 91+Mk4. Is this a regular working, and if so - training, rotating the sets around, ...?

It is fairly regular. Gets sets positioned so they can perform the testing required of them where needed. Obviously 800004 and 800003 are wanted by Hitachi up in Doncaster. Another Class 800, a new one with no decals, operated a move between North Pole and Stoke Gifford today.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
It is fairly regular. Gets sets positioned so they can perform the testing required of them where needed. Obviously 800004 and 800003 are wanted by Hitachi up in Doncaster. Another Class 800, a new one with no decals, operated a move between North Pole and Stoke Gifford today.
800003 and 800004 for company, passed York at 0946 on 5X40 Doncaster - Newcastle - Peterborough - Doncaster test run
 
Last edited by a moderator:

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,935
Location
here to eternity
When do Virgin East coast intend to run their first passenger workings with the class 800? I say that because I don't believe one has reached Edinburgh yet! Have any East Coast drivers been trained yet?
 

Bornin1980s

Member
Joined
4 Apr 2017
Messages
720
It's certainly a screamer! Just what makes that noise? I thought electric trains were supposed to be quieter.

Still, glad to see some of the GWR wires working, but why can't any electrified system take these trains at the moment, even on the ECML? Do these trains really draw that much more power than any other train? I mean, Hitachi made the 395 run on third rail. Have they lost their Japanese perfection?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Still, glad to see some of the GWR wires working, but why can't any electrified system take these trains at the moment, even on the ECML? Do these trains really draw that much more power than any other train?

It's nothing like as simple as power draw being the problem. There can be a number of other issues such as mutual electrical interference between trains and other lineside equipment. This has been discussed earlier in this thread.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Have you seen this recent video, of a diesel to AC power changeover at Maidenhead? https://youtu.be/QpI6c2gO1Dk

Well that's good to see.
We really need confirmation that it is OK under OHLE (other than on test).
I imagine we are in a phase where only certain units have the necessary mods for Series 1, pending roll-out (of software?) to the whole fleet.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
When do Virgin East coast intend to run their first passenger workings with the class 800? I say that because I don't believe one has reached Edinburgh yet! Have any East Coast drivers been trained yet?

GWR drivers haven't even reached the cab on the Class 800's! And they expect theirs to enter service in Autumn, which sounds ambitious. Would it be correct to say the first IET's to enter service with GWR will be 800003 and 800004? 800001 and 800002 seem to be crammed full of testing equipment, and a lot of seats seemed to have been ripped out...

Whilst on business in Newton Aycliffe, I saw a Class 800 (800014) on test on their test track, changing power between diesel and electric, and worked seemless at low speeds. Interesting video at Maidenhead though, at least shows it can work. Can these IET's change power whilst moving? If so, what's the max speed they can do this?
 
Last edited:

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
GWR drivers haven't even reached the cab on the Class 800's! And they expect theirs to enter service in Autumn, which sounds ambitious. Would it be correct to say the first IET's to enter service with GWR will be 800003 and 800004? 800001 and 800002 seem to be crammed full of testing equipment, and a lot of seats seemed to have been ripped out...

Whilst on business in Newton Aycliffe, I saw a Class 800 (800014) on test on their test track, changing power between diesel and electric, and worked seemless at low speeds. Interesting video at Maidenhead though, at least shows it can work. Can these IET's change power whilst moving? If so, what's the max speed they can do this?

"Strategically removed" would perhaps be a more accurate description. ;)
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
GWR drivers haven't even reached the cab on the Class 800's! And they expect theirs to enter service in Autumn, which sounds ambitious. Would it be correct to say the first IET's to enter service with GWR will be 800003 and 800004? 800001 and 800002 seem to be crammed full of testing equipment, and a lot of seats seemed to have been ripped out...

Whilst on business in Newton Aycliffe, I saw a Class 800 (800014) on test on their test track, changing power between diesel and electric, and worked seemless at low speeds. Interesting video at Maidenhead though, at least shows it can work. Can these IET's change power whilst moving? If so, what's the max speed they can do this?

800001 and 800002 have always been full of test equipment. No seats were installed, so none have been 'ripped out'. It won't be the first time that the first-built of a new type of train enter passenger service after ones that followed them down the production line.

Re changing power modes on the move, this has been mentioned over and over in this thread, but what the heck, let's do it again...

The IEP technical specification https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/82840/tts-redacted.pdf
requires that the changeover between diesel and electric and back can be done on the move, at speed, all the way up to 125mph.

Point 3.1.2 on Page 16 of the specification

A Bi-mode IEP Unit must be able to switch between any of the modes identified in TS1576 whilst at any speed from stationary up to the maximum speed of an IEP Train identified in TS261.


I think it has been mentioned back up this thread somewhere already, but Nigel Harris, writing in the current issue of Rail, describes being on an IEP at the Old Dalby test track in 2015 when the switch from electric to diesel was made when the train was running at 100mph. The article can be read at this link

https://www.pressreader.com/uk/rail-uk/20170719/281479276468725
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Can these IET's change power whilst moving? If so, what's the max speed they can do this?

The specific requirement to changeover on the move must have been confirmed dozens of times during your time on this forum. I see jimm has quoted the spec already.
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
For anyone interested in electric running.

I saw two GWR IEP units go through York just now. Did not catch numbers as was caught by surprise, and then focussed on which mode it was in. I can confirm both units had the pan up.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
For anyone interested in electric running.

I saw two GWR IEP units go through York just now. Did not catch numbers as was caught by surprise, and then focussed on which mode it was in. I can confirm both units had the pan up.

The numbers are 800003 and 800004. Led to believe they left Newcastle in Diesel mode. But can vouch that they both were in Electric mode with both units Pan up, when they passed York. Wonder wether they changed on the move or when stationary?
 
Status
Not open for further replies.

Top