• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR Class 800

Status
Not open for further replies.

Clansman

Established Member
Joined
4 Jan 2016
Messages
2,648
Location
Scotland and Hong Kong
This has probably been raised but I'm a tad too lazy to browse through the thread looking for the answer - forgive me ;)

Will Virgin use Yellow front ends on their units
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,034
Location
81D & 81E
800002 & 800004 have been out and about. Running together as:

5X16 North Pole Depot - Bristol TM
5X17 Bristol TM - North Pole Depot
 

Harbornite

Established Member
Joined
7 May 2016
Messages
3,627
IIRC ERTMS is specified so that any installation will work with the others, so it *should* work.

Perhaps Virgin or the next west coast franchisee could get some for services to Aberywtwyth...


I'll get my coat.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Means if the line supported it the rolling stock could operate it (though are only being certified for 125mph speeds so would need 140mph recertification too)
 

class26

Member
Joined
4 May 2011
Messages
1,198
Means if the line supported it the rolling stock could operate it (though are only being certified for 125mph speeds so would need 140mph recertification too)

Apparently certain sections of the ECML south of Doncaster (plus the racetrack between York and Darlington) are suitable for 140 mph subject to level crossings being removed. Also wondered what had happened to the group announced by R Branson looking into enabling the Azumas (sorry 800`s) to run at 140- mph. Its been very quiet since the announcement.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Means if the line supported it the rolling stock could operate it (though are only being certified for 125mph speeds so would need 140mph recertification too)

Presumably this is from testing on the Hertford Loop test track, using the class 313 test train fitted with ETCS kit from different vendors.
And by "Hitachi" I suppose we mean what was "Ansaldo STS", which was the supplier for the Cambrian and now part of Hitachi.
I'm not sure what, if anything, is fitted to class 800s.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,034
ORR has now approved Hitachi's in cab ERTMS signalling implementation.

News story can be found here:
http://www.railwaygazette.com/news/...achi-etcs-approved-for-passenger-service.html

Rail safety regulator ORR has approved Hitachi Rail Europe’s onboard ETCS equipment for use in passenger service, the company announced on September 7.

The formal Authorisation to Place in Service was issued following the successful completion of trials on the Cambrian line, which runs from Shrewsbury to Aberystwyth and Pwllheli. Hitachi onboard ETCS equipment had been fitted to a Class 37 diesel locomotive in 2013 for a series of trials which confirmed that it could operate successfully with the lineside ETCS supplied by Ansaldo STS, now also part of Hitachi Rail Europe.

Hitachi says it is the first train manufacturer in the UK to have its ETCS onboard equipment authorised by the rail regulator for use on passenger trains. Describing approval as ‘a big step forward for digital innovation on the UK rail network’, Project Director Andy Rogers added that 'Hitachi is hugely proud to be the first to achieve this milestone, which is a testament to the hard work of our testing and signalling teams. Our thanks go to Network Rail for its role in achieving this milestone and we look forward to working with them to implement ETCS across the network.’

The Hitachi onboard ETCS equipment is to be fitted to more than 160 trains that the company is building. The first of the Class 800/801 trainsets being supplied as part of the Intercity Express Programme are due to enter passenger service on the Great Western Main Line next year. One of the pre-series IEP sets now undertaking test running is expected to begin trials at Network Rail’s ERTMS National Integration Facility near Hertford within the next few weeks.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.
 

class26

Member
Joined
4 May 2011
Messages
1,198
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.

I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.

I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also

Bypassing Durham will benefit more people than bypassing Morpeth, so it's far more likely to happen. The only people who benefit from Morpeth alone are Scotland-Newcastle passengers, for whom the journey time saving would be relatively inconsequential. A Durham bypass would speed up times to Newcastle from across England as well as Scotland to Yorkshire journeys. On top of that, it would allow segregation of fast and slow services between Darlington and Newcastle, increasing capacity and reducing journey times further.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.
That would be hideously expensive to build and I don't know if it would even be of much use - how many trains would the TOCs want to bypass Newcastle?

I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also
Indeed and there's plenty of open country to the south and east of Morpeth which would make smoothing out that curve fairly straightforward.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
That would be hideously expensive to build and I don't know if it would even be of much use - how many trains would the TOCs want to bypass Newcastle?

Indeed and there's plenty of open country to the south and east of Morpeth which would make smoothing out that curve fairly straightforward.

No, no. Not avoiding Newcastle. Avoiding the local stations on the line in to Newcastle.

Its believed the local lines and junctions produce a lot of delays and a fresh line which just stopped in the city centre with a much higher speed limit and was segregated from local passenger/goods traffic would produce a lot of time savings.
 
Last edited:

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,642
Location
UK
Surely any new sections of ECML north of York should be developed on the basis of future linking up to HS2/3 (much as the French tend to build their railways). Ie not just limited to 140mph but more like 300-400kph. After after all we'll have trains cable of these speed running on the northern section of the ECML by the time any such by-pass is likely to be built.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
if you had fast lines avoiding stations north and south of Newcastle it would also allow a more intensive local service
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
Can I remind members this thread is entitled "Class 800", can we please stay on topic and create another thread should new lines in the Newcastle area warrant further discussion. Thanks
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Article from Rail Technology Magazine, talking about progress on testing of the 800s and other aspects of the project.

Also gives an update on manufacturing schedules, with the AT300 assembly work in Italy starting in spring next year and the first GWR set expected in the UK in the summer for testing. Work on TPE's AT300s will start at Newton Aycliffe in summer 2018.

Unleashing the potential of the class 800s

Andy Rogers, projects director at Hitachi Rail Europe, talks to RTM’s David Stevenson after two of the company’s Class 800 InterCity Express Trains made test runs on the recently electrified Reading to Didcot section of the GWML.

Back in late June, the first of Great Western Railway’s new fleet of Class 800 IEP trains, named the ‘Green Machine’, made a special trip from Reading to London Paddington to mark 175 years since the opening of the Great Western Main Line (GWML).

Since that test run, Network Rail has used two of the bi-mode trains – T1 and T2 coupled together – under electric traction to carry out tests runs on the infrastructure owner’s recently electrified GWML section between Reading and Didcot

http://www.railtechnologymagazine.c...s-/unleashing-the-potential-of-the-class-800s
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Apologies if I've missed it, was there anything more specific than '2017' for the anticipated 800 entry to service on GWR? Given that it's barely over 3 months until it becomes 2017, I'd have expected something like 'Autumn' or 'Q4' as an estimate.
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Use of Class 800s in passenger service should start next summer. July was the target date mentioned when the Class 800 launch event took place at Paddington at the end of June.

http://www.railmagazine.com/news/ne...uns-first-bi-mode-iep-class-800-to-paddington

I believe the initial plan is to introduce them in batches of four, giving a pair of 2x5-car Class 800 formations to each replace an HST.

Any idea when we'll see them in the Oxford area? I would have thought they'd want to prioritise routes where pairs of 5-cars would be particularly useful, with one continuing on for the Cotswold line.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,242
There is a graph in the direct award franchise stakeholder brief showing fleet increases and decreases over time, and it suggests that the first stock to be displaced once the first 6 bi-modes are available is the 180s. They are Grand Central's trains from December, but subleased for a few months.

Perhaps therefore the first bi-modes will be seen on routes operated by 180s, unless they are temporarily replaced by something else, such as Turbos or HSTs.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Ah that's better than I thought then. I assume the reclassification of 801s to 800/3 won't lead to the 9-car units being introduced any sooner.

No, won't make a difference to the order things will come off the production lines, but I don't know when the first GWR nine-car set is due for delivery.

Any idea when we'll see them in the Oxford area? I would have thought they'd want to prioritise routes where pairs of 5-cars would be particularly useful, with one continuing on for the Cotswold line.

Maybe towards the end of next year, as GWR is due to hand over its 180s to Grand Central in December 2017.

Not sure how much splitting and joining there will be, as almost all of the current weekday services to/from the Cotswold Line don't involve that anyway, being HSTs or 180s.

And the December 2017 timetable is an interim one until the major GWR network timetable overhaul in December 2018 when pretty much all the 800s and 802s will be available - with the possible exception of the most recent order for seven extra nine-car 802s.

It may also be the case that a 320-seat 800 is deemed to have enough seating capacity to work on its own between Oxford and Paddington on weekend services where a single Class 166 with 250 seats is not seen as sufficient at the moment, which results in a number of Turbo-worked services splitting and joining at Oxford.
--- old post above --- --- new post below ---
There is a graph in the direct award franchise stakeholder brief showing fleet increases and decreases over time, and it suggests that the first stock to be displaced once the first 6 bi-modes are available is the 180s. They are Grand Central's trains from December, but subleased for a few months.

Perhaps therefore the first bi-modes will be seen on routes operated by 180s, unless they are temporarily replaced by something else, such as Turbos or HSTs.

I can assure you I have heard GWR managers say that 800s will be seen first on Bristol and South Wales services.

No wonder, given these routes are the key money-spinners for the company - but presumably also on the basis that in the first weeks of operation there will be a Hitachi depot nearby in case of technical issues, which there wouldn't be should a set sit down and die at Worcester.

While I am sure Grand Central would love to get their hands on the 180s sooner rather than later, Scotrail will also want to start getting ex-GWR HSTs into the workshops for overhaul as soon as they can, in order to hit their June 2018 introduction date
 
Last edited:

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,263
The original plan for the 800 sets on GWR was to replace the 180 sets first and then move onto 2 X 5 car workings, running just about everywhere, in existing HST diagrams modified to be TARA maintenance window friendly.

The lack of suitable infrastructure for 10 cars on the North and South Cots to at least late 2018 together with the bi-modalisation of the 9 cars has necessitated a swap round, which actually makes the cascade of IEP units onto South Wales services a lot more logical and easier.

Previously the electric sets were an absolutely pig to diagram into the existing timetable (which had to remain as is) and quite a few were going to be parked up until Swansea came on stream in May 2018. Now the 10 cars get most of the Bristol/Swansea circuits up to Dec 2018 which works really well while the 9 cars will go everywhere. The amount of 5 car cl.800 operation at Pad up to Dec 2018 will be fairly minimal, being the ex cl.180 work.

There are changes to unit availability, changes to the fuel tanks on all the cl.800 fleet and changes to the maintenance downtime requirements as part of this bi-modalisation and the first and last has been taken into account in the number of extra 802 sets that were ordered by GWR so that GWR weren't left short.

The start date for entering service of all the Agility sets are also being altered due to contractual issues but I am not able to discuss that here.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Previously the electric sets were an absolutely pig to diagram into the existing timetable (which had to remain as is) and quite a few were going to be parked up until Swansea came on stream in May 2018.

Electric to Swansea by May 2018?
I don't think that is feasible.
 
Status
Not open for further replies.

Top