Will Virgin use Yellow front ends on their units
ORR has now approved Hitachi's in cab ERTMS signalling implementation.
So, would that work on the Cambrian then?
IIRC ERTMS is specified so that any installation will work with the others, so it *should* work.
ORR has now approved Hitachi's in cab ERTMS signalling implementation.
Means if the line supported it the rolling stock could operate it (though are only being certified for 125mph speeds so would need 140mph recertification too)
Means if the line supported it the rolling stock could operate it (though are only being certified for 125mph speeds so would need 140mph recertification too)
ORR has now approved Hitachi's in cab ERTMS signalling implementation.
Rail safety regulator ORR has approved Hitachi Rail Europes onboard ETCS equipment for use in passenger service, the company announced on September 7.
The formal Authorisation to Place in Service was issued following the successful completion of trials on the Cambrian line, which runs from Shrewsbury to Aberystwyth and Pwllheli. Hitachi onboard ETCS equipment had been fitted to a Class 37 diesel locomotive in 2013 for a series of trials which confirmed that it could operate successfully with the lineside ETCS supplied by Ansaldo STS, now also part of Hitachi Rail Europe.
Hitachi says it is the first train manufacturer in the UK to have its ETCS onboard equipment authorised by the rail regulator for use on passenger trains. Describing approval as a big step forward for digital innovation on the UK rail network, Project Director Andy Rogers added that 'Hitachi is hugely proud to be the first to achieve this milestone, which is a testament to the hard work of our testing and signalling teams. Our thanks go to Network Rail for its role in achieving this milestone and we look forward to working with them to implement ETCS across the network.
The Hitachi onboard ETCS equipment is to be fitted to more than 160 trains that the company is building. The first of the Class 800/801 trainsets being supplied as part of the Intercity Express Programme are due to enter passenger service on the Great Western Main Line next year. One of the pre-series IEP sets now undertaking test running is expected to begin trials at Network Rails ERTMS National Integration Facility near Hertford within the next few weeks.
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.
I second that.I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also
Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.
I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also
That would be hideously expensive to build and I don't know if it would even be of much use - how many trains would the TOCs want to bypass Newcastle?Bits of ECML have been talked about for upping to 140mph, also a new high speed avoiding line in to the centre of Newcastle looks a likely project in the mid term.
Indeed and there's plenty of open country to the south and east of Morpeth which would make smoothing out that curve fairly straightforward.I would have thought a Morpeth by pass at 140 mph would save a reasonable amount of time also
That would be hideously expensive to build and I don't know if it would even be of much use - how many trains would the TOCs want to bypass Newcastle?
Indeed and there's plenty of open country to the south and east of Morpeth which would make smoothing out that curve fairly straightforward.
Unleashing the potential of the class 800s
Andy Rogers, projects director at Hitachi Rail Europe, talks to RTM’s David Stevenson after two of the company’s Class 800 InterCity Express Trains made test runs on the recently electrified Reading to Didcot section of the GWML.
Back in late June, the first of Great Western Railway’s new fleet of Class 800 IEP trains, named the ‘Green Machine’, made a special trip from Reading to London Paddington to mark 175 years since the opening of the Great Western Main Line (GWML).
Since that test run, Network Rail has used two of the bi-mode trains – T1 and T2 coupled together – under electric traction to carry out tests runs on the infrastructure owner’s recently electrified GWML section between Reading and Didcot
Use of Class 800s in passenger service should start next summer. July was the target date mentioned when the Class 800 launch event took place at Paddington at the end of June.
http://www.railmagazine.com/news/ne...uns-first-bi-mode-iep-class-800-to-paddington
I believe the initial plan is to introduce them in batches of four, giving a pair of 2x5-car Class 800 formations to each replace an HST.
Ah that's better than I thought then. I assume the reclassification of 801s to 800/3 won't lead to the 9-car units being introduced any sooner.
Any idea when we'll see them in the Oxford area? I would have thought they'd want to prioritise routes where pairs of 5-cars would be particularly useful, with one continuing on for the Cotswold line.
There is a graph in the direct award franchise stakeholder brief showing fleet increases and decreases over time, and it suggests that the first stock to be displaced once the first 6 bi-modes are available is the 180s. They are Grand Central's trains from December, but subleased for a few months.
Perhaps therefore the first bi-modes will be seen on routes operated by 180s, unless they are temporarily replaced by something else, such as Turbos or HSTs.
Previously the electric sets were an absolutely pig to diagram into the existing timetable (which had to remain as is) and quite a few were going to be parked up until Swansea came on stream in May 2018.