The first bi-mode 9-car set destined for the East Coast (800101) has in fact been in the UK since August as the second of the pre-production trains (The two 5-car pre-production sets, 800001/002, are both destined for the GWML). However I don't know if we've seen any pictures of the interior of this set, or whether it is likely that it will be entirely changed before the train enters passenger service.
Oh dear, silly me for not specifying the first train of the main series production run at Newton Aycliffe for the East Coast.
As far as I'm aware, none of the pre-series trains has a complete interior right now, in order that they can carry test kit, and given the fact that the pre-series trains will all need to be overhauled and fully kitted out before entering passenger service it seems unlikely Virgin will want one set running around that differs from the rest if they do indeed get much more say on the interior than DafT was willing to give GWR on the initial batch.
My comment was more that isn't this the division which, under it's previous name made an absolute cluster bomb of the Dutch FYRA and Danish IC4 orders and FGW thinks they have a fantastic pedigree?!?
As noted above, it's PR nonsense. But Hitachi acquired Ansaldo Breda in full knowledge of all the rubbish that they have built over the years - and you can bet your life quality control will be top of the list of priorities for action. Hitachi only paid Finmeccanica 30 million Euros for AnsaldoBreda's assets, which says a lot. The real money was spent on the simultaneous acquisition from Finmeccanica of its stake in the Ansaldo STS signalling business.
Steps had already been taken in the right direction before Hitachi took over, with the new Frecciarossa 1000 high speed trains for FS in Italy apparently performing well - perhaps because AnsaldoBreda has an incentive to ensure this as it also holds the maintenance contract and knows if they are rubbish there is a ready-made replacement in the wings in the shape of Alstom's AGV, used by the open access Italian intercity operator NTV.
It's now obvious that Newton Aycliffe is competing directly with Pistoia for Hitachi's European train orders.
It may well provide earlier delivery dates for the AT300s (maybe the anticipated TPE units will go the same way).
But it takes away Newton Aycliffe's USP.
Being privately financed, the government's scoring system for train manufacture (if it was ever actually used) does not apply.
http://www.railwaygazette.com/news/...ern-at300-trainsets-to-be-built-in-italy.html
Edit: Presumably all the body shells (and much else) will still be fabricated in Japan?
Given that Newton Aycliffe is basically full up with work on IEP and AT200 until the end of 2018, with a lot of the East Coast IEP work running on until 2020, they are not competing for anything right now.
Pistola is busy with Frecciarossa 1000 and coaches for FS until early 2017 but Hitachi presumably wants to keep work flowing there after that date, so switching the AT300s from Kasado suits them, especially if there are orders in the wind for more bi-modes to go to TPE, all due in service by 2019, requiring a lot more production capacity quickly. The TPE sets are all meant to be in service by 2019 and Newton Aycliffe is busy, so couldn't build many if any to meet that deadline given its existing commitments.
Given the uncertainty over Britain's future relationship with the European Union, it's perhaps not surprising that Hitachi don't want to put all their eggs in one basket in the shape of Newton Aycliffe, given that their declared strategy has always been to enter the wider European market. Buying AnsaldoBreda secured access to that market, whatever happens here.