Yeah I can't see anything but Vivarail tbh... They have a Rapid Charge System developed (or in development) and, as other have said, Cleared Stock for the metals.

I don't think the Greenford Bay has any electrification does it?
The tracks on the other platform edges are electrified at 750V DC...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
Platform 5 at West Ealing is only accessible from the Greenford branch so not much point in electrifying it.
Indeed, as it's only purpose is for the Greenford Shuttle (and occasional Chiltern service), there's no point in electrifying the bay for it until something else requires the fitment of OHLE along the branch.
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,191
Maybe I'm wrong, but a curious lack of enthusiasm from insiders further up the thread does point to a trial of the battery d unit.
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,006
Location
Yellabelly Country
Have I missed something here, but aren't the Class 769/9 units ideal for this branch. Are GWR able to order a couple of additional conversions? They can also operate on the sections of route into Paddington on the AC wires, if required. Perhaps there isn't the capacity for the service to run to/from Paddington the same nowadays?
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,191
Have I missed something here, but aren't the Class 769/9 units ideal for this branch. Are GWR able to order a couple of additional conversions? They can also operate on the sections of route into Paddington on the AC wires, if required. Perhaps there isn't the capacity for the service to run to/from Paddington the same nowadays?
2 coaches too long, and they can't be shortened.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,254
It's a quiet shuttle service with low passenger numbers, Vivarail's product is perfectly suited really.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,458
Location
Taunton or Kent
Have I missed something here, but aren't the Class 769/9 units ideal for this branch. Are GWR able to order a couple of additional conversions? They can also operate on the sections of route into Paddington on the AC wires, if required. Perhaps there isn't the capacity for the service to run to/from Paddington the same nowadays?
2 coaches too long, and they can't be shortened.
That's a minor detail! :lol:
The HydroFlex (Class 799) concept would work on the cleaner energy front were the carriage length not a problem.

Of course they could always go the whole hog and actually electrify the branch properly, but I'm sure there are plenty of reasons, including a poor BCR stopping that. As was alluded to further up, the Windsor branch could do with similar treatment in terms of battery/electric removing a really short diesel stretch.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,269
Location
"Marston Vale mafia"
Of course they could always go the whole hog and actually electrify the branch properly, but I'm sure there are plenty of reasons, including a poor BCR stopping that. As was alluded to further up, the Windsor branch could do with similar treatment in terms of battery/electric removing a really short diesel stretch.

TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.
 

southern442

Established Member
Joined
20 May 2013
Messages
2,266
Location
Surrey
TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.
That does have the added bonus of bringing back some of the peak time continuations into London (although I suppose that could hypothetically happen anyway were they to use 769s). It may be worth having a look at Windsor to London services in the peaks too.

So it looks as though GWR will be getting 230s or similar after all, albeit maybe not in the places we were expecting.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,458
Location
Taunton or Kent
TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.
I don't know how BCRs are properly calculated, but I imagine the best and most sensible value would be obtained by factoring all the branch lines into one calculation, which would account for the rolling stock benefits in terms of flexibility as well as performance.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,269
Location
"Marston Vale mafia"
That does have the added bonus of bringing back some of the peak time continuations into London (although I suppose that could hypothetically happen anyway were they to use 769s). It may be worth having a look at Windsor to London services in the peaks too.

Problem with Windsor is that it's on the wrong side - you'd lose a couple of fast line paths getting it over to the reliefs. And short trains aren't a good use of paths. But that said, that doesn't mean it's not worth doing it, because it would in most or all cases just be a case of stringing it off the mainline, so in railway terms the cost is negligible.

I don't know how BCRs are properly calculated, but I imagine the best and most sensible value would be obtained by factoring all the branch lines into one calculation, which would account for the rolling stock benefits in terms of flexibility as well as performance.

Yes, diesel islands are a(n expensive) nuisance.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,321
The HydroFlex (Class 799) concept would work on the cleaner energy front were the carriage length not a problem.
How would the hydrogen be transported to West Ealing from wherever it is manufactured?

the cost would be negligible
Is that really true? - I think it has been suggested that the tunnels and bridges at the Southern end of the Greenford line don't make it easy.

That does have the added bonus of bringing back some of the peak time continuations into London (although I suppose that could hypothetically happen anyway were they to use 769s).
It absolutely doesn't - there is no capacity for trains off the Thames Valley branches to go into Paddington regardless of how they are powered - certainly not with 769s. The relief line is all about Crossrail now (and residual GWR local services beyond Reading)
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,773
TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.

Approx 23 single track km. £40m at the very least. A lot more than a handful of short battery trains.
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,191
TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.
It's not in the NR electrification wishlist. Anyway, they need to devote their finite resources to electrifying key routes that provide the biggest possible benefit.

That does have the added bonus of bringing back some of the peak time continuations into London (although I suppose that could hypothetically happen anyway were they to use 769s). It may be worth having a look at Windsor to London services in the peaks too.

So it looks as though GWR will be getting 230s or similar after all, albeit maybe not in the places we were expecting.
They were culled to create paths for Crossrail. They aren't coming back.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
Not if it’s the wrong sort of hydrogen!
Indeed. The wrong sort can be worse in GHG terms than diesel.
Yes, so that somewhat negates the green credentials. Where is the nearest Hydrogen plant to West Ealing?
TfL are/were building one on the other side of London but al the cheap fossil hydrogen is from Mersey /Humber /Tees areas
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
TBH I'd wire all the Thames Valley branches. Not doing so was cheaping out (just like not going to Bristol Temple Meads) - the cost would be negligible, and they're all just mini Windermeres in that regard.
Thats all well and good but you'd need a 2 car EMU (or 3 if you get one thats a cl777 length) for those routes.... Lots of expense. I do see the advantage of battery trains on these short routes, with short trains.

Seems a simple and effective system for those short branches!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
I don't know how BCRs are properly calculated, but I imagine the best and most sensible value would be obtained by factoring all the branch lines into one calculation, which would account for the rolling stock benefits in terms of flexibility as well as performance.
All the Thames Valley branches including Basingstoke but not Greenford were in one combined CP5 project originally. Then they withdrew Marlow as too difficult, then they separated out Basingstoke. IIRC Greenford was never in the scope at all.
 