• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GTR 365 to storage

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class465fan

Member
Joined
12 Jun 2016
Messages
263
Location
abbey wood
Is there anywhere else besides from the WCML, Northern rail or Scotrail for them to go to without having to receive expensive modifications?:(
 

SEClass375

Member
Joined
16 Aug 2016
Messages
112
Unless by expensive you mean putting shoes on them, I would like them to replace the 465(/9)s that do the Tunbridge Wells stoppers which can only dream of doing 90mph let alone 100.
 

KingJ

Member
Joined
23 Dec 2012
Messages
200
Unless by expensive you mean putting shoes on them, I would like them to replace the 465(/9)s that do the Tunbridge Wells stoppers which can only dream of doing 90mph let alone 100.

Will be interesting to see if any of of the bidders for the new franchise suggest this in their bids...
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,758
Location
Central Belt
Is there anywhere else besides from the WCML, Northern rail or Scotrail for them to go to without having to receive expensive modifications?:(

In theory any 25kV railway. However all stock is accounted for by new orders. So unless we get some stunning growth it is unlikely. Maybe a clever EMT bid?

My joke about Scotrail is they could get desperate. 170s going. 385s not arriving. Likely to happen no. Driver training etc. Give Scotrail the 700s and we keep the 365s. Not as if the Cambridge stopped is going anywhere near the core soon.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,162
As I’ve said countless times the 365s can be considered AC only, and are very limited as to their future scope. Especially taking into account the plethora of newer fleets.
 

170401

Member
Joined
9 Feb 2010
Messages
252
Quick, get them cleared for Edinburgh- Glasgow.

Scotrail may need them in place of the 385 was if they don’t sort the visibility issues.

If they were on the ball, they could extend the wires up to Dundee quickly and when they finish using them for 385 cover they could migrate them onto the Queen st - Dundee stoppers!!!
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,162
The 365s? They’re not going to get cleared quickly.
 

whhistle

Established Member
Joined
30 Dec 2010
Messages
2,636
Give Scotrail the 700s and we keep the 365s.
Why make such a silly suggestion?


This is where I fail to understand our railway.
We put stupid design restrictions in place "just in case" but never actually fulfil the "just in case" clause. For example putting pantograph wells into 3rd rail stock. Yes, flexibility is great but it's so unlikely they'll ever see pantographs, it it really worth doing?

Surely the loading gauge has a maximum everywhere on UK metals, and so any train within that range should be able to go anywhere? I know there are small differences, but all trains fit within a certain "tunnel".

Alternatively, it shouldn't be huge jobs to clear routes - surely all trains fit within the maximum gauge for track alignment / tunnels / platforms and such.
Not suite sure I understand, that if they don't, why are different routes so different - I thought that was what the loading gauge was supposed to sort out?
 
Last edited:

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,758
Location
Central Belt
Why make such a silly suggestion?

It wasn’t serious as if you read the whole post I think many noticed. But the logic was the 700s are Siemens units if Scotrail are desperate then they may get them into use quicker. (Or of course they could have no similarities to their Siemens units at all).

It does amaze me the lack of humour of some people on the forum.

It is not as if anything other than keeping existing trains can get Scotrail out of their hole before May. (Something which northern quite rightly will never allow)
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,348
Location
Hertfordshire / Teesdale
Why make such a silly suggestion?


This is where I fail to understand our railway.
We put stupid design restrictions in place "just in case" but never actually fulfil the "just in case" clause. For example putting pantograph wells into 3rd rail stock. Yes, flexibility is great but it's so unlikely they'll ever see pantographs, it it really worth doing?

Surely the loading gauge has a maximum everywhere on UK metals, and so any train within that range should be able to go anywhere? I know there are small differences, but all trains fit within a certain "tunnel".

Alternatively, it shouldn't be huge jobs to clear routes - surely all trains fit within the maximum gauge for track alignment / tunnels / platforms and such.
Not suite sure I understand, that if they don't, why are different routes so different - I thought that was what the loading gauge was supposed to sort out?

To be fair, the 365s have worked on DC - the first 16x units spent the first few years of their life working for Connex South Eastern. 365502 was even temporarily hired to WAGN for a short while after the Potters Bar derailment.

The inability to easily revert to DC seems to be more the result of modifications done when the units were transferred to WAGN in the mid 2000s. However, this view doesn't seem to be entirely reflected in documentation originating from their owners, which still clearly describes them as dual voltage capable. A lot of course would come down to cost, in other words would it be worth a lengthy and costly period of development work when other DC (e.g. 458s) fleets may be more readily available.
 

whhistle

Established Member
Joined
30 Dec 2010
Messages
2,636
It does amaze me the lack of humour of some people on the forum.
I just didn't see the humour.
But then I'd just come from the thread on rebuilding the 370 for HS2... as a serious suggestion.
Happy to admit I get tired of people making stupid suggestions that they think are so likely, it's worth posting.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,025
Location
St Albans
It wasn’t serious as if you read the whole post I think many noticed. But the logic was the 700s are Siemens units if Scotrail are desperate then they may get them into use quicker. (Or of course they could have no similarities to their Siemens units at all).

It does amaze me the lack of humour of some people on the forum.

It is not as if anything other than keeping existing trains can get Scotrail out of their hole before May. (Something which northern quite rightly will never allow)

It was yet another 'broken record' post about class 700s. Soon, those class 365s that aren't converted into tin foil, will be settled into their new (minimal) role and the 700s will settle down for the next 30+ years on TL (including GN) services. Yes, these posts are fun to read.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,758
Location
Central Belt
I just didn't see the humour.
But then I'd just come from the thread on rebuilding the 370 for HS2... as a serious suggestion.
Happy to admit I get tired of people making stupid suggestions that they think are so likely, it's worth posting.

Your point on however on you post that the railway has no plan B is true.

The 365s are in store with nothing to do. But if we did say let’s get them in service in Scotland it would take months. No chance before May. (No idea if it would even be possible before August).

But even if you look at stock cleared for the route. Mk2 / 3 coaches and loco. Again we have no way of making this happen quickly. So we have a problem on the route with no easy solution.

I remember when the mk4s and 155s with withdrawn we saw some very interesting solutions. (321s / 317s on IC journeys). The 155s got the loco hauled stock out. Does the railway have the capability to react quickly to the 385 problem any more. I digress from the topic however. But the 365s are in store but can’t really be used for anything quickly.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,348
Location
Hertfordshire / Teesdale
It was yet another 'broken record' post about class 700s. Soon, those class 365s that aren't converted into tin foil, will be settled into their new (minimal) role and the 700s will settle down for the next 30+ years on TL (including GN) services. Yes, these posts are fun to read.

Like the posts along the lines of "700s will never get tables until a mid-life refurb?".
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,758
Location
Central Belt
It was yet another 'broken record' post about class 700s. Soon, those class 365s that aren't converted into tin foil, will be settled into their new (minimal) role and the 700s will settle down for the next 30+ years on TL (including GN) services. Yes, these posts are fun to read.
?

Did the post actually direct any criticism to the 700s or just state Scotrail had Siemens units. Are the 385s not desiro city derivatives? Therefore more similar to what Scotrail have than the 365s? You reading what you want to read?

Irrespective i think I have cleared this up with the poster involved and they understand it wasn’t serious.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,114
To be fair, the 365s have worked on DC - the first 16x units spent the first few years of their life working for Connex South Eastern. 365502 was even temporarily hired to WAGN for a short while after the Potters Bar derailment.

The inability to easily revert to DC seems to be more the result of modifications done when the units were transferred to WAGN in the mid 2000s. However, this view doesn't seem to be entirely reflected in documentation originating from their owners, which still clearly describes them as dual voltage capable. A lot of course would come down to cost, in other words would it be worth a lengthy and costly period of development work when other DC (e.g. 458s) fleets may be more readily available.

Wasn't a DC wiring loom (kept as an example in case of conversion back to DC) lost during a depot clear out in FCC days? Probably thrown away along with the floppy discs used to updated the original PIS system.
 

Class465fan

Member
Joined
12 Jun 2016
Messages
263
Location
abbey wood
It's been said that "there is at least one set with Cross Country, which operated between Cambridge and Birmingham." Find that hard to believe that as they're not clear to go to Birmingham right?
 

Class465fan

Member
Joined
12 Jun 2016
Messages
263
Location
abbey wood
That's what i was thinking. How can it operate between Cambridge and Birmingham if half of the lines (or shall i say most) Cross Country run on lacks Overhead wires?
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,407
Location
UK
It's been said that "there is at least one set with Cross Country, which operated between Cambridge and Birmingham." Find that hard to believe that as they're not clear to go to Birmingham right?

There's a distinct lack of wires between Cambridge & Birmingham...
 
Status
Not open for further replies.

Top