Class465fan
Member
Or they could replace the 318s?Quick, get them cleared for Edinburgh- Glasgow.
Scotrail may need them in place of the 385 was if they don’t sort the visibility issues.
Or they could replace the 318s?Quick, get them cleared for Edinburgh- Glasgow.
Scotrail may need them in place of the 385 was if they don’t sort the visibility issues.
What route in the GA network are they clear to run on?
Or they could replace the 318s?
Unless by expensive you mean putting shoes on them, I would like them to replace the 465(/9)s that do the Tunbridge Wells stoppers which can only dream of doing 90mph let alone 100.
Is there anywhere else besides from the WCML, Northern rail or Scotrail for them to go to without having to receive expensive modifications?![]()
Quick, get them cleared for Edinburgh- Glasgow.
Scotrail may need them in place of the 385 was if they don’t sort the visibility issues.
Why make such a silly suggestion?Give Scotrail the 700s and we keep the 365s.
Why make such a silly suggestion?
Why make such a silly suggestion?
This is where I fail to understand our railway.
We put stupid design restrictions in place "just in case" but never actually fulfil the "just in case" clause. For example putting pantograph wells into 3rd rail stock. Yes, flexibility is great but it's so unlikely they'll ever see pantographs, it it really worth doing?
Surely the loading gauge has a maximum everywhere on UK metals, and so any train within that range should be able to go anywhere? I know there are small differences, but all trains fit within a certain "tunnel".
Alternatively, it shouldn't be huge jobs to clear routes - surely all trains fit within the maximum gauge for track alignment / tunnels / platforms and such.
Not suite sure I understand, that if they don't, why are different routes so different - I thought that was what the loading gauge was supposed to sort out?
I just didn't see the humour.It does amaze me the lack of humour of some people on the forum.
It wasn’t serious as if you read the whole post I think many noticed. But the logic was the 700s are Siemens units if Scotrail are desperate then they may get them into use quicker. (Or of course they could have no similarities to their Siemens units at all).
It does amaze me the lack of humour of some people on the forum.
It is not as if anything other than keeping existing trains can get Scotrail out of their hole before May. (Something which northern quite rightly will never allow)
I just didn't see the humour.
But then I'd just come from the thread on rebuilding the 370 for HS2... as a serious suggestion.
Happy to admit I get tired of people making stupid suggestions that they think are so likely, it's worth posting.
It was yet another 'broken record' post about class 700s. Soon, those class 365s that aren't converted into tin foil, will be settled into their new (minimal) role and the 700s will settle down for the next 30+ years on TL (including GN) services. Yes, these posts are fun to read.
?It was yet another 'broken record' post about class 700s. Soon, those class 365s that aren't converted into tin foil, will be settled into their new (minimal) role and the 700s will settle down for the next 30+ years on TL (including GN) services. Yes, these posts are fun to read.
To be fair, the 365s have worked on DC - the first 16x units spent the first few years of their life working for Connex South Eastern. 365502 was even temporarily hired to WAGN for a short while after the Potters Bar derailment.
The inability to easily revert to DC seems to be more the result of modifications done when the units were transferred to WAGN in the mid 2000s. However, this view doesn't seem to be entirely reflected in documentation originating from their owners, which still clearly describes them as dual voltage capable. A lot of course would come down to cost, in other words would it be worth a lengthy and costly period of development work when other DC (e.g. 458s) fleets may be more readily available.
It's been said that "there is at least one set with Cross Country, which operated between Cambridge and Birmingham." Find that hard to believe that as they're not clear to go to Birmingham right?
It's been said that "there is at least one set with Cross Country, which operated between Cambridge and Birmingham." Find that hard to believe that as they're not clear to go to Birmingham right?
Might struggle without any wires.
Go via East Coast, North London line and West Coast. Where's the issue?There's a distinct lack of wires between Cambridge & Birmingham...