There's a brief update on the Bedwyn turnback siding in the latest Rail magazine (page 24). Looks like it's planned to be done in the August blockade at the end of the month.

Good to see common sense has prevailed and stations like Bedwyn, Hungerford etc are retaining their through services to Paddington.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
Newbury Area Wires

As of this morning, there is still a gap on both lines east of Newbury Racecourse.

Wires complete on the DM & DPL from east of the A339 bridge to the limit of Electrification.
Is the last photo in this set showing the limit of the wiring, given that the tension devices are on masts at the side of the track, rather than on the usual portals?
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
There's a brief update on the Bedwyn turnback siding in the latest Rail magazine (page 24). Looks like it's planned to be done in the August blockade at the end of the month.
"Done"? Does this mean wired up, or lengthened for IETs?
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
Is the last photo in this set showing the limit of the wiring, given that the tension devices are on masts at the side of the track, rather than on the usual portals?
Correct.
Distance passed the west crossover allows an EMU to shunt from the down side to the up.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
Exactly, that's why I asked!
Yes, the Bedwyn turnback is an IEP facility rather than “electrification” related, but all the previous discussion seems to have found its way into this thread. Possibly too late to worry now.
 

class26

Member
Joined
4 May 2011
Messages
1,197
Because rightly or wrongly Newbury is where the DfT decided the wires should end.

The DfT did ask Network Rail to cost up an extension of the wires to Bedwyn but that was before the massive cost overruns so i guess this got quietly forgotten !
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The DfT did ask Network Rail to cost up an extension of the wires to Bedwyn but that was before the massive cost overruns so i guess this got quietly forgotten !
I thought it was dropped when the whole scheme was still at the design stage. The benefit/cost ratio didn't justify it - even on the costs that were being assumed then, let alone as they are now.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
I thought it was dropped when the whole scheme was still at the design stage. The benefit/cost ratio didn't justify it - even on the costs that were being assumed then, let alone as they are now.
One of the main factors for costs spiralling out of control the way they did was that design works were still ongoing during construction IIRC. But that's beside the point - Newbury is the end of the wires for now.

Bedwyn services, as covered at length earlier upthread, will be 80x operated, with diesel used west of Newbury.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
Tying up some loose ends here and there, away from the B&H Blockades.
Bristol Parkway now has some SPS up on *some* of the TTCs in the station.
Additionally, another hefty TTP appears to have gone up over the P2/3 lines at the country end, as seen in this photo here.

More masts have gone up in the Undy area (west of STJ), as seen here.
East Usk Yard is looking more complete too, as seen here.
Masts in many forms have now reached Newport ADJ; it looks like the yard is being left out of the wiring equation for the time being.
Pengam Jct has gained SPS all along one portal boom; seen here on the 22nd of July.
Cardiff Central itself has aso gained a few piles at the eastern edge, just east of Penarth Rd Overbridge (at the station's eastern throat).
4 brackets for OLE also appear to be in place on the viaduct over the Taff (in front of the first tank in this photo).
 

PointsWest

Member
Joined
26 May 2014
Messages
7
Not sure if its already been mentioned, but the remains of the old footbridge at Newport are due to be lifted this coming weekend.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
Not sure if its already been mentioned, but the remains of the old footbridge at Newport are due to be lifted this coming weekend.
That's welcome news indeed. AIUI that was the final obstacle to be removed in the station before the wires could arrive.
 

jyte

Member
Joined
27 Oct 2016
Messages
671
Location
in me shed
Extensions to Newbury and Westbury both had benefit:cost ratios of less than 1, and that's before costs went and...well, rose.
 

Phil G

Member
Joined
16 Oct 2017
Messages
183
Although nothing is supposed to be happening west of Chippenham, I'm pretty sure there are some new posts around Thingley. May be wrong but sure I've not seen them before, anyone know for sure?
 

Charlie M.

Member
Joined
4 Oct 2015
Messages
170
Location
Gloucester
Although nothing is supposed to be happening west of Chippenham, I'm pretty sure there are some new posts around Thingley. May be wrong but sure I've not seen them before, anyone know for sure?

Was looking out a HST window and not much work? Not that much depth to see though.
 
Joined
9 Nov 2017
Messages
260
Although nothing is supposed to be happening west of Chippenham, I'm pretty sure there are some new posts around Thingley. May be wrong but sure I've not seen them before, anyone know for sure?
Perhaps some vegetation clearance works have exposed some already in situ? I can say with a fair degree of certainty that no OLE structural works are happening West of Chippenham until further notice from the DfT.
 

Wychwood93

Member
Joined
25 Jan 2018
Messages
693
Location
Burton. Dorset.
Perhaps some vegetation clearance works have exposed some already in situ? I can say with a fair degree of certainty that no OLE structural works are happening West of Chippenham until further notice from the DfT.
I remain somewhat puzzled that OLE did not continue slightly west of Chippenham - surely better for an up start to have 25kw available? On the other hand, had they ended west there may, perhaps, have been a need to have 'suitable' wiring towards both Melksham and Bath. Apologies if covered before - as now page 249 I am not going to surf through the previous 248!
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Perhaps some vegetation clearance works have exposed some already in situ? I can say with a fair degree of certainty that no OLE structural works are happening West of Chippenham until further notice from the DfT.

A number of uprights were installed in the Thingley junction area earlier in the year, so that may be what was seen, or if a crew was available for a shift, could not do any work elsewhere and the right steelwork was to hand, can't see why you would not send them to a place they could do something productive irrespective of any 'moratorium'.

After all, time and money was put into installing the isolated group of uprights south of Appleford last year - since when nothing has been done to fill the gap from there to Didcot.

Below is from 59CosG95's most recent update of electrification progress

Chippenham (Cocklebury Lane Bridge) - Thingley Jct
  • No piles in Chippenham station, nor any masts affixed to the viaduct.
  • All piles in and majority of masts (and cantilevers) up from the western end of the viaduct to Thingley Junction (where the feeder station will be). About 14 masts are up in the vicinity of Thingley Feeder Stn, 2 of which have TTC booms affixed. Another has an STC boom.
  • Piles continue westwards to the next bridge.
 
Last edited:

Phil G

Member
Joined
16 Oct 2017
Messages
183
As I said, I couldn't be sure the stuff was new as although I travel the line every day I don't always look out of the window. There has been no significant vegetation clearance to the point that some of the masts are now completely engulfed in trees. The things that jumped out at me as new were the mast and TTC just west of the A350 bridge and the masts just West of the melksham branch which are the furthest West masts on the line. They were probably there all along. It does all look so close to completion with TTCs all along the embankment that it's hard to believe that will be just left to rot.
 
Joined
9 Nov 2017
Messages
260
A number of uprights were installed in the Thingley junction area earlier in the year, so that may be what was seen, or if a crew was available for a shift, could not do any work elsewhere and the right steelwork was to hand, can't see why you would not send them to a place they could do something productive irrespective of any 'moratorium'.

After all, time and money was put into installing the isolated group of uprights south of Appleford last year - since when nothing has been done to fill the gap from there to Didcot.

Below is from 59CosG95's most recent update of electrification progress
If a shift of steelwork installers was cancelled at such short notice (say 48hrs) that they still had to be paid for, moving them elsewhere would be unlikely.

At that point, adding a new non-emergency worksite or possession would be almost impossible. All of the plant and materials would have to be hauled by HGVs to a new location. The new location may require different sized materials with a lead time.

At this point, taking the hit of the cancelled shift is probably the cheaper, if not the only option.
 

47421

Member
Joined
7 Feb 2012
Messages
686
Location
london

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
As was discussed on the previous page of this thread.
As it has been raised again, I do think that if conditions had been imposed on materials and design, to reflect the history of the structure, that would have been a way forward. To raise irrelevant issues about temporary community severance on a LB consent application, when the statutory body EH, itself, does not object, is a recipe for costing local council taxpayers a packet at appeal, IMO, and I expect council officers' opinion too.
 

DidcotDickie

Member
Joined
12 Mar 2017
Messages
160
Location
Oxfordshire
...... To raise irrelevant issues about temporary community severance on a LB consent application, when the statutory body EH, itself, does not object, is a recipe for costing local council taxpayers a packet at appeal, IMO, and I expect council officers' opinion too.

Spot on. As a Vale of White Horse Council taxpayer, I'm less than impressed. I've seen the planning committee go against the advice of its officers previously for good reasons - and this is not one of them. I expect Network Rail to take them to the cleaners on appeal.

IMO as a local (tho I don't live in Steventon), the whole kerfuffle about the replacement of this bridge has been about access to the village, with people (not unreasonably) being concerned about a 10 month closure which will kill some of the businesses in the village as well as cause congestion elsewhere, particularly when there's a prang on the adjacent section of the A34.
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
B&H Wiring

As far as I can tell, the ONLY wiring still to be completed is;

Reading West station country end crossover.
Southcote Junction, crossover between up & down B&H (used by up Basingstoke services).
Up Basingstoke to down B&H (catenary wire up).
Theale East both lines. Wire runs through the crossovers, just the 2 straight wire runs to do.
MP51 1/4 for just under 3/4 mile on both lines (Kennet Viaduct).

Newbury
DSC01399.JPG DSC01403.JPG DSC01389.JPG DSC01400.JPG DSC01402.JPG DSC01401.JPG DSC01397.JPG DSC01392.JPG DSC01391.JPG DSC01393.JPG

Next possession (including Southcote J) Saturday night 11/08.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
As it has been raised again, I do think that if conditions had been imposed on materials and design, to reflect the history of the structure, that would have been a way forward. To raise irrelevant issues about temporary community severance on a LB consent application, when the statutory body EH, itself, does not object, is a recipe for costing local council taxpayers a packet at appeal, IMO, and I expect council officers' opinion too.

Do you not get the process involved here?

All the planning committee was being asked to do was decide whether or not to grant listed building consent (and please don't write things like 'LB consent' in posts) to Network Rail to demolish the existing bridge. Such an application has nothing at all to do with what might happen afterwards.

If we ever get to the prior approval process under which Network Rail will be putting forward its proposed design for a replacement structure, things like materials can be discussed - but prior approval is not the same thing as an application for planning permission, so the local planning authority cannot impose any conditions, just give its views on what is proposed, as I said back up the thread.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Spot on. As a Vale of White Horse Council taxpayer, I'm less than impressed. I've seen the planning committee go against the advice of its officers previously for good reasons - and this is not one of them. I expect Network Rail to take them to the cleaners on appeal.

IMO as a local (tho I don't live in Steventon), the whole kerfuffle about the replacement of this bridge has been about access to the village, with people (not unreasonably) being concerned about a 10 month closure which will kill some of the businesses in the village as well as cause congestion elsewhere, particularly when there's a prang on the adjacent section of the A34.
Indeed and very reasonably so, that locals have concerns, but as you point out, that has no bearing on the Listed Building (LB) consent (apologies for my use of initials, also EH is English Heritage). If NR (Network Rail :) ) just wanted to demolish the bridge and had no commitment to replace it, that of course would be a different matter, as the road is a public right of way (I assume).
 