There's a brief update on the Bedwyn turnback siding in the latest Rail magazine (page 24). Looks like it's planned to be done in the August blockade at the end of the month.
Good to see common sense has prevailed and stations like Bedwyn, Hungerford etc are retaining their through services to Paddington.










) just wanted to demolish the bridge and had no commitment to replace it, that of course would be a different matter, as the road is a public right of way (I assume).