jyte
Member
Good question. Now that I have the magazine, they also suggest, in a short piece on page 9 quoting the NAO report, that the intention is "to complete these projects in CP6 (2019-24)".
Maybe the footnote saying "2024 at the earliest" should have been "2024 at the latest"?
With the GWML project "deferred" (most likely into CP6) will other CP6 projects take priority? (That's if the CP6 works have even been decided yet.)