When does the Acton DiveUnder open please?
I haven't read the NAO report yet. To be honest, I had hoped someone would give, or point to, a summary, that would nail down the reasons for the cost increase. As an outsider-taxpayer, I don't have even a sense of how it occurred. All this about unknown buried cables, erection train shortcomings and so on don't hack it for me. We are talking of a gigantic increase in the original estimate and I suppose I will have to read the report. I have a feeling I won't get further, as if the real reason for this huge spending, in so short a period, had been identified by the NAO, then it would have been shouted from the rooftops.
In a footnote to Table 1 in Roger Ford's column in the December Modern Railways, the recently deferred sections are described as deferred until 2024 at the earliest, i.e., presumably, the end of CP6. Is there any authoritative basis for this?
We knew about it before, but the Dec MR also has a piece about the Cardiff area resignalling.
It says 31 signal gantries at Newport need height alterations because they were designed before electrification was authorised.
Even more incredibly, new signalling at Port Talbot needs immunisation for electrification.
This is one reason why Cardiff-Swansea wiring is in trouble.
It's bad enough that BR installed non-immunised signalling on the GWML in the 1970s, but the Port Talbot stuff is less than 10 years old.
Pretty sure there isn't, all that has been decided is that they will be deferred into CP6. As far as I know it has yet to be decided what can and what cannot be delivered in CP6. However, Mr. Ford has his "informed sources".In a footnote to Table 1 in Roger Ford's column in the December Modern Railways, the recently deferred sections are described as deferred until 2024 at the earliest, i.e., presumably, the end of CP6. Is there any authoritative basis for this?
Even more incredibly, new signalling at Port Talbot needs immunisation for electrification.
This is one reason why Cardiff-Swansea wiring is in trouble.
It's bad enough that BR installed non-immunised signalling on the GWML in the 1970s, but the Port Talbot stuff is less than 10 years old.
It says 31 signal gantries at Newport need height alterations because they were designed before electrification was authorised.
Even more incredibly, new signalling at Port Talbot needs immunisation for electrification.
There are no additional substations to be built on the section you are asking about. Kensal Green is existing, and the Reading - Didcot test section is fed from Didcot, both are already switched on.
I meant along the whole of the GWR that's being electrified, not just the sections that have the masts and mast & knitting in place
I meant along the whole of the GWR that's being electrified, not just the sections that have the masts and mast & knitting in place
That's what comes of not having a long-term plan. Or rather, having a long-term plan and diametrically reversing it.
How much extra would it have cost to install signaling compatible with electrification?
Well in the latest edition of Modern Railways in Roger Fords column he says that 'if video killed the radio star, bi-modes have injured electrification'. Seems like my sentiments towards bi-modes and electrification are entirely justified. I doubt there will be any push to finish off GW electrification, they simply don't need to with the Hitachi bi-modes in place as they can simply point to them as 'improving passengers journeys'.
I meant along the whole of the GWR that's being electrified, not just the sections that have the masts and mast & knitting in place
I think that bi-modes have saved the modernisation programme, not 'injured' it. The programme is delayed for no reasons to do with bi-modes.
There is also the fourth substation near Cardiff of which I know no details other than it is one of the four planned.
It's been deferred indefinitely with no commitment to complete it! Why? Ow yeah because they don't need to complete it because of bi-modes! A very well respected industry expert seems to believe bi-modes are part of the reason it's being deferred indefinitely, so I think my posts and opinions are entirely justified even if you don't.
It's where Green Lane crosses the SWML at St Brides between Newport and Cardiff.
for application 14/0295 at http://www.newport.gov.uk/en/Planni...nning-applications/Planning-applications.aspx
It's where Green Lane crosses the SWML at St Brides between Newport and Cardiff.
Search for application 14/0295 at http://www.newport.gov.uk/en/Planni...nning-applications/Planning-applications.aspx
Piles & concrete foundations approximately 50m apart required to support overhead electrical lines.
Approx. 5000 piles
Approx. 800 concrete foundations
Installation of the supporting structures and the Overhead Line Equipment (OLE).
Approx. 4300 Single Track Cantilever
- Approx. 1450 Twin Track Cantilever (Mast + Boom)
- Approx. 170 Four Track Portals (Masts + Boom)
- Approx. 7750 Registration & Support
It's where Green Lane crosses the SWML at St Brides between Newport and Cardiff.

Beat you to it in post #3791...!
According to the NR Environmental Statement there is (was?) also to be a feed at Canton depot.
NR just simply hasn't kept to its planned schedule and it may be lack of finance that causes further delays, rather than any other reason.
That would be unusually close for two feeder stations, wouldn't it?Beat you to it in post #3791...!
According to the NR Environmental Statement there is (was?) also to be a feed at Canton depot.
It may be somewhat out of date, but I found this presentation by ABC Electrification on their work on the SW main line (Patchway westwards).
http://www.cewales.org.uk/files/2514/5795/2521/ABC_presentation.pdf
I didn't know they were the main contractor for South Wales, and explains why work has seemed out of synch with the main Amey project based in Swindon.
There are some interesting pictures of the work, and some stats, like these:
That would be unusually close for two feeder stations, wouldn't it?
Maybe they're like that in preparation for the Valley lines being wired too?
As of January Amey are taking over from ABC.