Philip Phlopp
Established Member
- Joined
- 31 May 2015
- Messages
- 3,003
Indeed, basically it goes in the pot for CP6 and will have to compete with everything else when the time comes.
Actually I don't like the position on Bristol-Cardiff staying diesel.
A frequent inter-urban (Bath-) Bristol-Cardiff-Swansea EMU service is just what the region needs and the railway can deliver.
But we seem wedded to through DMU workings from Cardiff which relatively few people use as such at the Bristol end.
Part of this is the turf war between GW and W&B franchises, and DfT/WG control.
The relief line speed/capacity upgrade will need done, whether it needs wired though, is a different question.
The main reason to wire it (if it's much of a reason) is to use Class 387 stock in 12 car formation on rugby/event specials to Cardiff. Mark Hopwood was discussing that quite recently. The Wales RUS assumes the reliefs will be wired too.
