Great Western Electrification Progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
After observing the Pangbourne area I can safely say this type of gantry setup seems more obstructive than other OHLE lines for the enthusiast.

Can we assume this type of gantry and OHLE setup is to be used elsewhere on the network or is the design chosen for a specification or location?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Can we assume this type of gantry and OHLE setup is to be used elsewhere on the network or is the design chosen for a specification or location?

It is. MML will be electrified using the same Series 1 OLE.

The Series 2 OLE being used elsewhere will be similarly robust, with portals, cantilever structures and gantries employed in place of headspans.

I know it's ruining a few vantage points, but there are some pretty spectacular viewing spots on the WCML, so when it comes to the GWML, it's just a case of digging out the old OS map, looking for public rights of way, and finding new spots.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,662
It is. MML will be electrified using the same Series 1 OLE.

The Series 2 OLE being used elsewhere will be similarly robust, with portals, cantilever structures and gantries employed in place of headspans.

I know it's ruining a few vantage points, but there are some pretty spectacular viewing spots on the WCML, so when it comes to the GWML, it's just a case of digging out the old OS map, looking for public rights of way, and finding new spots.

Some of the 'engineering' on the series 1 is leading to slightly less massive steelwork if i understand correctly from recent Modern Railways.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Some of the 'engineering' on the series 1 is leading to slightly less massive steelwork if i understand correctly from recent Modern Railways.

Mast height decreases where portals and twin track cantilevers are used in place of headspans. Factors vary but 10ft lower isn't unusual.

The Series 1 twin track cantilever is slightly smaller than the previous twin track cantilever design of the sort used elsewhere (NW Electrification etc).

Small part steelwork is much lower profile.
 

gwr4090

Member
Joined
9 Nov 2011
Messages
144
Rumoured that first live testing of OLE between Tilehurst and Didcot is due on Sat 16 July using the first two Class 800 IEPs ? Any confirmation ?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Rumoured that first live testing of OLE between Tilehurst and Didcot is due on Sat 16 July using the first two Class 800 IEPs ? Any confirmation ?

I thought IEP testing was planned for the end of September?
There will be a lot of snagging to do first, and you'd expect some more basic rolling stock to be used - something old and bog-standard like a class 90.
There's a lot of very new electrical infrastructure to be tested before the wheels start roiling.
As noted before, Test Coach Mentor from Derby will test the OHLE before any commercial rolling stock is used.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,467
Location
Preston Lancs
I thought IEP testing was planned for the end of September?
There will be a lot of snagging to do first, and you'd expect some more basic rolling stock to be used - something old and bog-standard like a class 90.
There's a lot of very new electrical infrastructure to be tested before the wheels start roiling.
As noted before, Test Coach Mentor from Derby will test the OHLE before any commercial rolling stock is used.

Top and Tailed by diesel locomotives I assume?
 

steverailer

Member
Joined
15 Feb 2013
Messages
169
Testing could/will start this weekend, take a look at this RTT path for Saturday night:

http://www.realtimetrains.co.uk/train/K97549/2016/07/16/advanced

That's a Class 800 testing on the live line between Reading and Didcot.

And this will be the NR test train to go with it:

http://www.realtimetrains.co.uk/train/U35546/2016/07/16/advanced

This is probably being used for the OLE testing not the actual train testing.

Been a mad rush this week to get the mains ready for the test train to run. It's not been done to the final hand over registration, just enough to get it safe to run the train, then teams will be back out in the coming weeks for the final registration and installation of the missing ATF.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
This is probably being used for the OLE testing not the actual train testing.

I believe IEP is there to make use of the installed pantograph/OLE monitoring equipment, but as with everything be so tight for time, it could do other testing at the same time.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
IET testing on GWML as I arrived at work this morning. 800002 & looks like 800001 (plain grey with black HITACHI & Class 800 lettering) paired up on the UM over the viaduct at Reading.

A video of the pair, no sound, it was taken through the office window.

https://youtu.be/T49ZYCakwBs
 
Last edited:

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
Well, did the wires get tickled overnight?
That's rather more important than which locos were on the test train.

As I left the office after lates yesterday the NR infrastructure/projects guys in the corner were rushing around putting lots of last minute bits and pieces together, amending possessions and so forth to have it ready for testing. It all seems to have been organised very quickly, with lots of little details forgotten about until the last minute - for example there was a 1hr line block of the main lines before the possession was due to go on for someone to go in and remove earth straps, caused some delay routing everything over the reliefs.

Given the effort being made Id be surprised if there wasn't a bit of roofzap action, will find out later I guess!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Well, hats off to NR and Hitachi for pulling it off.
I thought they would be starting with some low-key load bank or class 90 tests at low speed, not the full whack IEPs at 125mph.
So is this the "September" tests starting early, or is it some other phase of the testing?
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Well, hats off to NR and Hitachi for pulling it off.
I thought they would be starting with some low-key load bank or class 90 tests at low speed, not the full whack IEPs at 125mph.
So is this the "September" tests starting early, or is it some other phase of the testing?

It appears to be (in part, at least) two pantograph testing to assess the catenary oscillation behaviour. The data from the both IEP units will be assessed, but it'll be the data from the rear unit that's of particular interest.

It's essentially IEP being used to test the catenary, rather than the start of IEP testing on electric, if that makes sense, though I'm sure no data will be wasted by either NR or Hitachi/Agility.
 

GazK

Member
Joined
11 Feb 2012
Messages
73
Location
x
The interaction of a 2x5 car IEP (with 2 pans up) with series 1 OLE has already been tested extensively at 125mph at Old Dalby. This is merely the latest in a long series of tests so the risk was low.

Sent from my HTC One_M8 using Tapatalk
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
The interaction of a 2x5 car IEP (with 2 pans up) with series 1 OLE has already been tested extensively at 125mph at Old Dalby. This is merely the latest in a long series of tests so the risk was low.

Sent from my HTC One_M8 using Tapatalk

Bit less Series 1 OLE at Old Dalby, of course.

It was all modelled extensively of course, it's more a case of confirming behaviour as expected.
 
Last edited:

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
It appears to be (in part, at least) two pantograph testing to assess the catenary oscillation behaviour. The data from the both IEP units will be assessed, but it'll be the data from the rear unit that's of particular interest.

It's essentially IEP being used to test the catenary, rather than the start of IEP testing on electric, if that makes sense, though I'm sure no data will be wasted by either NR or Hitachi/Agility.

I'm surprised they've started both at once, since it makes it more difficult to work out where the problem is if something does indeed go wrong. Scientific to only change one variable etc. etc.

On a separate note, does this mean we're likely to see more resources going back to areas other than the test section soon?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I'm surprised they've started both at once, since it makes it more difficult to work out where the problem is if something does indeed go wrong. Scientific to only change one variable etc. etc.

They're hardly an unknown now, as has been stated, there was lots of modelling, they've been doing testing at Old Dalby for a year now, and the pantograph itself is a well known and understand quantity, long before Hitachi and IEP were even a twinkle in DfT's eye.

The worst that will happen is BW and Hitachi will end up tweaking the aerofoils ever so slightly to ensure the uplift force is as required, if they're not already spot on.
 
Last edited: