Great Western Electrification Progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
I rolled my eyes at the suggestion of a three car AC EMU being reduced to a two car EMU by removing the Pantograph coach.

Well, that's quite an embarrassing oversight on my part. :oops:

I'm guessing it would cost too much to be worthwhile to either move the pan, or take one of the driving coaches out and make one on the middle car 153 style.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,459
Location
Preston Lancs
Well, that's quite an embarrassing oversight on my part. :oops:

I'm guessing it would cost too much to be worthwhile to either move the pan, or take one of the driving coaches out and make one on the middle car 153 style.

IMHO it is not cost per se but according to Wikipedia and my memory, the 314 were built at BREL York in 1979 so that makes them 37 years old already. So it would be trying to make a silk purse out of a sow's ear - just not worth hardly any spend (imho) with vehicles of that age.
 

450.emu

Member
Joined
21 May 2015
Messages
287
Well, that's quite an embarrassing oversight on my part. :oops:

I'm guessing it would cost too much to be worthwhile to either move the pan, or take one of the driving coaches out and make one on the middle car 153 style.

Greater Anglia could take 309601 out of storage at Pigs Bay

and retrofit plug doors at Ilford :roll: That solves the pantograph issue ;)
 

holts

Member
Joined
26 May 2016
Messages
12
Here is sunny Swansea we have the catenary masts in place for the depots etc as you leave the station you can view all the infrastructure , trouble is by the time they actually get the line electrified all this stuff will be in need of replacement , why spend all this money for no purpose ?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Here is sunny Swansea we have the catenary masts in place for the depots etc as you leave the station you can view all the infrastructure , trouble is by the time they actually get the line electrified all this stuff will be in need of replacement , why spend all this money for no purpose ?

The depot wires will probably be used for checking out IEPs when they show up at Swansea, even if they get there on diesel.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Is there a power supply to the wires?

Should be - depots have them so they can still move stock around/test electrical systems when the adjacent running lines have power off for engineering work, etc.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
OK wires survey from my trip up to town yesterday.

Paddington – yes the suburban platforms are wired, but P1/2 & their connections are not.

Crossrail has tracks down the ramp into the tunnel, but none through to OOC.

The North Pole depot access to Paddington in in use, I am not sure if powered up.

Acton Main Line looks done apart from the dive under tracks.

Stockley junction – 1 remaining spur is still under construction.

There are new masts & gantries in various locations replacing old head spans through to Stockley Junction, mostly around Acton & Stockley Junction.

The West Ealing bay is far from finished platform wise with just platform bases in, so no Greenford shuttle for ages.

Hayes & Harlington bay platform extension works seem to have stopped.

At West Drayton part of the branch has completed masts & fittings, I assume as a link so not to disrupt the main line if it is done later.

Stockley to Slough – all posts are up and most have the gantries & fixings attached. At 15 miles, there is a very short bit of wiring on the up relief.

At Slough, part of the Windsor branch has completed masts & fittings, I assume as the link so not to disrupt the main line when it is done later.

Slough - Maidenhead – there are a few missing masts and patchy masts complete with fixings.
From 21.5 miles to the east end of Taplow Station the Relief lines & up main are wired up.

There was previously a bit of wiring east of Maidenhead but I missed it!

The river Thames Bridge at Maidenhead and the station have no activity or work done
Maidenhead to Twyford – there are still missing piles and patchy masts, some with gantries.

Twyford to east of Reading – not a lot of work and just about half of the piles are in.
Reading station – no change for ages

Scours Lane – west

Down main = Scours Lane & west beyond Pangbourne wired

Up Main = Scours Lane & West beyond Pangbourne except the final lengths through Tilehusrt Station wired

Relief Lines = The Roebuck (Reading / West Berks boundary) west beyond Pangbourne wired.

I will keep an eye on the last gaps at Tilehurst and look west of Pangbourne later.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
OK wires survey from my trip up to town yesterday.

Acton Main Line looks done apart from the dive under tracks.
I think it is going to get quite a lot of work this weekend, I'd also expect a lot of other small jobs to get tackled too at the crossrail end.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
The up main through Tilehurst Station has now been partly wired.

On the BBC Berkshire news they have just announced that the wires go live from Reading to Didcot tonight!

I think not as they are not finished, but maybe some are?
 

GazK

Member
Joined
11 Feb 2012
Messages
73
Location
x
The up main through Tilehurst Station has now been partly wired.

On the BBC Berkshire news they have just announced that the wires go live from Reading to Didcot tonight!

I think not as they are not finished, but maybe some are?
The energisation notice for Scours Lane to Milton sidings which was due to take effect on Saturday night has been withdrawn in the current weekly operating notice.

Sent from my HTC One_M8 using Tapatalk
 

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,225
Location
Southall
OK wires survey from my trip up to town yesterday.

Paddington – yes the suburban platforms are wired, but P1/2 & their connections are not.

Crossrail has tracks down the ramp into the tunnel, but none through to OOC.

The North Pole depot access to Paddington in in use, I am not sure if powered up.

Acton Main Line looks done apart from the dive under tracks.

Stockley junction – 1 remaining spur is still under construction.

There are new masts & gantries in various locations replacing old head spans through to Stockley Junction, mostly around Acton & Stockley Junction.

The West Ealing bay is far from finished platform wise with just platform bases in, so no Greenford shuttle for ages.

Hayes & Harlington bay platform extension works seem to have stopped.

At West Drayton part of the branch has completed masts & fittings, I assume as a link so not to disrupt the main line if it is done later.

Stockley to Slough – all posts are up and most have the gantries & fixings attached. At 15 miles, there is a very short bit of wiring on the up relief.

At Slough, part of the Windsor branch has completed masts & fittings, I assume as the link so not to disrupt the main line when it is done later.

Slough - Maidenhead – there are a few missing masts and patchy masts complete with fixings.
From 21.5 miles to the east end of Taplow Station the Relief lines & up main are wired up.

There was previously a bit of wiring east of Maidenhead but I missed it!

The river Thames Bridge at Maidenhead and the station have no activity or work done
Maidenhead to Twyford – there are still missing piles and patchy masts, some with gantries.

Twyford to east of Reading – not a lot of work and just about half of the piles are in.
Reading station – no change for ages

Scours Lane – west

Down main = Scours Lane & west beyond Pangbourne wired

Up Main = Scours Lane & West beyond Pangbourne except the final lengths through Tilehusrt Station wired

Relief Lines = The Roebuck (Reading / West Berks boundary) west beyond Pangbourne wired.

I will keep an eye on the last gaps at Tilehurst and look west of Pangbourne later.

There are no wires in P13 at Paddington as there need to be layout changes there first.

GWR don't expect to be able to introduce the Greenford line changes and additional EMU services before September. Screenshot from the front cover of timetable E1:
Screenshot_2016-05-28-01-13-21.jpg

There is new GWR station signage appearing on the platform extension at West Ealing, as well as 4 new masts on each side of the layout around the Greenford junction.

Old headspan masts on P1 at Southall have been removed.
 

steverailer

Member
Joined
15 Feb 2013
Messages
169
The up main through Tilehurst Station has now been partly wired.

On the BBC Berkshire news they have just announced that the wires go live from Reading to Didcot tonight!

I think not as they are not finished, but maybe some are?

As I said in an earlier post put back until 25th June
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Probably not worth starting another thread for these, as much of the work is linked to GWML electrification and resignalling.

Video of diverted GWR and XC trains at Stroud, Kemble and Chippenham yesterday, plus photos of engineering trains from Westbury and Hinksey siding at Oxford using the Cotswold Line to reach a possession south of Standish junction on the Gloucester-Bristol line.

https://www.youtube.com/watch?v=rWjTOJI_n8Q
http://hondawanderer.com
http://www.petertandy.co.uk/Recentpics.html
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
How is the wiring tested before being energized? Is a loco/unit towed under the catenary with its pan up or will that network rail train with the pantograph (think it was a converted HST) be used?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
How is the wiring tested before being energized? Is a loco/unit towed under the catenary with its pan up or will that network rail train with the pantograph (think it was a converted HST) be used?

Test coach Mentor usually shows up from Derby, sandwiched with other test vehicles between a pair of 37s.
This seems to do tests both before and after energisation.
Later, a class 90 or 92 might be used to test maximum current draw.
The NW scheme also had tests with a couple of Pendolinos making standing starts in opposite directions.
No doubt IEPs will put in an appearance on the GW.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Can Virgin really insist on this? Seems like Virgin telling NR what to do. Would other operators be offered so much?

Virgin/Alstom has special OHLE monitoring equipment on a couple of Pendolinos, used for data collection on the WCML.
This was to analyse issues about dewirements when it was not clear how it happened (ie caused by train or infrastructure).
Reputedly, they could tell NR more about the state of the OHLE than NR itself.
I don't think any other TOC can do that.
The 125/140mph capability of the GW wiring will also bring its own testing issues.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Virgin/Alstom has special OHLE monitoring equipment on a couple of Pendolinos, used for data collection on the WCML.
This was to analyse issues about dewirements when it was not clear how it happened (ie caused by train or infrastructure).
Reputedly, they could tell NR more about the state of the OHLE than NR itself.
I don't think any other TOC can do that.
The 125/140mph capability of the GW wiring will also bring its own testing issues.

A subset of the IEP fleet will be fitted with similar monitoring equipment. I wouldn't be surprised if that were true of almost all new major fleets of trains.
 

smiffy9373

Member
Joined
16 Apr 2016
Messages
47
IEP and AT300 have a camera pointing at the pantograph. The driver can view the pan via the monitors in the cab if needed.
 

smiffy9373

Member
Joined
16 Apr 2016
Messages
47