edwin_m
Veteran Member
Can't be done. How long will it take to install enough water columns and water troughs. 5-10 years?
Couldn't you just drag them down the line to Chipping Sodbury and wait for the next flood?
Can't be done. How long will it take to install enough water columns and water troughs. 5-10 years?
The Cardiff Road bridge in Newport, has reopened to two-way road traffic today (Friday 29 April) after Network Rail completed essential upgrade work in preparation for the arrival of the new fleet of electric trains.
A single lane traffic management system had been in place while the bridge was replaced with a new structure, part of the Network Rails £40bn Railway Upgrade Plan to electrify the South Wales Mainline, which will provide a bigger, better, more reliable railway for passengers and businesses.
Andrew Griffiths, programme manager for Network Rail Wales said: I would like to thank the local community for their patience and understanding while we carried out the upgrade of this bridge in preparation for electrifying the railway.
The team worked hard to ensure that we completed the work on schedule and we were able to reopen the road to two-way traffic on time.
Electrification will provide a faster, greener, quieter, more reliable railway for passengers and improve links from South Wales to major towns and cities, including London.
Network Rail engineers will be returning to Cardiff Road in June to raise the bridge parapets and to minimise disruption to motorists the road will remain open, however the bus lane will be temporarily closed to ensure this work can be carried out safely.
Elsewhere in Newport work continues to upgrade Bridge Street Road bridge in the city centre and the road over the bridge will be closed to all traffic from Tuesday 3 May 2016 until late 2016 to safely complete this essential work.
Surely the Dawlish sea wall is even worse in that respect, and there have been very few incidents there.And yet I am not aware of that ever having been a problem at that location.
Not only did I live in Bath for several years both enjoying the gardens and "Brunel's theatre of Railway" without ever hearing of a problem, I don't recall NRE ever having tweeted about a "trespass incident near #Bath Spa".
Surely the Dawlish sea wall is even worse in that respect, and there have been very few incidents there.
Not sure if this is the right forum for this so apologies if not.
Someone mentioned IEP testing this autumn. I have heard a rumour from a usually very reliable source that testing between Paddington and Didcot could start as early as the introduction of the summer tmetable in May,
Presumably this will be diesel mode, unless they can energise just a part of the route (presumably Didcot end).
Has anyone else heard this or have any updated info on testing schedules?
Regards,
Pete
Cant remember where I read it but the test section ( Tilehurst to Didcot ) was targetted for a switch on at the end of May.
What's the point of energising that bit if it's still not ready East of Reading?
What's the point of energising that bit if it's still not ready East of Reading?
With all that copper up there the sooner it is energised the less chance the 40 thieves have of nicking it.
I thought contact wires were some sort of steel rather than copper?
No doubt one of the experts will be along, but the last time I took a serious look at such things, the catenary wire was twisted aluminium with a single steel strand in it for strength, but the contact wire was copper.

Have the sources actually said "energised" or just "treated as live"? The latter needs to be advised to relevant people a few weeks beforehand and will be the earliest programmed date when the wires might be energised. Actual energisation could be later.
It was always the plan to energise Reading to Didcot first for testing purposes, although I don't know if this was originally intended to link up at the same time with the existing electrification at Heathrow Junction.
Rail delays expected due to electrification work.
Rail passengers travelling through the west of England are being warned of delays.
A bridge at Royal Wootton Bassett in Wiltshire is being demolished as part of work to electrify the railway between London and south Wales.
There will be one train an hour from Bristol Parkway to London via Newbury, which will add 30 minutes to journey times on Sunday and Monday.
A bus service will run between Bath Spa station and Bristol Parkway.
Great Western Railway said some trains will be running earlier than timetabled to allow for delays of up to 50 minutes and that replacement buses would be used on some routes.
It said passengers should check their website for further information.
A BBC article on the GW electrification.
Can someone please explain the bold part, I can't understand how such a service could operate.
Presumably the direct routes Bristol Parkway/Temple Meads to Swindon are closed for the bridge works at Wootton Bassett.
The route remaining open is (Cardiff)-Bristol Parkway-Temple Meads-Bath-Trowbridge-Newbury-Reading.
Hence Bristol Parkway-London via Newbury.
It has been quite a common diversion route recently, during the Swindon resignalling and now the bridge works.
But then why do you need a bus service between Bristol Parkway and Bath Spa?
Actually all London-Cardiff services are diverted via Gloucester and there are no London trains at Bristol Parkway.
So you need a bus connection to Parkway. Today the buses seem to originate from Swindon.
Portsmouth-Bristol TM-Cardiff services are running at Filton AW.
Went to Reading yesterday and took a photo of some progress in the Ruscombe area, nowhere near as much as East of Maidenhead though.
https://flic.kr/p/Gm5xWN
Shows one of the new gantries for wires over the relief lines. It's not much but it's progress.
I live in Maidenhead too and I am surprised how little work has been carried out in and around the station area. Interestedly the original roof on the buildings on platform 4/5 has been retained and repainted! The new station canopies also have the old lift shaft grooves retained in situ; I assume this a an interim measure?
All in all I think Maidenhead Station is now a soulless cold miserable station however I live in hope that after 2 years of work that eventually the station rebuild will be completed and it will be improvement on the past!
I bloody hope those 'new' station canapies are an interim measure, although it looks scarily like something NR would implement as a 'problem solved' cost effective replacement measure. A lot of track work has occured immediately East of Maidenhead, the slow lines have been closed over the Bank Holiday to help with that. In terms of station preparation work however, it really isn't looking like a priority, maybe NR will start a lot more work over the summer. I live in Maidenhead too and see the station every day on the way to work and it's surprising how little things change there depsite the scale of the operation in hand.
When is Crossrail planned to reach Maidenhead? Dec 2019 IIRC. So is that a long enough period to do their outstanding work, and are they on time with respect to their own plans?
I thought GWR was supposed to be introducing new trains as soon as next year on the stretch to Reading, so Maidenhead would need to be done by then, not waiting for Crossrail?