leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
I do pose a question. Living at Maidenhead, I see a lot of GWR Electrification work taking place, and this is all fine and well, and I understand a lot is for Crossrail too.

My question is, the Marlow branch has recently had work taking place to cut all the trees back for what looks like preparation for electrification, but I thought that NR had decided to cancel electrification for the Marlow branch unless it a privately financed cause could be found? So why the preparation work if electrification isn't going to take place?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I do pose a question. Living at Maidenhead, I see a lot of GWR Electrification work taking place, and this is all fine and well, and I understand a lot is for Crossrail too.

My question is, the Marlow branch has recently had work taking place to cut all the trees back for what looks like preparation for electrification, but I thought that NR had decided to cancel electrification for the Marlow branch unless it a privately financed cause could be found? So why the preparation work if electrification isn't going to take place?

There has been a lot of tree clearance generally - not specifically limited to electrification works. They cleared the East Putney area a couple of years ago and that certainly isn't due any OHLE
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
There has been a lot of tree clearance generally - not specifically limited to electrification works. They cleared the East Putney area a couple of years ago and that certainly isn't due any OHLE

Concur. There's been vast areas of trackside clearance in south Hampshire as well, it must be independent of OH electrification. More likely to be aimed at reducing obstructions on the line after strong winds etc.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Concur. There's been vast areas of trackside clearance in south Hampshire as well, it must be independent of OH electrification. More likely to be aimed at reducing obstructions on the line after strong winds etc.

That and trying to reduce poor adhesion zones to prevent repeats of this year's Anglia DMU problems (where they were several units down because of flatspots)
 

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
Lots of piling works planned for this weekend in the Swindon area and as it'll be daytime works seems like an opportunity to see the HOPS train and KIROW in action if they're close enough to good vantage points. I'm out on site so I'll try to get some pics.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Concur. There's been vast areas of trackside clearance in south Hampshire as well, it must be independent of OH electrification. More likely to be aimed at reducing obstructions on the line after strong winds etc.

It's a leaf fall issue primarily, following Phil Verster's pet project a couple of years ago to blitz trackside veg as a way to reduce TDA payments.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
https://anonw.com/2016/03/26/are-the-tocs-arguing-over-the-class-387-trains/

I found this a useful read about the 387s & current planned electric services.

The National Rail planner confirms the new 'electric' service from Hayes to Paddington from 16th May. Certainly not by 387s at GTR prefer to release 442s to store than 387s to GWR! Maybe class 360s then ??

Looked at Theale yesterday, no signs of any work!
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
https://anonw.com/2016/03/26/are-the-tocs-arguing-over-the-class-387-trains/

I found this a useful read about the 387s & current planned electric services.

The National Rail planner confirms the new 'electric' service from Hayes to Paddington from 16th May. Certainly not by 387s at GTR prefer to release 442s to store than 387s to GWR! Maybe class 360s then ??
387/2 replacing 442s is completely separate to 700s replacing 387/1s which are then cascaded to GWR.

The blog author doesn't seem to realise lots of the shorter distance GWR services on the relief/branches will be 365s with 387s used for their 110mph abilities instead and is missing plenty of key facts.
Also is the work at Hayes and Harlington etc sufficiently progressed to enable EMU services to run?

The 387/1s also need modifications doing which Bombardier are taking care of hence few are unavailable at any one time and this wasn't factored into any cascade plans originally.

It is now confirmed that C2C are going to use some of the Porterbrook option.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
It's a leaf fall issue primarily, following Phil Verster's pet project a couple of years ago to blitz trackside veg as a way to reduce TDA payments.
Yes, I'm sure when Mark Carne took over at Network Rail he made it clear he didn't like train roofs with coming into contact with tree branches anywhere.
 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Back in the day the use of steam engines used to mean that encroaching vegetation often got burned away before it got too big.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Back in the day the use of steam engines used to mean that encroaching vegetation often got burned away before it got too big.

Back in the day vegetation clearance was actually a matter of routine in order to minimise the risk of lineside fires, with the local tracks gangs stopping tree growth at an early stage.

This policy continued pretty much until the early 1980s when BR cut a lot of manpower and the kind of lineside vegetation we see today took hold in many places.

Another picture of new steelwork - and tree-felling - at Denchworth.

http://hondawanderer.com/37610_37059_Circourt_2016.htm
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Back in the day vegetation clearance was actually a matter of routine in order to minimise the risk of lineside fires, with the local tracks gangs stopping tree growth at an early stage.

This policy continued pretty much until the early 1980s when BR cut a lot of manpower and the kind of lineside vegetation we see today took hold in many places.

Another picture of new steelwork - and tree-felling - at Denchworth.

http://hondawanderer.com/37610_37059_Circourt_2016.htm

People definitely forget how vast an organisation the British Transport Commission and British Railways were. BTC in 1949 employed nearly 700,000 people and even in the mid 1970s, BR had 250,000 staff, today it's closer to 190,000, quite a number of which are duplicated roles in operating centres, in depots, and in back office roles.

There's also the the cannibals feasting on the festering corpse that is Train Delay Attribution, get rid of that idiotic money-go-round and we could have every station, embankment and cutting looking like an entry for the RHS Chelsea flower show.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
There's also the the cannibals feasting on the festering corpse that is Train Delay Attribution, get rid of that idiotic money-go-round and we could have every station, embankment and cutting looking like an entry for the RHS Chelsea flower show.

Does it not focus attention on how much money should be spent on preventing delays?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Does it not focus attention on how much money should be spent on preventing delays?

It could do, if it was done properly, but the time and money is all spent arguing about the sizes of birds or who was responsible for some small bit of damage to a fence.

TDA payments kept GNER in business, we sorted out the ECML reliability (only by a little) and they ran out of money. It's a profitable sideline for First and co, their trains are packed whether they run on time or not, but if they can get a TDA payment for a delay, with the relatively low numbers of people who claim delay repay or seek compensation, they can make a little extra profit.
 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Problem is that common sense has been replaced by financial accountability. You have to be able to put a number on things because accountants run the world.
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
People definitely forget how vast an organisation the British Transport Commission and British Railways were. BTC in 1949 employed nearly 700,000 people and even in the mid 1970s, BR had 250,000 staff, today it's closer to 190,000, quite a number of which are duplicated roles in operating centres, in depots, and in back office roles.

There's also the the cannibals feasting on the festering corpse that is Train Delay Attribution, get rid of that idiotic money-go-round and we could have every station, embankment and cutting looking like an entry for the RHS Chelsea flower show.

Out of your figures above you are quoting, how many was operating side as against maintenance side.

I would guess that the 250,000 staff included drivers, guards, shunters, loco side fitters/electricians etc etc.
Now some of these staff are employed by private train maintenance companies, some are not even employed by the TOC. Cleaning staff also employed by a privates company not owned by the TOC. TOC station / office maintenance and repair staff again working for a private company on contract to the TOC.

Then shall we start looking at Network rail then How many agency staff do they contract in from labour suppliers and how many contractors have contracts with Network Rail? from Stannah to maintain the lifts through to cleaning contractors to come and clean the depot staff rooms every week on differing amounts of visits per week.

There,s nothing that you or I can do about train delay payments they are a fact of life that came with privatisation of the railway by Mr. Major the then Prime Minister, even Maggie didn,t touch the railways.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Out of your figures above you are quoting, how many was operating side as against maintenance side.

I would guess that the 250,000 staff included drivers, guards, shunters, loco side fitters/electricians etc etc.
Now some of these staff are employed by private train maintenance companies, some are not even employed by the TOC. Cleaning staff also employed by a privates company not owned by the TOC. TOC station / office maintenance and repair staff again working for a private company on contract to the TOC.

Then shall we start looking at Network rail then How many agency staff do they contract in from labour suppliers and how many contractors have contracts with Network Rail? from Stannah to maintain the lifts through to cleaning contractors to come and clean the depot staff rooms every week on differing amounts of visits per week.

There,s nothing that you or I can do about train delay payments they are a fact of life that came with privatisation of the railway by Mr. Major the then Prime Minister, even Maggie didn,t touch the railways.

NR only has 35,000 staff, the rest are accounted for through franchise operations, ROSCOs, contract maintenance etc. I'd agree there's more outsourcing, but I'd guess a headcount reduction of 50,000 probably isn't too far off what has happened from the mid 1970s.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I don't see what this has to do with GW electrification, but it's always worth reading a blast from PP. :)
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
Talking of GWML Electrification and Crossrail preparation work, I saw 1 x GBRf 66 and 4 x Colas Rail Class 70's in between Acton Mainline and Ealing broadway yesterday on the relief lines which were closed, all with ballast and new track and bits, so I'm guessing they are laying new track for Crossrail as part of the GWMl modernisation programme too.
 