Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?
Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?
My question was in the context of the last few posts on this thread. If the 387s are to enter service from May, where will they be maintained?Reading, if we are still considering the 387s and 365s. That'll be why it was fully wired from opening.
My question was in the context of the last few posts on this thread. If the 387s are to enter service from May, where will they be maintained?
Many thanks, I did a quick trawl of RTT, but must have missed the ECS moves. So North Pole becoming operational is another thing I was unaware was happening in May.Fair enough then, my mistake.
I'll suggest their temporary home will be North Pole then, as that is what is showing in the ECS moves on May 16th:
5S06 here arriving Paddington P5:
http://www.realtimetrains.co.uk/train/C44180/2016/05/16/advanced
Continues as an ECS GW 5S06 to Hayes and Harlington,
and then 5S09 arrives in P14:
http://www.realtimetrains.co.uk/train/C46521/2016/05/16/advanced
and forms an outbound GW passenger service to Hayes as 2S09:
http://www.realtimetrains.co.uk/train/C46513/2016/05/16/advanced
Looks like two units each way, each peak, so 8 moves per day at North Pole, here's the 24 hour listing:
http://www.realtimetrains.co.uk/sea...16/05/16/0000-2359?stp=WVS&show=all&order=wtt
Fair enough then, my mistake.
I'll suggest their temporary home will be North Pole then, as that is what is showing in the ECS moves on May 16th:
5S06 here arriving Paddington P5:
http://www.realtimetrains.co.uk/train/C44180/2016/05/16/advanced
Continues as an ECS GW 5S06 to Hayes and Harlington,
and then 5S09 arrives in P14:
http://www.realtimetrains.co.uk/train/C46521/2016/05/16/advanced
and forms an outbound GW passenger service to Hayes as 2S09:
http://www.realtimetrains.co.uk/train/C46513/2016/05/16/advanced
Looks like two units each way, each peak, so 8 moves per day at North Pole, here's the 24 hour listing:
http://www.realtimetrains.co.uk/sea...16/05/16/0000-2359?stp=WVS&show=all&order=wtt
Some pictures from Didcot...
Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?
It would be very good if someone could produce a map, and keep updating it on this thread as the work progresses. Not that I'm volunteering!None of it is fully wired west of Stockley.
There are a number of partially wired sections, notably between Burnham and Taplow, and between Tilehurst and Didcot.
But there is no completed wiring through any station yet (as of Monday anyway).
The power supply points are incomplete too.
I had heard the project thought were going to deliver them under their own power via the Poplar Lines from Acton Wells. That was until it was pointed out they were unwired........
They were meant to be wired in either 2015/2016 along with the connection between Acton Wells and the WCML at Willesden No.7 Junction for freight diversions during Electric Spine electrification.
Don't know if this has been said or posted before but here are the confirmed and new completion dates that Network Rail estimate they will finish different sections of the GWML Electrification Project:
Maidenhead to Didcot: December 2017
Didcot to Wootton Bassett Junction: December 2018
Wootton Bassett Junction to Bristol Parkway: December 2018
Reading to Newbury: December 2018
Bristol Parkway to Cardiff: December 2018
Didcot to Oxford: June 2019
Wootton Bassett Junction to Bristol Temple Meads: February 2019-April 2020
Filton Bank: Early CP6
EDIT: I've just tried to view the film, but I get a message saying that the view has been aborted. I've tried to go on the web site separately, i.e. not via this link, and I get the same result. I don't know when it will be working again, but I hope that you'll be able to view it soon. Apologies!
There is a separate thread for that - please don't continue here, thanks.I have tried to search the thread to no avail but has there been anymore on the Goring area issue the residents raised?
EDIT: I've just tried to view the film, but I get a message saying that the view has been aborted. I've tried to go on the web site separately, i.e. not via this link, and I get the same result. I don't know when it will be working again, but I hope that you'll be able to view it soon. Apologies!
If there's a continuing problem it should be available on Network Rail's youtube channel directly: https://www.youtube.com/watch?v=pSvMHA93crE
Apologies if I have missed the information but how does the wiring delay affect the move of HSTs to Scotrail?
Can't replace the HSTs without the replacement trains....
The delivery dates for the bi-mode IEPs, shown in the GW direct award franchise agreement, allow for the HST transfer to Scotrail with about a year to spare for modifications.
AFAICS there has never been any reasonable doubt about Scotrail getting their HSTs on time.
I was under the impression that not all the IEPs will be Bi Mode? Unless that'll be enough for the Scotrail cascade?