Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?

None of it is fully wired west of Stockley.
There are a number of partially wired sections, notably between Burnham and Taplow, and between Tilehurst and Didcot.
But there is no completed wiring through any station yet (as of Monday anyway).
The power supply points are incomplete too.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
My question was in the context of the last few posts on this thread. If the 387s are to enter service from May, where will they be maintained?

Fair enough then, my mistake.

I'll suggest their temporary home will be North Pole then, as that is what is showing in the ECS moves on May 16th:

5S06 here arriving Paddington P5:

http://www.realtimetrains.co.uk/train/C44180/2016/05/16/advanced

Continues as an ECS GW 5S06 to Hayes and Harlington,

and then 5S09 arrives in P14:

http://www.realtimetrains.co.uk/train/C46521/2016/05/16/advanced

and forms an outbound GW passenger service to Hayes as 2S09:

http://www.realtimetrains.co.uk/train/C46513/2016/05/16/advanced

Looks like two units each way, each peak, so 8 moves per day at North Pole, here's the 24 hour listing:

http://www.realtimetrains.co.uk/sea...16/05/16/0000-2359?stp=WVS&show=all&order=wtt
 
Last edited:

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Fair enough then, my mistake.

I'll suggest their temporary home will be North Pole then, as that is what is showing in the ECS moves on May 16th:

5S06 here arriving Paddington P5:

http://www.realtimetrains.co.uk/train/C44180/2016/05/16/advanced

Continues as an ECS GW 5S06 to Hayes and Harlington,

and then 5S09 arrives in P14:

http://www.realtimetrains.co.uk/train/C46521/2016/05/16/advanced

and forms an outbound GW passenger service to Hayes as 2S09:

http://www.realtimetrains.co.uk/train/C46513/2016/05/16/advanced

Looks like two units each way, each peak, so 8 moves per day at North Pole, here's the 24 hour listing:

http://www.realtimetrains.co.uk/sea...16/05/16/0000-2359?stp=WVS&show=all&order=wtt
Many thanks, I did a quick trawl of RTT, but must have missed the ECS moves. So North Pole becoming operational is another thing I was unaware was happening in May.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
Fair enough then, my mistake.

I'll suggest their temporary home will be North Pole then, as that is what is showing in the ECS moves on May 16th:

5S06 here arriving Paddington P5:

http://www.realtimetrains.co.uk/train/C44180/2016/05/16/advanced

Continues as an ECS GW 5S06 to Hayes and Harlington,

and then 5S09 arrives in P14:

http://www.realtimetrains.co.uk/train/C46521/2016/05/16/advanced

and forms an outbound GW passenger service to Hayes as 2S09:

http://www.realtimetrains.co.uk/train/C46513/2016/05/16/advanced

Looks like two units each way, each peak, so 8 moves per day at North Pole, here's the 24 hour listing:

http://www.realtimetrains.co.uk/sea...16/05/16/0000-2359?stp=WVS&show=all&order=wtt

That looks like it then! The 387's will be kept at North Pole for the meantime until next year I'm guessing, seems like a sensible decision. It's all ready for them, and the 800's, 801's and 802's.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Presumably the connection and electrification is still intact at North Pole towards the West London Line otherwise the 387s will have to be dragged via the un-electrified South West Sidings.
 

Nippy

Member
Joined
13 Aug 2013
Messages
740
I don't know exactly what the score is with the WLL connections. I had heard the project thought were going to deliver them under their own power via the Poplar Lines from Acton Wells. That was until it was pointed out they were unwired........
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Is there a map of the GWR that shows what sections have had part of the OLE installed and which have had all the OLE installed?

None of it is fully wired west of Stockley.
There are a number of partially wired sections, notably between Burnham and Taplow, and between Tilehurst and Didcot.
But there is no completed wiring through any station yet (as of Monday anyway).
The power supply points are incomplete too.
It would be very good if someone could produce a map, and keep updating it on this thread as the work progresses. Not that I'm volunteering!
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I had heard the project thought were going to deliver them under their own power via the Poplar Lines from Acton Wells. That was until it was pointed out they were unwired........

They were meant to be wired in either 2015/2016 along with the connection between Acton Wells and the WCML at Willesden No.7 Junction for freight diversions during Electric Spine electrification.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
Don't know if this has been said or posted before but here are the confirmed and new completion dates that Network Rail estimate they will finish different sections of the GWML Electrification Project:

Maidenhead to Didcot: December 2017
Didcot to Wootton Bassett Junction: December 2018
Wootton Bassett Junction to Bristol Parkway: December 2018
Reading to Newbury: December 2018
Bristol Parkway to Cardiff: December 2018
Didcot to Oxford: June 2019
Wootton Bassett Junction to Bristol Temple Meads: February 2019-April 2020
Filton Bank: Early CP6
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Don't know if this has been said or posted before but here are the confirmed and new completion dates that Network Rail estimate they will finish different sections of the GWML Electrification Project:

Maidenhead to Didcot: December 2017
Didcot to Wootton Bassett Junction: December 2018
Wootton Bassett Junction to Bristol Parkway: December 2018
Reading to Newbury: December 2018
Bristol Parkway to Cardiff: December 2018
Didcot to Oxford: June 2019
Wootton Bassett Junction to Bristol Temple Meads: February 2019-April 2020
Filton Bank: Early CP6

They're not confirmed dates, they're target dates.

They're a bit on the cautious side, if we get good weather and problems stop appearing, it might be possible to start some services earlier than indicated, similarly, if things go seriously wrong elsewhere, and we get more Goring type nonsense, we'll still be at various sections into CP6.
 

EbbwJunction1

Established Member
Joined
25 Mar 2010
Messages
1,758
Location
Newport, South Wales
Here's a time lapse film of the replacement of half the bridge over the GWML on Cardiff Road, Newport.

http://www.southwalesargus.co.uk/ne...ort_bridge_in_three_minute_video/?ref=mr&lp=4

This is the article that accompanies the film:

"VIDEO footage shows the vast scale of the work on a Newport bridge from the end of last year until February.

A Network Rail time-lapse film shows the part-demolition and reconstruction of the Cardiff Road Bridge. The largest telescopic crane in the UK was used during the works.

Engineers had to raise the bridge for new overhead wires as part of Network Rail’s electrification work on the South Wales Mainline.

Network Rail Wales’ programme manager Andrew Griffiths said: “The film demonstrates the scale of the project and the level of work involved.

We are delighted that we have been able to keep the road open to traffic and pedestrians, minimising disruption. We would like to thank the passengers and the local community for their patience while this essential upgrade work was completed."

He added: “Electrification will provide a bigger, better, more reliable railway for passengers and improve links from South Wales to major towns and cities, including London.”

Single lane traffic management remains in place on the bridge. It will stay there until the work is completed later this spring.

The Cardiff Road project makes up part of Network Rail’s work in Newport, which includes the Maesglas Road bridge and the Bridge Street bridge in the city centre.

A public information event will be held for residents about the electrification work at Maesglas Sports and Social Club on Maesglas Avenue in Newport on Wednesday, March 9 from 3pm until 7pm. No appointments are necessary."

Only half the bridge had to be replaced, as the other half is already high enough for the wires.

EDIT: I've just tried to view the film, but I get a message saying that the view has been aborted. I've tried to go on the web site separately, i.e. not via this link, and I get the same result. I don't know when it will be working again, but I hope that you'll be able to view it soon. Apologies!
 
Last edited:

SPADTrap

Established Member
Joined
15 Oct 2012
Messages
2,355
I have tried to search the thread to no avail but has there been anymore on the Goring area issue the residents raised?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
EDIT: I've just tried to view the film, but I get a message saying that the view has been aborted. I've tried to go on the web site separately, i.e. not via this link, and I get the same result. I don't know when it will be working again, but I hope that you'll be able to view it soon. Apologies!

If there's a continuing problem it should be available on Network Rail's youtube channel directly: https://www.youtube.com/watch?v=pSvMHA93crE
 

steevp

Member
Joined
25 Jul 2012
Messages
247
EDIT: I've just tried to view the film, but I get a message saying that the view has been aborted. I've tried to go on the web site separately, i.e. not via this link, and I get the same result. I don't know when it will be working again, but I hope that you'll be able to view it soon. Apologies!

Worked fine for me this morning from the original URL thanks
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
If there's a continuing problem it should be available on Network Rail's youtube channel directly: https://www.youtube.com/watch?v=pSvMHA93crE

Thanks, I assume from the arched bridge that was demolished, that this was the original South Wales Railway and that was the inadequate bit, whereas one assumes the line was doubled (thus now quadruple) and that the road bridge next to it, that was usable throughout this job thankfully, had been constructed later to make a dual carriageway.

I conclude that the original line, if to Brunel design, was not 'height generous'.
 

Highland37

Established Member
Joined
29 Jun 2012
Messages
1,259
Apologies if I have missed the information but how does the wiring delay affect the move of HSTs to Scotrail?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Can't replace the HSTs without the replacement trains....

The delivery dates for the bi-mode IEPs, shown in the GW direct award franchise agreement, allow for the HST transfer to Scotrail with about a year to spare for modifications.

AFAICS there has never been any reasonable doubt about Scotrail getting their HSTs on time.
 

221129

Established Member
Joined
21 Mar 2011
Messages
6,515
Location
Sunny Scotland
The delivery dates for the bi-mode IEPs, shown in the GW direct award franchise agreement, allow for the HST transfer to Scotrail with about a year to spare for modifications.

AFAICS there has never been any reasonable doubt about Scotrail getting their HSTs on time.

I was under the impression that not all the IEPs will be Bi Mode? Unless that'll be enough for the Scotrail cascade?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I was under the impression that not all the IEPs will be Bi Mode? Unless that'll be enough for the Scotrail cascade?

There are rumours of negotiations to convert some or all of the straight electrics in the order to bi-modes, to address the electrification delays.
 
Status
Not open for further replies.

Top