mister-sparky
Member
Apart from the 2tph to Sevenoaks, are there actually going to be any other SE services (or anyone else) using the Blackfriars bays off-peak?
Apart from the 2tph to Sevenoaks, are there actually going to be any other SE services (or anyone else) using the Blackfriars bays off-peak?
The original plan in the 1990s was four through platforms (two islands). There was also serious consideration to making Blackfriars the OHLE/Third Rail changeover.
Sorry for the slight derail of the convo;
Got a couple of rest days and some quality time with Illustrator. Just put together what Southerns logo could look like if brought in line with the other GTR operations;
What original plan is that then? I've been following this Thameslink project for over ten years and a four platform station has never been a part of it.
There are readily available published plans for reasonably full use of the bay platforms by Southeastern, just because the loop isn't using them doesn't mean they aren't going to be used at all in the final timetable.
They should just save their money and go for:
![]()
I thought they were keeping the current Southern branding and logo? The only change would come to Thameslink and Great Northern with them getting a different branding?
This is what I think the Southern brand is more likely to be like.....
![]()
Ticket gatelines to be introduced at Cricklewood, Flitwick, Mill Hill Broadway and Radlett
First to last station staffing will be introduced at Cricklewood, Elstree & Borehamwood, Flitwick, Harpenden, Leagrave, Mill Hill Broadway, Radlett and West Hampstead Thameslink
BRUG had told them that GOVIA would be installing gates at all FCC stns
This should be interesting as Harlington isn't staffed after 1315, and not at all on Sundays. Fltwick is unstaffed after 1945 Mon-Fri, 1600 Sat, 1600 Sun.
As far as I am aware there are no First and Last trains on the Thameslink route they run all night albeit a limited service. I wonder what will be considered the last train.
There's a last train on Saturday nights (0139 Sunday morning from St Pancras to Flitwick then a 4.5 hour gap; 2352 with a six hour gap in the other direction so Flitwick is without trains for 3 hours 11 minutes).
If it's staffed First to Last train it'll probably get 24-hour staffing rather than a gap in one of the half hours between trains (in both directions).
Can you do one saying Gatwick Express with 'We're Southern really' underneath?
Wonder if they will allow off peak tickets on Gatwick Express services in the future? At the moment it's rather silly. In the evening there are trains running South from Gatwick for which you need a peak ticket but as far as I am aware, they don't publicly state off peak tickets are not valid on these services. So passengers just have to know which services they are allowed to travel on.Gatwick Express is just going to be one of the 4 GTR brands rather than a Southern sub-brand.