traji00
Member
- Joined
- 17 Aug 2009
- Messages
- 243
...that overground liveried 345 looks very nice indeed.
That's actually a Class 710
...that overground liveried 345 looks very nice indeed.
This has probably been asked elsewhere but what is the thinking behind these sets being class 710?. I thought 700s were Siemens stock? Was 346 not an option? They do look good none the less!
But I wonder what the actual seating will be.
Is it possible that the new 4-car electrics will have LESS seats than the 2-car diesels they replace. I do wonder if those who supported the electrification did so thinking "they will get a seat at last", and are going to be sadly disappointed.
Is it possible that the new 4-car electrics will have LESS seats than the 2-car diesels they replace. I do wonder if those who supported the electrification did so thinking "they will get a seat at last", and are going to be sadly disappointed.
AIUI from friends who use it from time to time, overcrowding is so bad in the peaks that it will be a big improvement if pax can board the first train to arrive, rather than having wait until one arrives that they can squeeze onto. I think that seats are largely irrelevant once trains have left their first station.
Correct. Trains leave Gospel Oak in the PM peak full and standing and it just gets worse as trains head east although people do alight. Blackhorse Rd is the key pinchpoint because of transfer from the tube. The crush is horrendous.
I have not experienced the AM peak out of Barking but I understand that is also appalling. Regular users will be delighted when the electric trains run for the reason you cite - just being able to get on board!! Of course, if the extra capacity unleashes another surge of pent up demand we may be back to square one fairly quickly! That will be the thing that TfL will be watching for as they will have to take decisions on ordering extra trains *if* Mr Grayling signs off the Barking Riverside extension TWA order. There is scope to order more trains not only for the extension but also a higher frequency service.
Regarding a higher frequency service, would this increase from the present every 15 minutes to something like every 10 minutes/doubled to every 7-8 minutes, or has it not yet been decided?
The East Ham men will be out in prep of points/track renewal at the east end exit later this year. There is something floating around that LO 710 maintenance will be centered on WN, with it becoming a near dedicated facility to the 710sWhere will the units be berthed?
Just asking as I've noticed that the little triangle at the east end of East Ham depot has been defoliated and there have been a few orangle-clad people wandering around looking at things. You could certainly stick a couple of sidings in there for a 4 car unit. Five might not fit.
With c2c getting 17 more units in the coming years, ad hoc parking of TFL trains in East Ham might not be possible.
The East Ham men will be out in prep of points/track renewal at the east end exit later this year. There is something floating around that LO 710 maintenance will be centered on WN, with it becoming a near dedicated facility to the 710s
There are also options in the 710 order to make some or all trains up to 5 car - are there any unsurmountable obstacles to slightly longer trains on the GOBLIN?
There are also options in the 710 order to make some or all trains up to 5 car - are there any unsurmountable obstacles to slightly longer trains on the GOBLIN?
I'd have thought anything longer would require a rebuild of the bay at Gospel Oak, which surely wouldn't come cheap given the constraints.
I'd have thought anything longer would require a rebuild of the bay at Gospel Oak, which surely wouldn't come cheap given the constraints.
Is the signal at Gospel Oak at the end of the platform or a little past the platform?
The starter looks to be just before the end, i.e. a couple of metres within the platform usable length.
Not much progress at all then since my notes over 3 months ago (No 333 above). At least it sounds like the masts which wereit is not good news as regards electrification progress ... There is very little catenary and contact wire installed, the only wiring up is two small sections, one is just past Gospel Oak Junction and another is from the Barking flyover into the bay platform at the eastern terminus of the line ... There is little scope at present for any wiring to begin, except for the return wire, because the support arms are not continuous in nearly all locations.
Also the NW.I don't know where this style of oddball installation of support arms and other elements up and down the line comes from, it's almost like the engineer in charge put the mast references into a random number generator. The GWR electrification is the same.
Not much progress at all then since my notes over 3 months ago (No 333 above). At least it sounds like the masts which were
thrown down in the lineside weeds then have been picked up and bolted in. The wiring described is what was done in the blockade, so there's been nothing since.
I don't know where this style of oddball installation of support arms and other elements up and down the line comes from, it's almost like the engineer in charge put the mast references into a random number generator. The GWR electrification is the same. Possibly it's dependent on individual manufacture and delivery of components, in which case it makes a nonsense of all the hoopla about doing it with standardised parts.
Putting the wires up is by no means the end, that is where the complex part starts, connecting up to the substations and commissioning it all. At the present pace I will be surprised if electric services start before 2019. Can we do a GWR and put diesel engines under the floor of the new 710s?