A slight caveat on the miracle thing: if Covid hadn't struck so many more of these deficiencies would have been apparent by now. I've got to say, though, that GCB appears to be running as an operator of two halves, again mostly based on what I read on here. The smaller West Cornwall operation doesn't seem bedevilled with the problems occurring further east, and I've seen no examples of cancellations or excessively early/late runnings down here, even on journeys which might be expected to have few, if any, passengers.
Very true. The Covid reduction in services was indeed fortuitous for both Go Ahead and Cornwall Council in minimising the impact of the start up. At the risk of repeating myself, I don't think it was ever in doubt that PCB would be able to obtain enough compliant vehicles from across the group, even if it meant some quite mature vehicles going into Plymouth to release newer ones. The risk was always about being able to recruit enough drivers especially when it was clear that FK were looking to retain all their workforce. That is two fold - getting enough full stop and then enough of sufficient quality and commitment not to a) have pride in their job as a professional driver, b) have the sense to question things like fuelling to ensure buses and c) have the required technical skills to handle large vehicles on narrow Cornish roads. That was always going to be more pronounced in mid Cornwall. All of that is what we are seeing.
Without doubt, there are areas where PCB will be getting it wrong and have made mistakes. You can see that with the awful Green Flash, the bodge jobs on damage on new vehicles, etc.
However, the fact was that the council made their choice with a timescale best described as challenging. Parallels have been drawn with Arriva in Malta but for me, the greatest parallel was the exercise that Dorset did. Let's do the checklist...
- The awarding of a county wide package to one operator
- Operator had to source a raft of vehicles
- Operator had to open new operating centres dotted across the place to service these tender wins
- Incumbent firms registering lost services commercially
- Very tight timescale - DCC announced in early June for commencement in September
- Vehicles turning up late or not at all
One might have thought that Go Ahead would have learnt from that experience, and also Cornwall Council may have observed what the issues were. I'm sure the then GSC Director (Alex Carter) was probably chuckling when he saw what CC were looking to achieve.