psychopompos
Member
- Joined
- 27 Nov 2018
- Messages
- 5
Would the introduction of the 717s bring 3-car services to an end? There should be enough 717 + 313 6-car units now?
Any idea about services on the Hertford loop? Welwyn already gets the 700s![]()
Indeed and as GTR have stated as far as they're aware the information to which services will go over to Class 717 operation has not yet been made clear to them so until there's more concrete evidence of what services will go over to Class 717 operation, it's just guesswork at this time.
As to stopping at stations between Finsbury Park and Welwyn Garden City/Stevenage via Hertford North, as they're 6 car fixed formation trains - are they stopping at the 6 car Class 313 markers or have they had to adjust the stopping positions?
Thanks for sharing,is it known when they start to replace Letchworth-moorgate services?
Amazing, thanks!From Hertford North (subject to usual disclaimer...)
2J01 0433
2F01 0607
2J17 0642
2J21 0702
2F04 0709
2J27 0732
2J30 0744
2J33 0802
2F14 0809
2F19 0829
2J42 0844
2J47 0917
2J57 1030
2J65 1130
2F52 1135
2J69 1200
2J71 1217
2F64 1305
2F68 1335
2J83 1347
2J87 1417
2J89 1430
2J09 1530
2J15 1600
2F02 1631
2J27 1706
2F08 1711
2J35 1743
2J38 1803
2F32 1911
2F37 1941
2J53 1947
2J57 2017
2J59 2030
2J63 2100
2J71 2200
2J73 2216
2F76 0012
There's no such thing as a Letchworth-Moorgate service anymore. Since last May the inner suburban services run no further north than Stevenage. There are still a handful of early morning and late night workings to/from Letchworth sidings, and a few which have been regularly stabling in Hitchin up yard vice elsewhere, however these all run ECS north of Stevenage.
Oh didn’t knkw thatThere's no such thing as a Letchworth-Moorgate service anymore. Since last May the inner suburban services run no further north than Stevenage. There are still a handful of early morning and late night workings to/from Letchworth sidings, and a few which have been regularly stabling in Hitchin up yard vice elsewhere, however these all run ECS north of Stevenage.
To be honest terminating them at Stevenage is probably the one thing that GTR have got right as they already had 4 services a hour between Stevenage and Letchworth - Least when they as in Network Rail complete Platform 5 at Stevenage in Year Dot, they might look at running half hourly north of Hertford off peak.
Two tph off-peak is the plan.
That's good as that's been a long time waiting,least it means a massive improvement in connectivity between Stevenage and Hertford Loop stations - that ought to be the absolute minimum service provided.
I've not seen comments but compared to the Class 313, what are their dwell times like ie braking for station stops to doors open/close and departing from stations?
The moorgate is crying out to be added to Overground
The moorgate is crying out to be added to Overground
The moorgate is crying out to be added to Overground
OT but What's hitchin going to sign?a GN only depot?The people who can't get their 710s out on schedule??
Not all of Hornsey are trained on these yet, these will be a problem for me on the 10th........
According to documents I've seen, it will be 387 and 717 so there will be GN work for them and will sign routewise up to Biggleswade (why?) and Cambridge.OT but What's hitchin going to sign?a GN only depot?
Not many GN only trains will stop there?
Not all of Hornsey are trained on these yet, these will be a problem for me on the 10th........
At least the 313s are still around and capable, so if you get assigned to a nominally 717 diagram you'll just take out an old girl from the depot until you get your training? Not like Thameslink (hopefully) where it was 700 or bust, and was more often than not bust in the early days.
1) If you're starting your job at, say, Finsbury Park, and you can only drive 313s but have been booked a 717 job the train will be terminated and that driver will be left without a job.
if they are like the 700's then:That's good as that's been a long time waiting,least it means a massive improvement in connectivity between Stevenage and Hertford Loop stations - that ought to be the absolute minimum service provided.
I've not seen comments but compared to the Class 313, what are their dwell times like ie braking for station stops to doors open/close and departing from stations?
I am sure they won't all be 717s from day one, but with the 313s off lease from this week or last, there's definitely a need to switch ASAP. Especially now almost all the 717s have been delivered and need a place to stay...
if they are like the 700's then:
1)braking- quite good until pulling into stations, then bloody slow
2)open doors takes quite a while
3)quick off the blocks when departing
I am sure they won't all be 717s from day one, but with the 313s off lease from this week or last, there's definitely a need to switch ASAP. Especially now almost all the 717s have been delivered and need a place to stay...
It's not like there's anyone queueing up to take the 313s away - I'm sure the leaseco will be happy to squeeze a bit more revenue out of them before they head off for recycling. Storage space is the primary issue.
At least once the doors are open, passenger boarding times should be much less as the door area will no longer be a huge bottleneck.
The 313's are due to be off lease from 31/12/18, that obviously won't happen although another date I heard was by 28/02/19. Which gives enough time for remaining drivers to have the initial 700 course plus the 2 day 717 conversion, As i've yet to hear or see any driver undergo the full 2 week 717 course, if it even exists at this moment in time.
But I bet the ROSCO will be happy to charge a small fortune for every extra minute!
That's good as that's been a long time waiting,least it means a massive improvement in connectivity between Stevenage and Hertford Loop stations - that ought to be the absolute minimum service provided.
I've not seen comments but compared to the Class 313, what are their dwell times like ie braking for station stops to doors open/close and departing from stations?