It seems like an obvious and relatively cheap way to improve integration between rail and subway for Ayrshire/Inverclyde passengers yet it's only ever mentioned in the context of Crossrail. What factors do people think are stopping it happening as a stand alone project?
My personal take on it is that an interchange is necessary for Crossrail (as you would be diverting existing Inverclyde/ Ayrshire services away from central Glasgow, so need some connection for inconvenienced passengers), beauty wouldn't need one for other reasons.
A Crossrail station there seems a way of acknowledging the major weakness with Crossrail (that it doesn't serve central Glasgow), so connecting people to the Subway which does - rather than any major market around West Street.
Major housing and industrial development is planned for the surrounding area which has no transport options apart from the Subway
It's surely only a couple of minutes walk to/from Ellington Street, not that far from the city centre (and the Subway penetrates the city centre than a train terminating at Central).
It's not perfectly served, but there are much more deserving areas in Scotland to have a heavy rail link.
Glasgow is short of terminal capacity and councillors want to run trams, which are designed to run on street, into our busiest terminal station. It's daft.
The best argument against Rail to Renfrew is that NR are at the point of needing serious investment to add capacity into Central
1. Another thread saw people complaining that the Patrick bottleneck means that services through Queen Street Low Level (and also Central Low Level) aren't making the most of line capacity (since the flat junctions plus the two platforms at Patrick restrict the number of services at the Low Level stations).
2. Recent developments on the south bank of the Clyde mean that there are "destinations" built with no rail access (the new hospital with the name that everyone wants to argue about, Braehead).
3. Renfrew is a big place to have no rail services (albeit not as "romantic" as the case for heavy rail to some rural place, so doesn't have the backing it ought to)
4. Funding has never been found for an Airport station (partly because it'd mean paths through Cardonald used for an Airport service can't be used for Ayrshire/ Inverclyde)
5. There's no spare capacity at the High Level platforms for Queen Street/ Central - so if we want to provide additional services then we need something clever.
6. London Crossrail is good because it provides a link through the centre of the city. Glasgow Crossrail feels like a solution in need of a problem because it takes trains away from the city centre - if you want to provide heavy rail then you need to be giving people a link into the centre of Glasgow (rather than dumping them elsewhere).
...it's almost enough to get my packet of Crayola out and draw a heavy rail route that roughly follows the First 77 bus route (direct services from Paisley - Airport - Renfrew - Braehead - QEII - Govan/Partick - Exhibition Centre - Charing Cross - Queen Street - beyond