• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Glasgow Subway New Driverless Trains

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,145
So is the plan for the Glasgow Subway to run full proper staffless automation with nobody onboard? So just like on the Birmingham / Gatwick / Heathrow / Luton / Stansted terminal shuttle things and the Copenhagen Metro and some Paris Metro lines? If so then that will be the first fully automated train in the UK that is not an airport shuttle. I suppose it saves them a lot of money but i also wonder where the drivers will go as i doubt they have any alternative jobs on such a small system.
Perhaps they will retrain in maintenance, or as platform/control room staff. There are plans for the system to significantly expand as part of the Clyde Metro system, so more opportunities may be available there when/if that opens.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
Thr
So is the plan for the Glasgow Subway to run full proper staffless automation with nobody onboard? So just like on the Birmingham / Gatwick / Heathrow / Luton / Stansted terminal shuttle things and the Copenhagen Metro and some Paris Metro lines? If so then that will be the first fully automated train in the UK that is not an airport shuttle. I suppose it saves them a lot of money but i also wonder where the drivers will go as i doubt they have any alternative jobs on such a small system.
Is the DLR (Docklands Light Railway) fully automated? (With some minor exceptions?)
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,919
Location
Exeter
So is the plan for the Glasgow Subway to run full proper staffless automation with nobody onboard? So just like on the Birmingham / Gatwick / Heathrow / Luton / Stansted terminal shuttle things and the Copenhagen Metro and some Paris Metro lines? If so then that will be the first fully automated train in the UK that is not an airport shuttle. I suppose it saves them a lot of money but i also wonder where the drivers will go as i doubt they have any alternative jobs on such a small system.
Sydney Metro is driverless too although there are customer service attendants who work inside the trains and on platforms.
 

Skymonster

Established Member
Joined
7 Feb 2012
Messages
2,060
As mentioned in the article, the platform screens and doors associated with automated running are coming. Work is underway at Govan my (photos from yesterday) and will undoubtedly progress around the entire circle. The doors are not yet working - presumably that will come as testing progresses.

I think that the Glasgow Subway has quite an intimate feel to it, especially the stations that have narrow central platforms when both are lines occupied (some might argue it is almost claustrophobic when its busy - especially in contrast to, say, the London Underground). These installations will undoubtedly alter the essence of the system for those who have an interest beyond just using it as a form of transport. The new trains have already given the Subway a different character (it can hardly be called the Clockwork Orange anymore given the vehicles are now predominantly white, even though the SPT logo is still orange), and the screens and doors are the harbinger of another shift. Anyone who hasn’t but wants to experience the Subway as it is - rather than how it will be - might be best advised to visit this year.F7F5C297-6EC9-4A36-BC71-FFB62E6BA16F.jpegB0E1680E-1F54-4524-A6DA-99B265D851DA.jpeg
 

318266

Member
Joined
30 Sep 2017
Messages
872
Location
S&W of Alexander Dennis, N&E of Wrightbus
In the latest publicly available report to the Strathclyde Transport Partnership, updates on the Subway Modernisation Programme were included. The document is quite lengthy, so I will quote highlights. The entire document is available here for those wishing to indulge.

SPT said:
3.7 CP4+ ‘go-live’

On completion of (a) fault free running for the first three trains; (b) the trial operations programme and all other readiness activities; and (c) all required safety verification and assurance, the system will then be ready to be accepted by SPT for passenger operations.
To achieve the switchover to the new signalling system and new control room is a significant undertaking.

...

Subject to ANSTA’s successful completion of FFR and submission of all safety verification and assurance documentation, it is expected that this closure will be on Sunday 30 August 2026

Once switched over, this will mark achievement of Configuration Point 4+ (CP4+) and from Monday 31 August, the Subway system will be operating on the new signalling and telecommunication systems from the control room in the new Operational Control Centre.

3.8

Future Customer Experience

...

Platform Screen Doors installed at stations will come into passenger use once CP4+ goes live with up to six of these PSDs providing enhanced levels of passenger safety on our
system.

Following the PSDs at the first stations going into operation, the subsequent PSDs in remaining stations will be commissioned and brought into use immediately following their installation at each station.

The new passenger information system will be introduced and this will consist of automatic audio and visual announcements on the trains as well as at platforms and station concourses and visual information at station entrances. The system will provide consistent and reliable information about the service, including next train times, service changes as well as key safety and emergency messages.

Passenger Help Points in stations and on trains will also come into use when the new system goes live.

These will provide the facility for passengers to contact staff with any general queries or support in case of an emergency.

...

3.13 Programme review
The programme continues to be reviewed and updated. The current delivery estimates are noted below:
...
CPX: Introduction of new fleet to passenger service on legacy signalling system - June 2024 (achieved)
CP4+: New signalling system and Operational Control Centre ready for operation - 30 August 2026
CP5: Platform Screen Doors installed and operational at all stations - Q4 2026
CP6: Ready for Unattended Train Operation - Q1 2027

In essence, the introduction of CBTC (computer-based train control) signalling, along with the new passenger information systems, and the platform screen doors that have been installed to date, will enter revenue service along with the 3 presently withheld members of the new Stadler rolling stock on the 31st of August if all goes as planned. It'll certainly feel quite different to how it is now, and I imagine a few of us will be having our pens out on the 31st to get those last few stragglers!
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
Last Saturday (25th) I rode a new train from Partick to Buchanan Street. I went the scenic route via Govan, under the Clyde.

Anyway, I didn't find the ride very comfortable. Although the train was modern, it seems the track had not been refurbished/replaced for a long time, as the ride was bumpy. I had planned to stay on to Hillhead but lost interest in such a long ride.

My Tyne & Wear 555 ride on Monday was much more comfortable, as were my Sheffield tram rides on Wednesday.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
Last Saturday (25th) I rode a new train from Partick to Buchanan Street. I went the scenic route via Govan, under the Clyde.

Anyway, I didn't find the ride very comfortable. Although the train was modern, it seems the track had not been refurbished/replaced for a long time, as the ride was bumpy. I had planned to stay on to Hillhead but lost interest in such a long ride.

My Tyne & Wear 555 ride on Monday was much more comfortable, as were my Sheffield tram rides on Wednesday.
Last time I was on a new unit the ride was a bit bumpy too. Think they can alter the suspension by plugging them into a PC. Which may solve the problem Sure the track was part of the process of renewal. Maybe just the suspension needing a bit of upgrade
 

ld0595

Member
Joined
1 Aug 2014
Messages
669
Location
Glasgow
It's definitely not as bad as it used to be when the new stock was introduced, with it violently shaking side to side
 

AilsaBus

Member
Joined
7 May 2023
Messages
101
Location
Scotland
The new trains are awful, the doors take ages to open and they don't accelerate as quickly or as smoothly as the old stock. I wouldn't be surprised if a round trip now takes longer due to the slowness of the new trains.
 

EMU303

Member
Joined
24 Aug 2016
Messages
295
The new trains are awful, the doors take ages to open and they don't accelerate as quickly or as smoothly as the old stock. I wouldn't be surprised if a round trip now takes longer due to the slowness of the new trains.
This was the case when the trains were first introduced. Today, the doors open approximately 4 seconds after the train comes to a halt, with an audible warning in between. Can’t see how it can be any faster?
 

AilsaBus

Member
Joined
7 May 2023
Messages
101
Location
Scotland
This was the case when the trains were first introduced. Today, the doors open approximately 4 seconds after the train comes to a halt, with an audible warning in between. Can’t see how it can be any faster?

The doors on the old stock used to open pretty much as soon as the train stopped and the train started to pull away the instant they closed. The jerky acceleration won't be helping travel times either.
 

D1537

Established Member
Joined
11 Jul 2019
Messages
2,027
Location
North Yorkshire
In essence, the introduction of CBTC (computer-based train control) signalling, along with the new passenger information systems, and the platform screen doors that have been installed to date, will enter revenue service along with the 3 presently withheld members of the new Stadler rolling stock on the 31st of August if all goes as planned. It'll certainly feel quite different to how it is now, and I imagine a few of us will be having our pens out on the 31st to get those last few stragglers!
I rode on 315 last Tuesday and saw 313 working as well, so it would appear that the withheld ones are in service now.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,828
Location
Nowhere Heath
I rode on 315 last Tuesday and saw 313 working as well, so it would appear that the withheld ones are in service now.

Indeed they are, my last two were 313 and 314, I got them both almost 2 weeks ago. I celebrated my last one, 313, with a full loop around the Inner Circle on it.

No more light rail or heavy rail trains on my wants list in Scotland now, except for heritage railways :D
 

Top