Apparently there's been some points failure at Glasgow Central, and Open Train Times shows GLC (high level) at a standstill! The 1834 from Central to Ayr seems to have been the last train to have arrived/departed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
Arrived at Glasgow Central tonight to find nothing moving.

Complete lack of any communication whatsoever apart from a poorly enunciated garbled message every so often of which the only part I could make out was "signalling problems at Shields Road".

Gave up and went to Buchanan Bus station and got the bus to Kilmarnock.

At least as far as communication and customer service is concerned what a low quality organisation Abellio Scotrail is.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
It's certainly all on their Twitter. The heat has. B******d all the points.
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
So why was this not communicated to the assembled crowds of punters in Central Station?
 

68000

Member
Joined
27 Jan 2008
Messages
832
Arrived at Glasgow Central tonight to find nothing moving.

Complete lack of any communication whatsoever apart from a poorly enunciated garbled message every so often of which the only part I could make out was "signalling problems at Shields Road".

Gave up and went to Buchanan Bus station and got the bus to Kilmarnock.

At least as far as communication and customer service is concerned what a low quality organisation Abellio Scotrail is.

1. Glasgow Central is a Network Rail managed station
2. Points/Signalling/Pway issues are Network Rail issues. Did you check the ScotRail twitter feed?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,629
Location
Nottingham
It was on National Rail when I looked about 20min ago. Though I struggle to understand how there can be a service between Glasgow and Gorouck or Ayr when there's none between Glasgow and Gilmour Street.
 
Joined
17 Jul 2017
Messages
61
Yes, and hopefully @kylemore managed to get the correct information.

No offence, but “check Twitter” isn’t an answer.
Twitter should be used *in addition* to normal channels like announcements and info screens, not *instead* of.
 

sdrennan

Member
Joined
23 Feb 2011
Messages
211
On a delayed train from Euston. Just been advised I have the joy of onward transport from Motherwell :(

I was on the sleeper down last night which was perfect and nice and early. I suspect it may be a little late tomorrow
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
Please note I am making no comment on the technical issue or the technical response to it.

I am only commenting on the quality of customer communication.

I was at the station for around 40 mins in the company of several hundred others and there was no attempt to seriously communicate with me or them.

I worked it out for myself due to my savvy that there was no point in waiting and made my own way to the bus station where the driver had no knowledge of ticket acceptance arrangements. I will be obtaining a form to make a claim.

I have a mobile which I use for calls and texts - I don't do twitter/facebook - not interested.

I was in a major station for goodness sake, with numerous staff, a functioning Information screen and PA system and presumably "Managers" on the premises - yet no communication.
 

haggishunter

Member
Joined
25 Aug 2016
Messages
349
Please note I am making no comment on the technical issue or the technical response to it.

I have a mobile which I use for calls and texts - I don't do twitter/facebook - not interested.

Facebook is almost an irrelevance in this sort of situation, but you don't really need to 'do' Twitter to make use of the information put on it. Twitter is pretty much an ideal way of getting basic critical info out in a fast changing situation, unlike individual businesses websites which even with big resources and scaling can be overwhelmed when there are major problems.

If you choose not to use the information channels the train operator provides, then don't complain about the lack of information.
 

68000

Member
Joined
27 Jan 2008
Messages
832
Yes, and hopefully @kylemore managed to get the correct information.

No offence, but “check Twitter” isn’t an answer.
Twitter should be used *in addition* to normal channels like announcements and info screens, not *instead* of.

In the absence of the should, smart passengers will use all sources
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
If you choose not to use the information channels the train operator provides, then don't complain about the lack of information.

Oh but I am - at the risk of repeating myself I am in a major station, indeed THE major station in Glasgow, no doubt mere yards away from highly paid supervisors and duty managers behind closed doors, functioning screens and PA and yet no communication.

That is incompetence.
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
Facebook is almost an irrelevance in this sort of situation, but you don't really need to 'do' Twitter to make use of the information put on it. Twitter is pretty much an ideal way of getting basic critical info out in a fast changing situation, unlike individual businesses websites which even with big resources and scaling can be overwhelmed when there are major problems.

If you choose not to use the information channels the train operator provides, then don't complain about the lack of information.
I don't think it's remotely unreasonable to expect some form of decent communication from staff in one of the country's largest stations during major disruption. If the social media team are able to disseminate the information then why can't information boards, PA systems and human beings? All the information should be coming from the same sources.

Twitter is good but it's not the be all and end all.
 

Far north 37

Established Member
Joined
13 Apr 2011
Messages
1,951
Facebook is almost an irrelevance in this sort of situation, but you don't really need to 'do' Twitter to make use of the information put on it. Twitter is pretty much an ideal way of getting basic critical info out in a fast changing situation, unlike individual businesses websites which even with big resources and scaling can be overwhelmed when there are major problems.

If you choose not to use the information channels the train operator provides, then don't complain about the lack of information.
Surely you cant be serious that people in a major station should be looking on social media to find out whats happening instead of actually being informed at the actual source of the problem.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
Signalling failure, not points failure, apparently.
There were two seperate issues - firstly multiple points failures at Shields Junction mid afternoon which led to Ayrshire and Paisley Canal services being curtailed. Just as this was overcome it was very shortly followed by the loss of detection and control of just about every set of points between Bridge St Jn/Eglinton St Jn and the buffers at Central. This has been an exceptionally challenging incident to manage for Control, the Signalling Centre and, no doubt, the station staff.
 
Last edited:

Mingulay

Member
Joined
5 Mar 2018
Messages
463
I don't think it's remotely unreasonable to expect some form of decent communication from staff in one of the country's largest stations during major disruption. If the social media team are able to disseminate the information then why can't information boards, PA systems and human beings? All the information should be coming from the same sources.

Twitter is good but it's not the be all and end all.


Of course you should expect verbal on site face to face communication to be the prinicipal and preferred means of customer info. Social media is lazy and just second rate. It shows they still don't get it on Rail and Aiports. Complete management failure to communicate. They think social media means they can avoid personal interaction. Lazy stuff. Sloppy approach . Get on the platforms deploy staff. Talk to people show you care. Basic stuff frankly. If only the general public would push back against smart phone use and demand better.
 

Mingulay

Member
Joined
5 Mar 2018
Messages
463
There were two seperate issues - firstly multiple points failures at Shields Junction mid afternoon which led to Ayrshire and Paisley Canal services being curtailed. Just as this was overcome it was very shortly followed by the loss of detection and control of just about every set of points between Bridge St Jn/Eglinton St Jn and the buffers at Central. This has been an exceptionally challenging incident to manage for Control, the Signalling Centre and, no doubt, the station staff.


Still does not excuse communication failure. In this day and age we have mobile phones and radios and so staff need to get on the platforms.

Also it remains bewildering to the general fare paying public that any weather event beyond your average dreich to mediocre Scottish weather that Network rail infrastructure can't cope with a hot day that is just your average summers day in mainland Europe. Can't cope with heavy rain which we get lots of . Frosts and light snow is another reason for infrastructure failure. We live in a mild climate not extreme by any means Where are network rail going wrong ?
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
I didn’t say the problem at Central is weather related, you seem to have reached that conclusion on your own.
 