Clansman
Established Member
I agree it is a better Bus but the Edinburgh one opens up more gateways than the Glasgow one![]()
Nice pun
I agree it is a better Bus but the Edinburgh one opens up more gateways than the Glasgow one![]()
Slightly off topic, but I wonder if the Deanside Branch, the rail line to car-dominated Braehead, could figure in these or alternative plans? A rail station there, terminus or a continuation, would be a great asset.
Slightly off topic, but I wonder if the Deanside Branch, the rail line to car-dominated Braehead, could figure in these or alternative plans? A rail station there, terminus or a continuation, would be a great asset.
Also there is only a budget of £100m so nowhere near enough money to cover anything beyond a very short spur line.
This is ture. Additionally, if the rolling stock has to be BR standards of crash worthiness for mainline running how can they afford to buy all new bespoke stock in that budget too?
Nobody has yet mentioned Glasgow Crossrail, which continually gets delayed but which would be a hell of a lot simpler than London Crossrail, and if this was done it would make GARL a lot more useful, no?
All it needs is electrification of the line through Gorbals, a few stations reopened and construction of a short chord to allow trains on this route to reach Queen St low level; no new tunnel boring through densely built-up land...
If a rail-Subway interchange could be built at West St this becomes an even better idea.
Also there is only a budget of £100m so nowhere near enough money to cover anything beyond a very short spur line.
From what I understand what they are proposing is a tram link from the airport to Gilmour St where passengers would have to change to services to Glasgow Central.
Basically if you boarded a bus at the same time you could be in the City Centre while the tram passenger is still standing on the draughty Gilmour St platform waiting for a train. Daft.
Most passengers would still use the express bus (mirroring the embarrassing situation at Edinburgh Airport) unless you could persuade the Airport Authority to ban them from the premises!
And anyway £100m seems a bit of an underestimate for even that - in other words a World Class Fiasco (up to Edinburgh Tram standards) in the making!![]()
Nobody has yet mentioned Glasgow Crossrail, which continually gets delayed but which would be a hell of a lot simpler than London Crossrail, and if this was done it would make GARL a lot more useful, no?
All it needs is electrification of the line through Gorbals, a few stations reopened and construction of a short chord to allow trains on this route to reach Queen St low level; no new tunnel boring through densely built-up land...
If a rail-Subway interchange could be built at West St this becomes an even better idea.
Agreed. Though it is worth reading the surface access report from AECOM that compares the options:
http://www.glasgowairport.com/media/37884/ga-exec-summary_final.pdf
This highlights the need to assess capacity on the existing rail network which has not yet been done:
This does include the option of running as a shuttle service from Paisley Gilmour Street should capacity not be available. Given that no work has been done to cost the infrastructure required on Paisley - Glasgow corridor and at Glasgow Central it is reasonable to suggest that a tram shuttle service is still a possibility until the cost of the capacity is taken into account.
I'm a bit puzzled, as the only bit of the GARL project that was actually done was to increase capacity between Paisley and Glasgow. Has that capacity subsequently been completely used up by other service enhancements?
As I've stated hundreds of times before the bus is perfectly adequate. It runs through the city centre depositing passengers at hotels, shopping areas, Central and Queen St stations.
No, they're proposing that the tram-trains will run all the way to Glasgow Central. Basically, the reason for tram-trains is that they make it far cheaper to build the spur from the heavy rail line to the Airport. Otherwise, the scheme is pretty much the same as the original GARL, including all of its flaws.
I'm a bit puzzled, as the only bit of the GARL project that was actually done was to increase capacity between Paisley and Glasgow. Has that capacity subsequently been completely used up by other service enhancements?
It has. There are now 3 lines between shields and arkleston and 4 between arkleston and paisley. Capacity has increased to 4tph between Glasgow and Ayr. The extra Ayr services are express between glasgow and Kilwinning, both ways.
My guess at that point is that PRT makes a comeback. But before then we will have 2 years of arguing while Labour and SNP try to blame each other for it not happening.
I would be amazed if the SNP blamed anyone else for GARL not happening but I wouldn't put it past them.
One of the other issues with the original GARL proposal was that the platforms were only going to be 4x23m long. That's fine for a dedicated shuttle service but it would make it pretty difficult to integrate it into any other electrified services, either with a reversal at Central or with a future cross-city link. Such extended services would have been one of the few things that could have made the branch significantly busier, as access to the airport from the east of the city currently isn't very good.
If the cross city tunnel was built perhaps a cheaper heavy rail version of GARL could be built (call it GARL 3). We know that an airport-Central shuttle would have to stop at PGS in order to have any semblance of a business case. We also know that route requires a very expensive viaduct approaching the terminal from the west and relocation of the fuel farm. However, if you could run direct services from the airport terminal to Edinburgh, Cumbernauld, Stirling and even Dundee without bypassing Glasgow City Centre, then, as you say, the airport branch line for GARL 3 would carry more passengers than versions 1 and 2, possibly removing the need to stop at PGS. If a stop at PGS was no longer essential then the branch line could approach the terminal from the east. TS has confirmed that a viable route exists from Arkleston right up to the south east corner of Terminal 2 utilising the solum of the old Renfrew Branch. Trains would run non stop from the Airport to the City Centre in around 13 minutes.
The only downside of GARL 3 I can think of is there would be no interchange for Ayrshire/Inverclyde services, but I don't think this would be a deal breaker as only 10% of airport users are to/from locations accessed by the routes through Gilmour Street.
I remain to be convinced that Paisley is the way to go with the rail link to Glasgow Airport. 4tph on the Glasgow-Paisley stretch (in addition to four trains an hour in Central) is a significant drain on capacity that I would argue could be better used on Ayrshire and Inverclyde services. I think the services will be lightly loaded by comparison to the busy trains running down that route to other destinations.
Scotland's Transport Secretary Humza Yousaf said he would be working with Renfrewshire and Glasgow City Councils and the airport on the plans.
That's the important bit in here. The current draft business case for tram train does not identify any spare capacity on the Paisley - Glasgow rail corridor, any spare capacity for Tram Trains at Glasgow Central station or any alternatives such as street running in Glasgow. The BCR for tram train does not include any costs for providing capacity on Paisley corridor, Glasgow Central or Glasgow street running and is based purely on the cost of providing the new track from Paisley to the airport and hoping capacity elsewhere appears magically from thin air.
Once a full business case looks at these costs the BCR will plummet and the PRT solution will be adopted instead. In the short term however it is a political football with the council elections coming up in May 2017 so no one is willing to point out the current BCR is utterly fictional.
Given the cost, the whole idea is a waste of money as the bus links at present are adequate, and with a fraction of the cost could surely be improved rather than another "vanity project".
They could fudge it. This report states that a rail timetable study has identified a potential service level involving four tram trains per hour in the off peak and two or three in the AM and PM peaks. Timetable compliant train paths and platforms are available without having to build new capacity. BCR ranges between 2.5:1 and 3.2:1. Supposedly it would be an 'interim' service level:
https://www.glasgow.gov.uk/councillorsandcommittees/viewSelectedDocument.asp?c=P62AFQDNDN0GT1Z381
This is one of the reasons why public infrastructure in the UK is in such a terrible state.
"Adequate" is only fractionally off the bottom of the scale. "Adequate" is what the bus services were that replaced rail services in the Beeching cuts.
"Adequate" is simply not good enough.
It cannot be vain to aspire to having high quality rail transit to an international airport.
I don't use Glasgow Airport because it is quite simply awful to get to from Stirling.
How hard can it be to have a rail link between Clydebank and Paisley with an Airport station inbetween?
Then, with a new flying junction at Ashfield/Springburn and the re-opening of a low-level platform at Queen Street, you could have a dedicated "Airport" platform at Queen Street with services operating on wide one-way loop to limit conflicting movements at that end.
It's effectively Cross-rail.
...
I don't use Glasgow Airport because it is quite simply awful to get to from Stirling.
How hard can it be to have a rail link between Clydebank and Paisley with an Airport station inbetween?
Well it's not going to be cheap. Stirling would be better off if they spent the money doing the Dalmeny chord so you can get into Edinburgh Gateway.