Nightrider
Member
- Joined
- 21 Aug 2010
- Messages
- 227
Two words for you.
Crossrail. Glasgow.
This would've improved rail transport in Glasgow as a whole. It would've been nice, but I've not heard anything on the matter since January.
Maybe one day.
Two words for you.
Crossrail. Glasgow.
This would've improved rail transport in Glasgow as a whole. It would've been nice, but I've not heard anything on the matter since January.
There was something in the news about it recently, apparently. No idea what, though.
Is it true that Glasgow Central absorbed almost all its services after its closure?
Yes it did. But I have to wonder how much more can Central take as surely they can't keep building new platforms whenever the need arises for more. Eventually, a new station might be in order.
I'm also struggling to come up with a site of a new terminal. To re-open St Enoch, surely they'd have to get rid of that disastrous shopping centre that stole the station's name!
Come to think of it, since privatization, has there been a new big terminus built anywhere in Britain?
There are loads of places to build another station, the issue would be the cost of purchasing land and propertyI'd go with that, a heap of s***e is st enoch shopping centre. You're right though, cannot think of a place to build another terminal
I think Central could take more yet
I might raise that at the next electification updateIt could also lose a few services, if the Whifflets get wired and sent through the low level tunnels
Not sure about running Barrheads all the way to killie though, after the evening peak this happens anyway with killies being all stops up and down.
I was thinking that the loops on the Killie line would mean an increased frequency into Ayrshire, but they might struggle to fit in more paths into Central

