I don't think Trainfan344 was disagreeing - i'm guessing they were linking to Wikipedia in response to you writing:Er, I thought I referred to it as being single-track?
w0033944 said:...but the one I'm unsure about is Trowse Swing Bridge, which, according to my rail atlas, funnels the 2 tracks of the Brecks line and the 2 tracks of the GEML to a single track crossing the river. Could those more knowledgeable than I please comment on whether this is a problem or not?
Anyway, back on topic, i'd be inclined to agree that it's the lack of the capacity on the GEML which is the main problem, rather than the ageing stock. I'd prefer to see NR improve the capacity first and then plan with more suitable rolling stock from there.
)