Hi folks, long time lurker, first time poster.
The Thameslink Programme work on the core route between Blackfriars and St Pancras is almost finished - FCC has announced the regular weekend and late night closures of the route will finally end on 19 May.
Once London Bridge has been rebuilt, there will be new and longer trains and more tph for all Thameslink passengers except for the poor sods on the Wimbledon/Sutton loop, who will see no service improvements and actually lose cross-London trains. Trains from the loop will be terminating in Blackfriars' new bays from 2018 because there won't be enough room for them on the core route once the new timetable kicks in.
As it stands, there are only 4tph on the loop even though there is often a crush on rush hour trains. Whenever there is a shortage of staff or some other disruption, FCC will cancel loop trains to keep the Bedford/Brighton line going. I also understand (but this may not be reliable info) that the last train of the night to serve the entire loop (Elephant & Castle downwards) will still be the 22:16 from Blackfriars even after the late night closures finish. FCC seems to have no interest in the route at all.
Is there more that could/should be done with the loop? The junction north of Herne Hill does constrain the service frequency, but there will be spare capacity (at least 4tph) after London Bridge is rebuilt and no Bedford/Brighton trains have to be routinely routed via Herne Hill. It also seems like a bit of a waste of Blackfriars' bay platforms to have only one train leave every 15 minutes when the station's other platforms will be served every few minutes (and southbound trains will be constantly off-loading more passengers for the loop).
It seems to me that the loop is a good candidate for absorption into the London Overground. The furthest station from central London is only in Zone 5 and 35 minutes is the maximum journey time on the service, with most stations being within 20 minutes of Blackfriars and the majority of passengers already standing during rush hour. Maintaining the timetable also wouldn't be that difficult - there will be a clear run between Herne Hill junction and Blackfriars after 2018 with no conflicting train movements.
This line and the East London Line Extension actually cross each other at Loughborough Junction, although I can't think of any practical way to provide a direct interchange (the ELLX will pass LJ on the southernmost tracks, which are the furthest from the existing station and on a high-level bridge). Despite this, I still think a metro service with connections to Thameslink, Southeastern, the Circle, District, Northern and Bakerloo lines and the Croydon Tramlink would be well worthwhile. The demand for a more regular service is definitely there (during the rush hour, at least) and no major infrastructure changes would be required, except perhaps for the signals (which are 1km apart as I understand it).
FCC's FAQ on the Thameslink programme says the post-2018 Thameslink franchise has yet to be agreed, so this could be a good opportunity to make something out of the loop instead of leaving it as an apparently unwanted appendage.
What does everyone think?
The Thameslink Programme work on the core route between Blackfriars and St Pancras is almost finished - FCC has announced the regular weekend and late night closures of the route will finally end on 19 May.
Once London Bridge has been rebuilt, there will be new and longer trains and more tph for all Thameslink passengers except for the poor sods on the Wimbledon/Sutton loop, who will see no service improvements and actually lose cross-London trains. Trains from the loop will be terminating in Blackfriars' new bays from 2018 because there won't be enough room for them on the core route once the new timetable kicks in.
As it stands, there are only 4tph on the loop even though there is often a crush on rush hour trains. Whenever there is a shortage of staff or some other disruption, FCC will cancel loop trains to keep the Bedford/Brighton line going. I also understand (but this may not be reliable info) that the last train of the night to serve the entire loop (Elephant & Castle downwards) will still be the 22:16 from Blackfriars even after the late night closures finish. FCC seems to have no interest in the route at all.
Is there more that could/should be done with the loop? The junction north of Herne Hill does constrain the service frequency, but there will be spare capacity (at least 4tph) after London Bridge is rebuilt and no Bedford/Brighton trains have to be routinely routed via Herne Hill. It also seems like a bit of a waste of Blackfriars' bay platforms to have only one train leave every 15 minutes when the station's other platforms will be served every few minutes (and southbound trains will be constantly off-loading more passengers for the loop).
It seems to me that the loop is a good candidate for absorption into the London Overground. The furthest station from central London is only in Zone 5 and 35 minutes is the maximum journey time on the service, with most stations being within 20 minutes of Blackfriars and the majority of passengers already standing during rush hour. Maintaining the timetable also wouldn't be that difficult - there will be a clear run between Herne Hill junction and Blackfriars after 2018 with no conflicting train movements.
This line and the East London Line Extension actually cross each other at Loughborough Junction, although I can't think of any practical way to provide a direct interchange (the ELLX will pass LJ on the southernmost tracks, which are the furthest from the existing station and on a high-level bridge). Despite this, I still think a metro service with connections to Thameslink, Southeastern, the Circle, District, Northern and Bakerloo lines and the Croydon Tramlink would be well worthwhile. The demand for a more regular service is definitely there (during the rush hour, at least) and no major infrastructure changes would be required, except perhaps for the signals (which are 1km apart as I understand it).
FCC's FAQ on the Thameslink programme says the post-2018 Thameslink franchise has yet to be agreed, so this could be a good opportunity to make something out of the loop instead of leaving it as an apparently unwanted appendage.
What does everyone think?