I suspect it would be a disaster to break the line off from its parent franchise. That said, as others have said, there would be no harm in shaming the operator into refreshing the rolling stock and tweaking the timetable into connecting.
Is there now or has there ever been in recent years, any other similar instance of a mainland-based franchise having an island-based offshoot to the franchise that was separated by a ferry crossing time of the time that normal ferries take to connect or is the Island Line unique in this situation?
Ever tried walking from Sandown railway station to the main shopping area of the town, let alone the hotels on the sea front?
Can't think of any true island networks in the UK unless Holyhead Breakwater counts. The NG line on Mull?
Is there any weight restriction on the road on the pier (could it handle the weight of a fully loaded double decker bus)?
...and would there be room for the bus to turn around? Can't imagine bus drivers would be keen on reversing down the pier!
It's no further than walking up Ryde Pier and considerably less exposed to the weather!
I suspect it would be a disaster to break the line off from its parent franchise. That said, as others have said, there would be no harm in shaming the operator into refreshing the rolling stock and tweaking the timetable into connecting.
About 32 chains is my distance from the Pier Head station to the Esplanade station. Glad to hear that the weather in the Sandown area is more clement in its exposure to local residents than that to be found in the area of the pier.
A good walk along a long-ish pier is quite a good experience. Southport in particular has a pier of some length that I have walked very many times in both directions in my 70 years.
--- old post above --- --- new post below ---
It is now less than 18 months to go before the current franchise ends on 3rd February 2017, so no amount of shaming will encourage a franchisee to make finance available in the short term for the improvements that you state above in that remaining time period.
Is there any weight restriction on the road on the pier (could it handle the weight of a fully loaded double decker bus)?
About 32 chains is my distance from the Pier Head station to the Esplanade station. Glad to hear that the weather in the Sandown area is more clement in its exposure to local residents than that to be found in the area of the pier.
A good walk along a long-ish pier is quite a good experience. Southport in particular has a pier of some length that I have walked very many times in both directions in my 70 years.
Too much. I was thinking smaller minibuses or even an electrically hauled toy road train thing.
Isle of Man maybe
How much would it cost to re-instate the tram on the pier? I'm guessing that a lot of structural work would be needed
Ultra pod shuttle?
http://www.ultraglobalprt.com/
How about the ferry company investing in a brand-new comfortable 2-car rail shuttle vehicle of the same weight and seating capacity as the existing train to perform the task of taking ferry foot passengers from the Pier Head to the Esplanade Interchange along the existing rail track, should the rail service as such no longer exist.
A Pacer buzzing back and forth, or indeed a D78, would no doubt do that job perfectly well. It's Ryde tunnel that presents the loading gauge issue.
Though the depot facilities are on the other side of the tunnel and I don't believe there would be room to establish a new facility on the pier side of the tunnel so maintenance would be an issue.
To me, the talk of local stakeholders finding a way to reduce the cost of running the line suggests something more like adding a link to the steam railway and thinning out the electric service so steam trains could use as much of the line as they can reach on their own, more expensive, tickets. With or without new loops to support it.I suspect it would be a disaster to break the line off from its parent franchise. That said, as others have said, there would be no harm in shaming the operator into refreshing the rolling stock and tweaking the timetable into connecting.
To me, the talk of local stakeholders finding a way to reduce the cost of running the line suggests something more like adding a link to the steam railway and thinning out the electric service so steam trains could use as much of the line as they can reach on their own, more expensive, tickets. With or without new loops to support it.
Or they may just scrap the Evening Returns and say they've done something.
How about the ferry company investing in a brand-new comfortable 2-car rail shuttle vehicle of the same weight and seating capacity as the existing train to perform the task of taking ferry foot passengers from the Pier Head to the Esplanade Interchange along the existing rail track, should the rail service as such no longer exist.
Why not make it free to travel by train on the peir and charge the ferry operator a percentage of the total cost of the service. That way the ferry would either go elsewhere removing the need to take trains along the peir(reducing costs) or there would be extra funding for the service from the ferry company.