R

RailUK Forums

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
Here's a wild out there idea - fit them with diesel engines (so become bimodes) and ship them to Chiltern to cascade the 168s to Northern
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Here's a wild out there idea - fit them with diesel engines (so become bimodes) and ship them to Chiltern to cascade the 168s to Northern
What benefit would replacing the 168s give anyway except spending quite a bit of money equipping the engines, when said money is perhaps needed elsewhere?
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
What benefit would replacing the 168s give anyway except spending quite a bit of money which is needed elsewhere?
A) standard carriage lengths on services to Brum/Oxford from Marylebone (instead of the mix of 2-4 carriage units that Chiltern run.
B) Allows the 168s to be sent to Northern to be able to see off some of the 15x stock
C) Allows for use "under the wires" if/when the Snow Hill Lines gets wired, plus use under the wires if a diversion into New Street is needed.

Alternatively they could be converted to bimode units and, still sending to Chiltern, cascade the 168s to the 165 operated routes, meaning the 165s could get sent to Great Western. Plus it could be classed as a "levelling up" project for the Midlands!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,532
Location
Northampton
A) standard carriage lengths on services to Brum/Oxford from Marylebone (instead of the mix of 2-4 carriage units that Chiltern run.
B) Allows the 168s to be sent to Northern to be able to see off some of the 15x stock
C) Allows for use "under the wires" if/when the Snow Hill Lines gets wired, plus use under the wires if a diversion into New Street is needed.

Alternatively they could be converted to bimode units and, still sending to Chiltern, cascade the 168s to the 165 operated routes, meaning the 165s could get sent to Great Western. Plus it could be classed as a "levelling up" project for the Midlands!
You are proposing some quite serious mechanical work for which these units were never designed, and the 379s will be life expired before wires reach the Snow Hill Lines.

If you're replacing the Chiltern fleet, either AT200-family bi-modes or the Stadler Flirts with the detachable power packs are the way to go, but money to fund that isn't easy.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
A) standard carriage lengths on services to Brum/Oxford from Marylebone (instead of the mix of 2-4 carriage units that Chiltern run.
B) Allows the 168s to be sent to Northern to be able to see off some of the 15x stock
C) Allows for use "under the wires" if/when the Snow Hill Lines gets wired, plus use under the wires if a diversion into New Street is needed.

Alternatively they could be converted to bimode units and, still sending to Chiltern, cascade the 168s to the 165 operated routes, meaning the 165s could get sent to Great Western. Plus it could be classed as a "levelling up" project for the Midlands!
But are all these benefits things that absolutely have to be done, or are they all placed under the pretence 'if there is money'? Chiltern also seem to have a lot more Turbos and 168s than there are number of 379s? If you are proposing 8 car runs (which I am not sure whether you are or not), then I am sure most would have to be short formed anyway?
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
The other idea I did have was for use as replacements for 323s at Northern to be fair
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The other idea I did have was for use as replacements for 323s at Northern to be fair
Don't Northern want 323s though? I believe some of WMT's are going to Northern and it doesn't seem as if their life is over yet either. This thread seems to be going round in circles, I think the end result with all propositions, is that there is either no money or it just doesn't seems realistic in the timescale of 379s life.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,488
Location
Northern England
The other idea I did have was for use as replacements for 323s at Northern to be fair
They're too long for Stoke-on-Trent, and there aren't enough of them. Besides, the 323s don't really need replacing.

The obvious thing to do in a situation with a stretched and outdated DMU fleet combined with a surplus of serviceable EMUs is electrification. This would be a much better investment (which of course means it won't happen!) than arbitrarily shuffling stock around or attempting conversion programmes which have no guarantee of success.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,647
Location
Croydon
They're too long for Stoke-on-Trent, and there aren't enough of them. Besides, the 323s don't really need replacing.

The obvious thing to do in a situation with a stretched and outdated DMU fleet combined with a surplus of serviceable EMUs is electrification. This would be a much better investment (which of course means it won't happen!) than arbitrarily shuffling stock around or attempting conversion programmes which have no guarantee of success.
Oh yes please. (see below) If only.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
Here's a wild out there idea - fit them with diesel engines (so become bimodes) and ship them to Chiltern to cascade the 168s to Northern

Super idea.

I wonder if anyone else has tried to fit diesel traction packs to trains that were formerly electric only, and if so what the result was? :oops:
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
The obvious thing to do in a situation with a stretched and outdated DMU fleet combined with a surplus of serviceable EMUs is electrification. This would be a much better investment (which of course means it won't happen!) than arbitrarily shuffling stock around or attempting conversion programmes which have no guarantee of success.
Platforms 1 & 2 at SOT are signalled in both directions so 379s could terminate in platform 1, go into a siding and then use platform 2 to go Northbound.

However there are not enough 379s to replace the 323s as you say.

323s will be 30 years old when they reach Northern and by then replacements may be looked at.

323 replacements will most likely by more 331s, or perhaps 350/2s.

I think the 379s will soon be scrapped.

== Doublepost prevention - post automatically merged: ==

Super idea.

I wonder if anyone else has tried to fit diesel traction packs to trains that were formerly electric only, and if so what the result was? :oops:
Those were 30+ year old 319s, 379s are only 11 years old so addition of a diesel could work.

However I can’t see bi-mode 379s ever happening.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Platforms 1 & 2 at SOT are signalled in both directions so 379s could terminate in platform 1, go into a siding and then use platform 2 to go Northbound.

However there are not enough 379s to replace the 323s as you say.

323s will be 30 years old when they reach Northern and by then replacements may be looked at.

323 replacements will most likely by more 331s, or perhaps 350/2s.

I think the 379s will soon be scrapped.
I think with most TOCs, they'll start to look at the Southern way of doing things when it comes to replacements: Don't and start reducing trains lengths and hope no one notices.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,478
I think with most TOCs, they'll start to look at the Southern way of doing things when it comes to replacements: Don't and start reducing trains lengths and hope no one notices.

This also has the added bonus of meeting the DfT OPEX budgets for 23/24
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
Those were 30+ year old 319s, 379s are only 11 years old so addition of a diesel could work.
Does not mean it would be easier - with more complex software systems and electrics I would imagine it would still be a challenge. Looking at the GWR 769s I think it’s best to say that no ROSCOs are going to be in a rush to put Diesel power packs on EMUs.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Age is not so much an issue, as the design of the trains.
Thanks for reminding me of that. However in the 319s case the issue was age… well age of the equipment. As getting modern day diesel equipment to work with 1980s DC equipment caused issues. (Or at least according to an article in a issue of Today's Railways UK from earlier this year that was the issue)

== Doublepost prevention - post automatically merged: ==

Looking at the GWR 769s I think it’s best to say that no ROSCOs are going to be in a rush to put Diesel power packs on EMUs.
I agree I can’t see any ROSCO wanting to put diesel equipment on off lease EMUs any time soon.
 
Last edited:

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Here's a wild out there idea - fit them with diesel engines (so become bimodes) and ship them to Chiltern to cascade the 168s to Northern
If anyone needs bimodes, it's Northern with services such as Windermere to Manchester Airport being operated by 195s

Platforms 1 & 2 at SOT are signalled in both directions so 379s could terminate in platform 1, go into a siding and then use platform 2 to go Northbound.

However there are not enough 379s to replace the 323s as you say.

323s will be 30 years old when they reach Northern and by then replacements may be looked at.

323 replacements will most likely by more 331s, or perhaps 350/2s.

I think the 379s will soon be scrapped.

== Doublepost prevention - post automatically merged: ==


Those were 30+ year old 319s, 379s are only 11 years old so addition of a diesel could work.

However I can’t see bi-mode 379s ever happening.
The 323s should be replaced by 350/2s given that they have the right interior for the services operated by 323s. Yes, there is slightly less of them but it is not a large difference and they are longer trains with more capacity.
A certain operator are also in need of 125mph EMUs and TPE have some that cannot reach their top speed on the WCML. (TPE 397s on LNER replacing class 91s with 379s operating TPEs scottish services)
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
The 323s should be replaced by 350/2s given that they have the right interior for the services operated by 323s. Yes, there is slightly less of them but it is not a large difference and they are longer trains with more capacity.
The current plan has Northern getting a total of 32 323, there are 34 350/2s so there are more 350/2s. However as a fleet yes there are more 323s than 350/2s.

It would not surprise me if Portorbrook were to try and give Northern all 350/2 instead of 32 323s, given that some 379s have been off lease for 11 months now and all 379s are most likely to be scrapped.

If more of the network was wired and there was money available (there is no money btw) then the 379s would have had a new home by now.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,819
The current plan has Northern getting a total of 32 323, there are 34 350/2s so there are more 350/2s. However as a fleet yes there are more 323s than 350/2s.
Northern has 17 323s currently with another 17 to transfer from West Mids, which made 34 when I was at school. And there are 37 350/2s.

This topic has been done to death on here, btw...
 

Sutton in Ant

Member
Joined
2 Mar 2021
Messages
256
Location
Sutton Surrey
Well. The original plan was that the 379's were going to go to Great Northern and the 387s from Great Northern were going to go to Southern Railways. Barring a miracle. That is not going to happen.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
It would not surprise me if Portorbrook were to try and give Northern all 350/2 instead of 32 323s, given that some 379s have been off lease for 11 months now and all 379s are most likely to be scrapped.
No one is giving anything to anyone. The DfT are simply not going to pay for the traincrew training that introducing 350s or 379s in the North of England would entail.

34 350/2s
37
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,488
Location
Northern England
Platforms 1 & 2 at SOT are signalled in both directions so 379s could terminate in platform 1, go into a siding and then use platform 2 to go Northbound.
You are correct, and indeed 6-car 323 formations do run at the weekend (though they go north from platform 1 and then use crossovers north of the station).

The question, of course, is whether there is enough line capacity to do this every hour, reliably, without impacting the rest of the service through SOT. The current weekend arrangement might well be taking advantage of the gaps left by the second hourly Avanti and/or CrossCountry services.

323s will be 30 years old when they reach Northern and by then replacements may be looked at.
I really think they should be looking at Sprinter replacement before 323 replacement. Of course, if the solution for Sprinters is electrification and EMUs (or even bimodes) then great, order enough to replace the 323s at the same time.

I think with most TOCs, they'll start to look at the Southern way of doing things when it comes to replacements: Don't and start reducing trains lengths and hope no one notices.
Northern won't be able to get away with that as easily as they run a lot of trains formed of short single units already. Good luck "reducing train lengths" on the Crewe-Manchester circuit, for example! (runs almost exclusively with single 3-car EMUs)

The 323s should be replaced by 350/2s given that they have the right interior for the services operated by 323s. Yes, there is slightly less of them but it is not a large difference and they are longer trains with more capacity.
That's exactly the kind of pointless shuffling around we don't need at the moment. The 323s are a bit dated now but generally fine, and it would no doubt be costly to bring in the 350s for very little benefit to passengers. Also, the 350s are too long for the bay platform at Stoke-on-Trent (although that could be solved by simply always running a 331 on that route). On Northern, it's the Sprinters that are the real problem.
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
Well, instead of using the bay at Stoke, why not run it to Stafford/Wolverhampton/Birmingham and have it call all stations?

Maybe transfer that service to London North Western at the same Time.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,532
Location
Northampton
Well, instead of using the bay at Stoke, why not run it to Stafford/Wolverhampton/Birmingham and have it call all stations?

Maybe transfer that service to London North Western at the same Time.
Is there enough stock to cover the extended Journey time even to Stafford?
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
Not as less as it could be is the new more.

Look. We really do keep running into the same problems with the 379s. Nobody wants them, or if they do want them they cannot afford them & if they can afford them there’s something going on a DfT that’s stopping them having them.

The reality is that the only chance you’ve got of getting on a 379 now is if an open access operator does something with them.

The DfT does not want them, there’s no desire to run more trains. We are dealing with [badly] managed decline. There’s no growth.


I know I sound very depressing saying this and as someone who would love to see the railways actually thrive (for many reasons) it depresses me to say it. The reality though is the 379s aren’t going to carry punters again. But if they do then I’ll be delighted.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Is there enough stock to cover the extended Journey time even to Stafford?
If the 350/2s are introduced, definetly enough to run it as far as Wolverhampton, especially with the fact that they have a higher top speed and would reduce journey times.
 

Ayman Ilham

Member
Joined
2 Jul 2016
Messages
462
Location
Blackburn (Lancs)
Not as less as it could be is the new more.

Look. We really do keep running into the same problems with the 379s. Nobody wants them, or if they do want them they cannot afford them & if they can afford them there’s something going on a DfT that’s stopping them having them.

The reality is that the only chance you’ve got of getting on a 379 now is if an open access operator does something with them.

The DfT does not want them, there’s no desire to run more trains. We are dealing with [badly] managed decline. There’s no growth.


I know I sound very depressing saying this and as someone who would love to see the railways actually thrive (for many reasons) it depresses me to say it. The reality though is the 379s aren’t going to carry punters again. But if they do then I’ll be delighted.
Honestly, if the 379s do get scrapped, I'll officially have lost ALL faith in UK railways FULL STOP. We finally have more than enough trains to solve capacity problems and now the DfT no longer have the resources to utilise them; time to consider relocating to a country that can actually manage their railways properly like Switzerland or Morocco.
 