• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future of Class 379

Status
Not open for further replies.

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The 350/2s could be sent to GWR so their 387s could be sent to SE if the 323s are to not be replaced. Or the 350/2s could just be made dual voltage as they are perfect for SE otherwise.
Again, we keep going round in complete circles, the money for conversions isn't there? This has been stated so many times, in addition, what benefit appears when you replace 350s (older than 387s) with 387s (slightly newer stock) ?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,397
Location
Hertfordshire / Teesdale
But that doesn't mean 5 days a week in the office AND it doesn't require everyone to be at their desk before 9am.

If people are allowed to work flexibly, thus spreading the load across the day, then less extra rush hour capacity will be needed.

My feeling is that, over time, all this flexible will gradually drift away. For the simple reason that most people seem to *want* to work 9-5. There aren’t going to be masses of people who want to finish in the evening. There will of course be some who are happy to come in earlier to finish earlier, but that was already happening, and if anything caused more of a headache for the railway as it meant adding extra carriages to very early services which in some cases couldn’t get back to the country end in time to work another peak service.

The 80s is a cautionary tale to all this. Strip capacity away, and then get badly bitten when demand returns.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
The 350/2s could be sent to GWR so their 387s could be sent to SE if the 323s are to not be replaced.
I hate to be negative, but why would GWR want older trains? Having to retrain staff and completely upgrade their facilities to get worse units makes minimal sense in any economic climate, let alone the current one.

Or the 350/2s could just be made dual voltage as they are perfect for SE otherwise.
I wouldn't go that far. The 350/2s don't have 3rd rail shoes, so will need extensive work to make them DC compatible. Again, there is no money to convert them.
Southeastern already have Networkers, Javelins, Desiro Cities, Electrostars; I can't see them wanting to add another family to that list for both maintenance and staffing reasons.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Again, we keep going round in complete circles, the money for conversions isn't there? This has been stated so many times, in addition, what benefit appears when you replace 350s (older stock) with 387s (slightly newer stock) ?
Well, SE need new trains. It can be fulfilled with existing stock. SE need trains that can use third rail. SE want (doesnt matter too much) trains without a real first class. 387s are dual voltage and would not need too much modification. However the 387s that move to SE (from gwr, TL would use 379s) would need a replacement. The 350/2 are avaliable 110mph EMUs.
I hate to be negative, but why would GWR want older trains? Having to retrain staff and completely upgrade their facilities to get worse units makes minimal sense in any economic climate, let alone the current one.

I wouldn't go that far. The 350/2s don't have 3rd rail shoes, so will need extensive work to make them DC compatible. Again, there is no money to convert them.
Southeastern already have Networkers, Javelins, Desiro Cities, Electrostars; I can't see them wanting to add another family to that list for both maintenance and staffing reasons.
GWR have no reason to want older trains, it's that their current stock would be better used elsewhere.

The 350/1 are dual voltage already, it should not be too much work. However I understand the maintenance concerns with such a fragmented fleet for SE, which is why I therefore suggest use of 387s from GWR.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Well, SE need new trains. It can be fulfilled with existing stock. SE need trains that can use third rail. SE want (doesnt matter too much) trains without a real first class. 387s are dual voltage and would not need too much modification. However the 387s that move to SE (from gwr, TL would use 379s) would need a replacement. The 350/2 are avaliable 110mph EMUs.

GWR have no reason to want older trains, it's that their current stock would be better used elsewhere.

The 350/1 are dual voltage already, it should not be too much work. However I understand the maintenance concerns with such a fragmented fleet for SE, which is why I therefore suggest use of 387s from GWR.
SE want trains that already have DC capability, and I assume from that, don’t want to pay for conversions which will ultimately come out of the Government’s pocket.

350s don’t automatically fit this requirement, so they must be immediately disqualified from these proposals.

Here is a thread dedicated to this subject of finding ways to solve SE’s existing rolling stock tender with existing fleets:


== Doublepost prevention - post automatically merged: ==

Well, SE need new trains. It can be fulfilled with existing stock. SE need trains that can use third rail. SE want (doesnt matter too much) trains without a real first class. 387s are dual voltage and would not need too much modification. However the 387s that move to SE (from gwr, TL would use 379s) would need a replacement. The 350/2 are avaliable 110mph EMUs.

GWR have no reason to want older trains, it's that their current stock would be better used elsewhere.

The 350/1 are dual voltage already, it should not be too much work. However I understand the maintenance concerns with such a fragmented fleet for SE, which is why I therefore suggest use of 387s from GWR.
350/1s aren’t leaving LNWR? How would 387s be better used elsewhere and how would 350s aid GWR anymore than what 387s are doing?
 
Last edited:

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
For Metro operation, not the longer distance work.
The 350/2s would be best for metro ops but the 387s aren't half bad for that sort of operation given their history on TL. The 379s would not be suitable without an expensive interior refurbishment for definite...
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The 350/2s would be best for metro ops but the 387s aren't half bad for that sort of operation given their history on TL. The 379s would not be suitable without an expensive interior refurbishment for definite...
Apologies if I have understood this wrong, but how does your proposal tie into the 379s at all? It only seems to include 350s and 387s?
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Apologies if I have understood this wrong, but how does your proposal tie into the 379s at all? It only seems to include 350s and 387s?
The 379s go to GN, who have always been the obvious choice for these trains. GN 387s go to SE. 350/2s go to GWR to so their 387s go to SE. The eventual idea being that the vast majority of 387s are operated by SE.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The 379s go to GN, who have always been the obvious choice for these trains. GN 387s go to SE. 350/2s go to GWR to so their 387s go to SE. The eventual idea being that the vast majority of 387s are operated by SE.
There aren't enough 379s to replace GN's 387s and GN don't need to replace 387s with an older fleet as well. Won't SE have a surplus stock anyway with your proposal or are you attempting to replace all networkers?
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
This thread really is getting tiresome.

Please understand this very simple concept people.

“If they aren’t any use as OHLE powered units they are no use as any units”

Passenger numbers will of course rise to 2019 levels, but that will still be 4 years later than 2019 and they’ll still be lower than they should be. The DfT will by that point have killed off any desire to people may have had to use the railway for anything other than absolute necessity!!
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
There aren't enough 379s to replace GN's 387s and GN don't need to replace 387s with an older fleet as well. Won't SE have a surplus stock anyway with your proposal or are you attempting to replace all networkers?
It would be to replace around half of the networker fleet, GN have surplus stock, their core service only needs 16 units(at peak with half hourly to KL) plus the peterbrough peak extras need 6(3 departures daily) so it's fine. SE can replace about half their networkers, including all the more troublesome ones.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
This thread really is getting tiresome.

Please understand this very simple concept people.

“If they aren’t any use as OHLE powered units they are no use as any units”

Passenger numbers will of course rise to 2019 levels, but that will still be 4 years later than 2019 and they’ll still be lower than they should be. The DfT will by that point have killed off any desire to people may have had to use the railway for anything other than absolute necessity!!
This. The 379s are a solution looking for a problem if truth be told. Yes they are new and comfortable, but none of that will offset the fact that the railways are not in a good state financially and nobody can afford to lease the 379s right now. If they were affordable enough (and if they were wanted), then they would be in service right now - but they aren't, and that alone should be enough to prove that there is no demand for them right now.

My view is that the real choice is whether to scrap them, or try to store them for another few years until demand arises (which it will eventually) - not the choice between which TOCs will be willing to fork out millions to get them back into service during a time of financial cuts and instability.
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
This. The 379s are a solution looking for a problem if truth be told. Yes they are new and comfortable, but none of that will offset the fact that the railways are not in a good state financially and nobody can afford to lease the 379s right now. If they were affordable enough (and if they were wanted), then they would be in service right now - but they aren't, and that alone should be enough to prove that there is no demand for them right now.

My view is that the real choice is whether to scrap them, or try to store them for another few years until demand arises (which it will eventually) - not the choice between which TOCs will be willing to fork out millions to get them back into service during a time of financial cuts and instability.
I agree mostly, but it’s not about affordability. The issue is that DfT will not let the TOCs do what they think is best or to grow their businesses. I have had made clear to me (from a very reliable source) that most TOCS want to give (or at least make sensible offers of) pay rises, but they are suffocated by the government. What would be interesting would be if a TOC had the guts to stand up to DfT and just do it.

But back to the 379s. No, they won’t be left to rot because they don’t have a use or because they can’t be afforded, but because the DfT does not want the railways to grow right now. I was told (again by a very reliable source) that the chancellor and the government would be using Covid to try and break the Trade Unions back in mid 2020.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
I agree mostly, but it’s not about affordability. The issue is that DfT will not let the TOCs do what they think is best or to grow their businesses. I have had made clear to me (from a very reliable source) that most TOCS want to give (or at least make sensible offers of) pay rises, but they are suffocated by the government. What would be interesting would be if a TOC had the guts to stand up to DfT and just do it.

But back to the 379s. No, they won’t be left to rot because they don’t have a use or because they can’t be afforded, but because the DfT does not want the railways to grow right now. I was told (again by a very reliable source) that the chancellor and the government would be using Covid to try and break the Trade Unions back in mid 2020.
Yes, it does seem the DfT are behind a lot of this. I think that if given the chance someone like GTR would have taken on the 379s months ago; it's not a case of them not being wanted as such; but the DfT will likely not let them.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,846
450s on the Reading, Windsor and Hounslow loop lines as well.
And they struggle to meet the timings.

Notably, 450s were kept off SWT mainline suburban workings as far as possible, even in the event of a shortage of 455s: SWT much preferred to substitute with 458s precisely because they have much faster door cycle times.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Yes, it does seem the DfT are behind a lot of this. I think that if given the chance someone like GTR would have taken on the 379s months ago; it's not a case of them not being wanted as such; but the DfT will likely not let them.
The dft (through SE) have said that Southeastern needs new trains. The most "affordable" option will be existing trains(387s) cascaded from other operators(GN and GWR) who can use 379s and 350/2s to cover what they have.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The dft (through SE) have said that Southeastern needs new trains. The most "affordable" option will be existing trains(387s) cascaded from other operators(GN and GWR) who can use 379s and 350/2s to cover what they have.
I refer you to this thread again, as there is a dedicated discussion for this topic:

 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,838
The most "affordable" option will be existing trains(387s) cascaded from other operators(GN and GWR) who can use 379s and 350/2s to cover what they have.

Can you show us how it will be the most affordable?
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Can you show us how it will be the most affordable?
Especially when the 387s would need various modifications like having batteries fitted to meet the tender.
The tender is pretty overambitious in terms of what it wants from the trains. The dft is going to have to compromise of it wants existing trains. The lease cost of the trains should significantly reduce if Akiem realistically believe that they could re-enter service. However it might be that the tender is deliberately designed to ensure that a new train order takes place.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The tender is pretty overambitious in terms of what it wants from the trains. The dft is going to have to compromise of it wants existing trains. The lease cost of the trains should significantly reduce if Akiem realistically believe that they could re-enter service. However it might be that the tender is deliberately designed to ensure that a new train order takes place.
This is incorrect, I think you may have misunderstood the tenders put in place: There is one that asks for NEW rolling stock, and the other asks for existing rolling stock, although, the latter's demands are hard to meet. Both closed on the 9th of December.

Leasing of existing Rolling Stock for Southeastern Metro Services to meet October 2027 demand​

Supply of and Maintenance Support for new Rolling Stock for Southeastern​


However, I do feel as if this is off-topic as there is already 2 Southeastern fleet replacement threads:

 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,397
Location
Hertfordshire / Teesdale
This. The 379s are a solution looking for a problem if truth be told. Yes they are new and comfortable, but none of that will offset the fact that the railways are not in a good state financially and nobody can afford to lease the 379s right now. If they were affordable enough (and if they were wanted), then they would be in service right now - but they aren't, and that alone should be enough to prove that there is no demand for them right now.

My view is that the real choice is whether to scrap them, or try to store them for another few years until demand arises (which it will eventually) - not the choice between which TOCs will be willing to fork out millions to get them back into service during a time of financial cuts and instability.

Storage for several years really isn’t likely to have a good outcome, especially if they’re stored cold, and I can’t see anyone paying for warm store.

I agree with the view that much will depend on what the owners want to do. If they’re prepared to lease them at a low rate on the basis that anything is better than nothing then there is probably a deal to be done. If on the other hand they decide it’s all too much bother then, unless one of the other leasing companies wishes to buy them at scrap value (and I’m not convinced they would want to do that in the current climate and with other fleets unemployed not least the 350/2s), they could well end up getting sold for scrap.

My personal, perhaps wishful, thinking is that a deal of some kind will eventually happen. There is a real risk of ending up short of stock when and if demand recovers, especially now fleets like the 365s, 455s have been binned off, surely DFT knows that will be electorally risky in the south-east. We know this government doesn’t give a stuff about London, however with the polls as they are there are plenty of seats in the wider south-east which are now looking decidedly risky. They may think these polls are an over-reaction, but judging by opinions I hear from a wide cross-section of people the feeling I get is pretty much everyone is sick of this government and can’t want to boot them out.
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
I won’t let this thread digress yet further, but what I will say is look carefully at who is awarded the Southeastern new train contract. Far be it from me to suggest it will go to a Tory ‘friend’ but…..

Class 379s are ideal for many places that run AC OHLE EMUs, the original Class 379-387 cascade was their best shot at reuse. Class 387s on the West London Line would have allowed for capacity increases and allowed the 3x Class 377s on the circuit to be freed up. You would also be able to expand services back up to Tring or Milton without a stock problem.

But please people, remember for the time being at least ‘growth’ is a dirty word.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,268
I won’t let this thread digress yet further, but what I will say is look carefully at who is awarded the Southeastern new train contract. Far be it from me to suggest it will go to a Tory ‘friend’ but…..

Class 379s are ideal for many places that run AC OHLE EMUs, the original Class 379-387 cascade was their best shot at reuse. Class 387s on the West London Line would have allowed for capacity increases and allowed the 3x Class 377s on the circuit to be freed up. You would also be able to expand services back up to Tring or Milton without a stock problem.

But please people, remember for the time being at least ‘growth’ is a dirty word.
But the Southeastern suggestions aren't about growth, they're about replacing knackered Networkers (especially the Metro-Cammell ones) with existing 379s, whether directly or indirectly.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
But the Southeastern suggestions aren't about growth, they're about replacing knackered Networkers (especially the Metro-Cammell ones) with existing 379s, whether directly or indirectly.
But the 379s don't have 3rd rail equipment, and conversion is unlikely to be economic. So who is currently operating dual-voltage EMUs (or AC EMUs that can be economically adapted) that could accept the 379 fleet to release trains to replace the networkers?
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,268
But the 379s don't have 3rd rail equipment, and conversion is unlikely to be economic. So who is currently operating dual-voltage EMUs (or AC EMUs that can be economically adapted) that could accept the 379 fleet to release trains to replace the networkers?
Which is why I also said "indirectly", as some of the other suggestions involve using the 379s to displace 387s
 

ashkeba

Established Member
Joined
13 May 2019
Messages
2,171
Unfortunately the GN 387s are exactly what is needed on the GN so they aren't available.
The 387s are a hated downgrade from the 365s on the Cambridge cruiser services. The 379s might be more suitable, from what I remember from their occasional trips north of Cambridge.
 
Status
Not open for further replies.

Top