greatvoyager
Established Member
Agreed, but I bet that would be seen as too expensive.There would be a good case for replacing all the engines with more modern ones.
Agreed, but I bet that would be seen as too expensive.There would be a good case for replacing all the engines with more modern ones.
the other thing to throw into the mix is, would the transformer car(s) be equipped with a diesel genset? If it isn't, the others will have the dead weight of another coach to haul, reducing the performance on diesel. If it is equipped with a diesel, would it have grandfather rights and be allowed to be a 750bhp Cummins 19QSK like the rest of the rake, or, if it is classed as a new build, would it have to be different conform to the latest emission regs? I can't see maintenance staff being happy with a mix of engine types in same rake.
Funny, as I have in the past suggested that the mechanicals of the voyagers were okay and a possibility might be to create body shells which would be lighter than the heavy steel voyager body and provide more roomy accommodation. My idea didn't fly (at least amongst forum users), but you effectively suggest the opposite.There would be a good case for replacing all the engines with more modern ones.
Would the ROSCO want to spend money modifying them though? Wouldn't modifying them to that extent mean a higher lease price to recoup the costs?Funny, as I have in the past suggested that the mechanicals of the voyagers were okay and a possibility might be to create body shells which would be lighter than the heavy steel voyager body and provide more roomy accommodation. My idea didn't fly (at least amongst forum users), but you effectively suggest the opposite.
That's the problem, once their replacement is announced, not that I expect that to be soon, there will be no real work for them.Even if it was theoretically economical to spend serious money on the 22x through to life end would any ROSCO be willing to risk it?
Political announcement of a whole new bimode XC fleet and they are left with a load of trains with very few other route options.
Good suggestion. Could be cleaner and perhaps have slightly lower output, as the trains are somewhat overpowered today, especially the 220s. Could be combined with adding batteries in a hybrid configuration for cleaner and quieter urban running, and new bogies on the 221s to save weight. A 'plug in' feature (using short switchable sections of 3rd rail) could be optional at depots, stabling points and a handful of stations where long layovers are scheduled, so trains could always start the operating day on a full charge as well as a full tank. The shoes thus provided could also allow electric running on existing 3rd rail equipped lines in the south.There would be a good case for replacing all the engines with more modern ones.
That sounds like a great idea and I'd like to see it, but it would probably be deemed too expensive.Good suggestion. Could be cleaner and perhaps have slightly lower output, as the trains are somewhat overpowered today, especially the 220s. Could be combined with adding batteries in a hybrid configuration for cleaner and quieter urban running, and new bogies on the 221s to save weight. A 'plug in' feature (using short switchable sections of 3rd rail) could be optional at depots, stabling points and a handful of stations where long layovers are scheduled, so trains could always start the operating day on a full charge as well as a full tank. The shoes thus provided could also allow electric running on existing 3rd rail equipped lines in the south.
Whatever replaces them will probably be equipped with 3rd rail shoes and pantographs.
Very true.I would be surprised if it had shoes but it will pretty certainly have a pantograph and be made by Hitachi![]()
I have been on one with Standing passengers in 1st a while back, so it can happen. On Fridays when I used to travel Oxford to New Street in 1st, there was a healthy loading with nearlly all seats taken.Is first class ever packed on a 4/5-car 22x?
So double formation would helpful for 1st class too.I have been on one with Standing passengers in 1st a while back, so it can happen. On Fridays when I used to travel Oxford to New Street in 1st, there was a healthy loading with nearlly all seats taken.
People suggest end cars could be scrapped, but that is where 1st class is located at one end, so that could cause problems.I have been on one with Standing passengers in 1st a while back, so it can happen. On Fridays when I used to travel Oxford to New Street in 1st, there was a healthy loading with nearlly all seats taken.
Whatever replaces them will probably be equipped with 3rd rail shoes and pantographs.
Good point, didn't think of that.Whilst fitting shoes does seem sensible particularly as attitudes towards diesel trains in electrified areas change; I do wonder whether the power supply would actually cope with them in addition to the current service which seems to be about the limit.
People suggest end cars could be scrapped, but that is where 1st class is located at one end, so that could cause problems.
That would reduce standard class though. I thin it'd be easier to just run in pairs.Voyagers are modular (like near enough every modern train), you'd just fit the First Class seats into a former Standard coach and First Class is then there instead.
With assistance from their engines and batteries the rebuilt Voyagers might regulate how much current they drew from the third rail, perhaps based on measured supply voltage. In particular, the surge on starting away from rest could be mitigated by the battery, just as it could in non-electrified territory where extreme cycling of the diesel engine could be avoided, with maintenance and longevity benefits that Prius and similar hybrid car owners would understand.Whilst fitting shoes does seem sensible particularly as attitudes towards diesel trains in electrified areas change; I do wonder whether the power supply would actually cope with them in addition to the current service which seems to be about the limit.
That would reduce standard class though. I thin it'd be easier to just run in pairs.
Either way, replacing some standard seats with first is a bit risky.It wouldn't need to reduce the overall number of seats, all that would happen is that part of a coach would be first class and the other part would be standard class (as one example of many, think the 444's as originally built).
The problem with (say) running all units as 5 coaches, is that to get the same capacity you need 10 coaches rather than 9.
Now whilst there's something too be said for running short units on the outer edges of the network, you can always fill empty trains with cheap tickets, especially if there's not too many services. For instance the effort to join/divide units at Reading for the sake of saving one or to units when you already need a lot of units to run those services isn't likely to make a big difference either way in terms of costs, but could make a big difference to the income available to you.
That could work.With assistance from their engines and batteries the rebuilt Voyagers might regulate how much current they drew from the third rail, perhaps based on measured supply voltage. In particular, the surge on starting away from rest could be mitigated by the battery, just as it could in non-electrified territory where extreme cycling of the diesel engine could be avoided, with maintenance and longevity benefits that Prius and similar hybrid car owners would understand.
Unless specified on whatever eventually replaces 22x units.Although it further increases the cost and complexity of adding 3rd rail power whilst reducing the benefit (some diesel still used). Given that 3rd rail is a fairly small part of XC's mileage anyway I suspect they may not bother - unless perhaps they only fit a percentage of their fleet with it.
Good suggestion. Could be cleaner and perhaps have slightly lower output, as the trains are somewhat overpowered today, especially the 220s. Could be combined with adding batteries in a hybrid configuration for cleaner and quieter urban running, and new bogies on the 221s to save weight. A 'plug in' feature (using short switchable sections of 3rd rail) could be optional at depots, stabling points and a handful of stations where long layovers are scheduled, so trains could always start the operating day on a full charge as well as a full tank. The shoes thus provided could also allow electric running on existing 3rd rail equipped lines in the south.
Anything to help reduce diesel usage.Why wouldn't you just literally plug it in?
Ships are starting to use plug-in shore supplies whilst in port, so that they don't have to run engines in built-up areas.
Electric car charging is approaching 1000V DC at 125Amps & more.
You could do this in stabling sidings, but with each vehicle a separate hybrid with its own battery that would be a lot of cables to connect manually, especially for a 2x4 coupled set. The 3rd/4th rail solution was something Vivarail proposed for fast charging of their battery trains and has the advantage of being instant and automatic. You just have to pull the train up in the correct position, and 'shazam' you're charging!Why wouldn't you just literally plug it in?
Adding shoes to the train is probably little different in cost to adding charging sockets and the train might have both to suit different locations. The extra charging rail in sidings would be a little more expensive than a flying lead arrangement, but only short sections are needed to align with the shoe positions on the vehicles. If shoes were fitted for static charging purposes primarily, then the the ability to use them on existing 3rd rail is a bonus feature for free.Although it further increases the cost and complexity of adding 3rd rail power whilst reducing the benefit (some diesel still used). Given that 3rd rail is a fairly small part of XC's mileage anyway I suspect they may not bother - unless perhaps they only fit a percentage of their fleet with it.
I can't believe we're even talking about third rail and Voyagers!
For a start, there is so little of their work over third rail (Basingstoke-Bournemouth, bits of Reading-Guildford if that still runs) that it just isn't worth it - if "Project Thor" wasn't viable 10 years ago, then it is going to be even less so now. And that's before you get on to what the HSE would make of installing more third rail in depots.