Railsigns
Established Member
- Joined
- 15 Feb 2010
- Messages
- 2,754
http://www.bbc.co.uk/news/uk-scotland-edinburgh-east-fife-33397980 said:There are now more than 1,000 World Heritage Sites across the globe, in 161 countries.
Of these, 29 are British, including the Tower of London, the Giant's Causeway and Stonehendge (sic).
I do (slightly) envy those who get to commute over it on a daily basis.
.
I do (slightly) envy those who get to commute over it on a daily basis.
Travelled over and back every schoolday for three years, usually in the front saloon of a DMU with an amazing view through all the girders. A well-deserved accolade indeed. Will it affect the proposals for a visitor centre and top-of-girder walks?
I'm surprised it wasn't already.
Always think of Richard Hanney climbing out and making a run for it.
Also the listing is not always a one way street.
Dresden recently lost its world heritage site status, after the city built a new bridge over the Elbe and (in the view of UNESCO) spoilt the view of the baroque buildings.
The UNESCO report says that electrification and the visitor centre proposals were suggested by those in charge of the application as some of the development that could happen within the boundaries of the site. The report doesn't then mention electrification again, caring much more about the visitor centre and ensuring there aren't any wind turbines nearby, so I think Network Rail are safe to plough ahead with wires.
I'm surprised it wasn't already.
Always think of Richard Hanney climbing out and making a run for it.
I agree with what others have said, but it's hardly equal to other sites e.g Neolithic Orkney. Still a fabulous structure mind.
--- old post above --- --- new post below ---
Not that he did in the book...
I imagine the biggest barrier will be how they'll actually manage it. I can see a solution being a conductor rail, with carefully placed/coloured insulation where needed.
I find it odd that this structure is the first UK railway UNESCO world heritage site.
Structures by the Stephensons, Locke, Brunel and others are much older and at least as worthy.
Always think of Richard Hanney climbing out and making a run for it.
Not that he did in the book...
That the author forgot to put the forth bridge scene in the book was a major oversight IMO.
I think a major piece of industrial engineering is as important in terms of world heritage as a neolithic site.
That the author forgot to put the forth bridge scene in the book was a major oversight IMO.
Quite interesting that they have awarded it to a structure that technically isn't completed. They haven't finished painting it yet.
Yes, John Buchan really should have asked for the forum's views before writing the book!!
![]()
A particularly poor joke considering that... they did finish painting it some time ago.
The continuous painting actually ended two or three years ago, when they finished coating it with a special paint that is expected to last 10 years. [Edit: time overlap with me123.]
On the other hand this could be bad news as any work on it (e.g. future electrification structures) could now be subject to draconian planning and consents processes. Sometimes we need to be careful what we wish for.
For the most part the wires could perhaps be cantilevered off the existing structure.
https://www.youtube.com/watch?v=XLvSWDgYCu8
The approach ramps would still need portals though but.
What is quite interesting that they have awarded the accolade to a structure that technically isn't completed. They haven't finished painting it yet.![]()
That's probably not the case, NR has plenty of bridge painting/restoration projects going on - the Tay Bridge has been going since at least 2005 and looks like it's got a couple of years left to go.What worries me more about this painting job is that NR won't have the skills in 10 (or however many) years to go back and repaint it because all the people involved have left and not passed their skills on. Bit like electrification really.
What worries me more about this painting job is that NR won't have the skills in 10 (or however many) years to go back and repaint it because all the people involved have left and not passed their skills on. Bit like electrification really.