• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

First Greater Glasgow

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Have heard Scotstoun are due 19. Would make sense to add a mixture of doubles and singles on to the 2 at the very least!
 

N1

Member
Joined
10 Aug 2022
Messages
385
Interested to know how reliable info is that it will be Streetdeck repowers (not accusing jut interested) and if there is indication of the source of the Streetdecks (from Leeds, Bristol etc.) and if it is self funded or part of Rock Road ScotZEB2 extra funding?
 

Volvodart

Established Member
Joined
12 Jun 2010
Messages
2,929
Interested to know how reliable info is that it will be Streetdeck repowers (not accusing jut interested) and if there is indication of the source of the Streetdecks (from Leeds, Bristol etc.) and if it is self funded or part of Rock Road ScotZEB2 extra funding? funding does
No funding has been announced, as the bid for the monies does not go in until next month.
 

pdsilva

Member
Joined
17 Nov 2024
Messages
7
Location
Glasgow
How much longer do you guys reckon Phoenix Road will be closed. It’s been about 2 or 3 years. The diversion just feels like the normal route now given how long it’s been
 

EMU303

Member
Joined
24 Aug 2016
Messages
296
How much longer do you guys reckon Phoenix Road will be closed. It’s been about 2 or 3 years. The diversion just feels like the normal route now given how long it’s been
I’m not sure about Phoenix Rd but the works seem to have been extended by another year.


Roadworks on a section of the M8 will continue for another two years after unforeseen “challenges” caused significant delays.

Temporary propping of the motorway at the Woodside Viaducts in Glasgow began in March 2021 after the bridges’ supports were found to be in worse condition than expected.

Now, work on the eastbound carriageway won’t be finished until Autumn 2026, while completion on the westbound carriageway isn’t scheduled until the second half of 2027.
 

camro

Member
Joined
21 Dec 2024
Messages
124
Location
Glasgow
None of the E200EVs from Caledonia are out in service today... I know it's a Sunday but still I don't think that's normal
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Also noticed the low height E400s don’t tend to be used on a Sunday. I remember this being the case with E500s when they were here but I think that was more of a fuel issue that was later rectified when they went to Aberdeen?
 

LT02 NVV

Member
Joined
12 Nov 2019
Messages
633
Location
Glasgow
Also noticed the low height E400s don’t tend to be used on a Sunday. I remember this being the case with E500s when they were here but I think that was more of a fuel issue that was later rectified when they went to Aberdeen?
It’s mainly because the 6 isn’t as busy. Scotstoun’s Geminis are also the same too, not running on Sundays because they’re not normally needed (unless it’s like a big event like TRNSMT, when more buses are needed to run on routes).
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,243
It’s mainly because the 6 isn’t as busy. Scotstoun’s Geminis are also the same too, not running on Sundays because they’re not normally needed (unless it’s like a big event like TRNSMT, when more buses are needed to run on routes).
Strange, there was a time not long ago that they had low heights out on the 6 on Sundays for most of the runs.

I did take a 6 from EK into town a few weeks back and the bus was painfully slow.
 

LT02 NVV

Member
Joined
12 Nov 2019
Messages
633
Location
Glasgow
Strange, there was a time not long ago that they had low heights out on the 6 on Sundays for most of the runs.

I did take a 6 from EK into town a few weeks back and the bus was painfully slow.
I’ve been told the E400s are kinda trash by some people at Scotstoun depot (who went to the Cowcaddens Fire Station Open Day last Saturday), and they want to replace them with low-height electric deckers.
 

sannox

Member
Joined
1 Mar 2016
Messages
649
I’ve been told the E400s are kinda trash by some people at Scotstoun depot (who went to the Cowcaddens Fire Station Open Day last Saturday), and they want to replace them with low-height electric deckers.
Is there any suitable low height decker around?
 

aswilliamsuk

Member
Joined
10 Jul 2016
Messages
527
Have heard Scotstoun are due 19. Would make sense to add a mixture of doubles and singles on to the 2 at the very least!
There's certainly 10 of them so far - the latest First Group allocation changes (from official sources: https://wmbusphotos.com/Fleetchanges/First.html) confirm Repowers 71038-47 are bound for Scotstoun. These ten have come from the various older (351xx) StreetDecks released by the influx of Yutong U11DDs into Hengrove and the following cascades around West of England.

I have to say their allocation is a surprise - the original assumption was that the West of England StreetDecks released would become part or all of the 27 Repowers announced for Bath in the Spring, but apparently not!
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,243
It’s because they’re unreliable.
Always have been, the hybrids were worse.

== Doublepost prevention - post automatically merged: ==

I’ve been told the E400s are kinda trash by some people at Scotstoun depot (who went to the Cowcaddens Fire Station Open Day last Saturday), and they want to replace them with low-height electric deckers.
I would be surprised if they are replaced by new low heights. I think First would rather use existing singles.
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Always have been, the hybrids were worse.

== Doublepost prevention - post automatically merged: ==


I would be surprised if they are replaced by new low heights. I think First would rather use existing singles.
Agreed. I doubt any low height buses will be coming for the 6. They’ll no doubt continue to use E200EVs and E300s until such times as a newer electric single can fill the void.
 

LT02 NVV

Member
Joined
12 Nov 2019
Messages
633
Location
Glasgow
Agreed. I doubt any low height buses will be coming for the 6. They’ll no doubt continue to use E200EVs and E300s until such times as a newer electric single can fill the void.
I was told by people at Scotstoun that they did need some new low-height deckers for the 6.
 

camro

Member
Joined
21 Dec 2024
Messages
124
Location
Glasgow
Pretty certain they’re 14”0 the low height streetdecks
I believe this conversation has been had before. There is currently nothing new on the market in terms of low height double deckers which would meet the Busby Bridge height requirements. The BYD E400EVs are off by millimeters.

To my knowledge, the only low height bus shorter than the original E400 from this century has been the one off East Lancs Kenitec+.
 

Top