I love your faith in SPT. Personally, I think the tendered network is a bit of a mess and the responsibility for that lies entirely with SPT. It’s grown on an ad-hoc basis over the years, responding to the piecemeal cuts from First & McGills (mainly). Every time a ‘vital’ service has been cut, the local councillors have made a fuss and SPT have cobbled something together. What we’ve ended up with is an incoherent mess. Keeping on topic, this matters as more cuts from First are almost nailed on – can see some evening/Sunday services disappearing. If SPT are as broke as they say, it’ll be interesting to see how they deal with the inevitable calls to ‘do something’.
I agree, but I don't think it's completely SPT's fault- they've cobbled together a cheap route network designed for coverage and low vehicle requirements.
I'm sure many in there would like to change routes, but can't because of commercial competition and costs. The 31 is an example of this along with the McGill's 1/2 services in Bridge of Weir show this as they cover everyone but don't serve the actual links.
