The Railway replies to a number of questions arising from the new contract to stable mainline trains at Bishops Lydeard. The contract with GBRf runs from 14 December 2009 to June 2010 and will see the stock of the Cardiff-Taunton mainline service, formed of MkII or MkIII coaching stock top and tailed by Class 57 locomotives, move onto the Minehead Branch each evening around 9.30pm for stabling and servicing. The stock then returns to Taunton at around 6.10am next morning. The stock will return to Cardiff at weekends for weekly exams and external cleaning, and refuelling the locomotives. Should refuelling be required on the WSR it will be carried out from a road tanker at the level gated access point near Dene Bridge with the refuelling company carrying out risk assessments, carrying spill kits, and covering the operation under their public liability insurance. It is possible between two and four spare coaches will be stored at Bishops Lydeard. The Railway continues to talk to GBRf about the use of the sets at weekends. Possible uses include a Bishops Lydeard to Taunton link during Gala events, or for railtour operators to run excursions to destinations such as Weymouth, York or Paddington. The Railway's Class 47 drivers will convert to Class 57 by means of a one day course, so that in an emergency, the set can be moved. Whilst not strictly a heritage operation, the contract builds new business for the future, and helps secure the link to the mainline at Taunton.