The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,676
Providing there is a spare 200m set to add and it doesn't sweat the assets too much. The other aspects that need to be considered are what train it joins back up to on the way back (Chester Crewe is 18 minutes, Crewe Liverpool is 35 minutes) so diagramming could be fun as you would probably be joining back up to the previous Liverpool service to the one that set was on. The journey time increase it has to the Liverpool trains (splitting and joining clearly taking longer than a normal dwell) also would need to be considered.Isn't there still a 200m Liverpool train that could have a back half added to it?