Fife Rail Electrification/Decarbonisation

Ginaro

Member
Joined
23 Aug 2016
Messages
132
Location
Scotland
Noticed the ongoing works on the bridge parapets at Roseberry Crescent in Kirkcaldy, the second bridge north of the station. The metal fence panels and top of the wall you can see on Street View have been removed with a third row of stone added, presumably with another row or two to come. Sign says Saturday night road closures until mid-December. https://maps.app.goo.gl/J5qkhqyRyBfWqDK46
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AMD

Member
Joined
6 Dec 2017
Messages
770
It's been a number of weeks since I was down to Leven in good light, so i've done another video.... it's more just pockets of masts missing here and there, but the first mast is now up by the signal protecting the main line, albeit I noticed it's numbered 03.
 

37025

Member
Joined
13 Nov 2025
Messages
33
Location
Kirkcaldy
Noticed the ongoing works on the bridge parapets at Roseberry Crescent in Kirkcaldy, the second bridge north of the station. The metal fence panels and top of the wall you can see on Street View have been removed with a third row of stone added, presumably with another row or two to come. Sign says Saturday night road closures until mid-December. https://maps.app.goo.gl/J5qkhqyRyBfWqDK46
I went down today and got a few photos
 

Attachments

  • 20251126_123347.jpg
    20251126_123347.jpg
    2 MB · Views: 138
  • 20251126_123435.jpg
    20251126_123435.jpg
    2.3 MB · Views: 137

AMD

Member
Joined
6 Dec 2017
Messages
770
Not entirely linked to electrification (however you get to see state of mast erection around it), but the deck of the new Mountfleurie bridge has gone in and the council have uploaded a short drone video of it -
 

37025

Member
Joined
13 Nov 2025
Messages
33
Location
Kirkcaldy
In the last few weeks a compound has been created on the site of an old factory in Kirkcaldy for SPL Powerlines, presumably linked to the forthcoming electrification.
 

Attachments

  • 20251207_131744.jpg
    20251207_131744.jpg
    3 MB · Views: 90
  • 20251207_132040.jpg
    20251207_132040.jpg
    2.1 MB · Views: 90
  • 20251207_132306.jpg
    20251207_132306.jpg
    3.2 MB · Views: 90

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,588
Location
Scotland
In the last few weeks a compound has been created on the site of an old factory in Kirkcaldy for SPL Powerlines, presumably linked to the forthcoming electrification.
Indeed it appears that it is, based on this article:
Residents in Kirkcaldy have spoken of windows and doors vibrating as a result of major work which has begun ahead of electrifying the rail line between the town and Thornton.
Now a councillor has called for a meeting with Network Rail to try to minimise the problems going forward.

The issue was sparked by piling work being carried out on derelict land on Victoria Road. The preparatory operations sit opposite houses on Citron Glebe where residents were left up in arms at the impact.

Though, I am curious what piling would be going on at that site?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton

37025

Member
Joined
13 Nov 2025
Messages
33
Location
Kirkcaldy
Indeed it appears that it is, based on this article:


Though, I am curious what piling would be going on at that site?
It might be referring to the drilling work that was undertaken before the actual work to clear the site started.

== Doublepost prevention - post automatically merged: ==

What's the site being used for ?
I would think the storage of the equipment needed for the OHLE installation, masts etc.
In the last photo there is access up to the railway, albeit at a lower height to the line.
 
Last edited:

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
There is now a bulldozer situated next to the overbridge at Ladywell Avenue in Coaltown of Balgonie, awaiting demolition over the new year closure. I'll try and get a photo soon.

== Doublepost prevention - post automatically merged: ==

I've found this as well on X by ScotRail themselves. This shows the work will really be ramping up soon!
(I'm not Scott by the way, this is just a reply to another user asking an unrelated question.)

(A screenshot of a verified ScotRail post on X explaining that some evening train services in Fife are being adjusted. The message links the changes to ongoing railway improvement work in the area and provides official clarification in response to a passenger query.)
image_2025-12-16_002654784.png
 
Last edited:

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Paid a visit over to Leven yesterday to see the progress of OLE on the branch line, and I can confidently say it's coming on well! Around 80+% of the masts have been erected.

I took a few photos but this seems to be the only one that wants to upload at the moment.
image_2026-01-05_222321496.png
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Here is a few more images around Leven station. I’m planning to go back to Thornton Junction soon, but this is all I have in the meantime.

Since last time, more masts are up on the approach to Leven station from the currently closed footbridges, more masts up around Cameron Bridge/Diageo area, including the support beams for the “portal”-type masts over the station itself.
 

Attachments

  • IMG_0261.jpeg
    IMG_0261.jpeg
    1.7 MB · Views: 147
  • IMG_0257.jpeg
    IMG_0257.jpeg
    4.8 MB · Views: 147
  • IMG_0255.jpeg
    IMG_0255.jpeg
    4.5 MB · Views: 146

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Here is a few more images around Leven station. I’m planning to go back to Thornton Junction soon, but this is all I have in the meantime.

Since last time, more masts are up on the approach to Leven station from the currently closed footbridges, more masts up around Cameron Bridge/Diageo area, including the support beams for the “portal”-type masts over the station itself.
Interesting to see that Leven's where Network Rail's old Class 313 (used in ERTMS testing on the Hertford Loop) has ended up!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Interesting to see mostly single-track cantilevers. But good to see wires going up on commuter routes.

Is the plan still for a gap in the wires from Dalmeny to Kinghorn/Dunfermline? If so, when to Scotrail plan on having the BEMU/Bi-Mode stock available to use the wires?
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
The cantilevers are probably arriving on site pre-attached to the masts. Same happened on East Kilbride.
Yes, that seems to be the case with 95% of the masts, and I’m pretty sure it’s cheaper and more efficient doing it that way.

Interesting to see mostly single-track cantilevers. But good to see wires going up on commuter routes.

Is the plan still for a gap in the wires from Dalmeny to Kinghorn/Dunfermline? If so, when to Scotrail plan on having the BEMU/Bi-Mode stock available to use the wires?
Yes, the plan is still to electrify to just south of Dalmeny, and continue on again just north of Kinghorn and Lochgelly, then will terminate a few hundred metres north of Ladybank station on both of the Perth and Dundee branches.

The BEMU stock has been said to be in service around 2031 (unfortunately), and we are to find out what trains we are getting and who will be building them this summer, most likely June.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
583
Location
Hull
The BEMU stock has been said to be in service around 2031 (unfortunately), and we are to find out what trains we are getting and who will be building them this summer, most likely June.
The invitation to tender/participate is due to be issued to potential suppliers this July, the contract announcement is planned for April 2028 and as you say 2031 for first units in service.

"https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV542816" -

IV.2.3) Estimated date of dispatch of invitations to tender or to participate to selected candidates
Date: 17/07/2026

II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Start: 28/04/2028
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
The invitation to tender/participate is due to be issued to potential suppliers this July, the contract announcement is planned for April 2028 and as you say 2031 for first units in service.
Thank you for the correction, I must have misread the date for "dispatch of invitations to tender" and the actual contract announcement.
 

AMD

Member
Joined
6 Dec 2017
Messages
770
So after a number of trips in the dark, i've been down in daylight recently and had a chance to record progress!
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Really great footage on both videos! Thank you very much!

I haven't noticed any progress between Cameron Bridge and that new footbridge in Mountfleurie, since you can't really get down there.
Still quite a few blank spots in and around Leven and Thornton, but there has definitely been a significant increase in the mast count over the past 3 months.

I now have a feeling that this 2028-30 deadline will be pushed forward quite a bit, considering the progress!
I'm anticipating that the wires could be up by the end of this year, in conjunction with the Kirkcaldy - Thornton North project, and the new feeder station at the junction being energised around 2027!
 

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
297
So after a number of trips in the dark, i've been down in daylight recently and had a chance to record progress!
Thanks for uploading!
Obvious they want to get the easiest part done since the parts that don't have OHLE masts seem to be the hardest ones.

The Scottish government is once again proving and doing something the Central Government won't.
 

nilvaj395

Member
Joined
11 Oct 2025
Messages
217
Location
So after a number of trips in the dark, i've been down in daylight recently and had a chance to record progress!
It's impressive how much progress there has been so quickly. Thank the planners for already laying the foundations for the masts on the Leven line, which has undoubtedly made it much easier.
 

RiverDon

On Moderation
Joined
11 Mar 2024
Messages
297
Location
UK
I noticed today there are some electrification mast piles already installed on the down line between Kirkcaldy and Kinghorn and there are quite a few lying at the side of the track ready to be installed. There is a big work site at Thornton North Junction which I guess is also connected with the electrification work
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
I noticed today there are some electrification mast piles already installed on the down line between Kirkcaldy and Kinghorn and there are quite a few lying at the side of the track ready to be installed. There is a big work site at Thornton North Junction which I guess is also connected with the electrification work
could be for the feeder station.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Two portals assembled at Cameron Bridge station now, one at each far end of the platform. The photo shows the portal at the Leven end of the station.
 

Attachments

  • IMG_0515.jpeg
    IMG_0515.jpeg
    3.1 MB · Views: 125

Davester50

Member
Joined
22 Feb 2021
Messages
1,049
Location
UK
While all the masts and wires going up, there's still no sign of the things that will use them for a considerable period, and seeing as it's relying on hybrid traction something new for ScotRail to learn about.
We must be at least 3-4 years away from entry in to service and that's without any problems, which even simpler AC/DC EMUs seem to attract large delays.
So how long until we can reasonably expect the first public passenger carrying train to use it?
 