Fife Rail Electrification/Decarbonisation

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Precisely. NWR has to use portals or TTCs above platforms (some places have used headspans, like Glasgow Queen St), and single track cantilevers are a no-no.
Out of interest, why are STCs a no-no?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
Out of interest, why are STCs a no-no?
To avoid any potential of live equipment over the platform. The Lancashire Trisngle scheme made that mistake before energisation with the post on the platform with the insulators on the post so potential live metal over the platform itself iirc
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
To avoid any potential of live equipment over the platform. The Lancashire Trisngle scheme made that mistake before energisation with the post on the platform with the insulators on the post so potential live metal over the platform itself iirc
Thank you. But still a bit puzzled, as above it was stated that TTC are allowed. Surely there's the same problem?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Thank you. But still a bit puzzled, as above it was stated that TTC are allowed. Surely there's the same problem?
Nope - the live parts can be moved along the boom of the structure on their 'stovepipe' such that they are all over the tracks, not the platform.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,307
Location
Somerset
Nope - the live parts can be moved along the boom of the structure on their 'stovepipe' such that they are all over the tracks, not the platform.
Makes sense.

Genuine question - how many serious incidents have been caused by live parts of OHL equipment being over a platform over the last 75 years?
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
None of the live parts are above the platform footprint so wouldn't that be fine (?)
==
1759195333793.png
I think it's this kind of design that is the problem (or would be, if there were a platform beneath it) - because all the cantilever components are live since the insulator is on the post.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
I take it this 1973-vintage assembly wouldn't be allowed now?

View attachment 189305
I mean, it's still "allowed", but only if replacing like-for-like, or if the cross-section of the mast is much beefier. The increased forces on the main steelwork when the catenary & contact are much further along mean that the mast is more likely to fail more quickly.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Spotted further road works underway around the Bankhead industrial estate between Bankhead Roundabout and Coaltown of Balgonie. This is obviously for the electricity cabling for the new feeder station.
 

McRhu

Member
Joined
14 Oct 2015
Messages
664
Location
Lanark
I mean, it's still "allowed", but only if replacing like-for-like, or if the cross-section of the mast is much beefier. The increased forces on the main steelwork when the catenary & contact are much further along mean that the mast is more likely to fail more quickly.
One of the features of MKIIIa, to my layman's eye, is the lightness and elegance of the stc masts. Has this been a problem then? The Series 2 masts (not to mention Series 1) are much heavier. I watched an overhead line repair some time ago (from a distance) where a tree had brought down MKIII wires and cantilevers on the WCML. It looked to me as if one of the masts had slightly twisted, barley-sugar style, and one of the crew untwisted it using the cantilever tubes as a lever as he hoisted them back into position. Then again it may have been a trick of the light/the distance/me havering, etc. Would such a manoeuver be possible?

ps. Sorry to go off topic a bit. Mods - strike me down with an insulator. All hail Fife.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Another bridge to be modified!
The bridge on Randolph Road (A915) near Standing Stane Road is to be raised over a 30 working day period between 31/01/26 and 29/04/26.
 

Ginaro

Member
Joined
23 Aug 2016
Messages
132
Location
Scotland
Another bridge to be modified!
The bridge on Randolph Road (A915) near Standing Stane Road is to be raised over a 30 working day period between 31/01/26 and 29/04/26.
To be clear it says parapets not the bridge. :) There's also two foot bridges near Dysart that haven't been mentioned but I think they will ok for clearance, maybe just parapet work.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
One of the features of MKIIIa, to my layman's eye, is the lightness and elegance of the stc masts. Has this been a problem then? The Series 2 masts (not to mention Series 1) are much heavier. I watched an overhead line repair some time ago (from a distance) where a tree had brought down MKIII wires and cantilevers on the WCML. It looked to me as if one of the masts had slightly twisted, barley-sugar style, and one of the crew untwisted it using the cantilever tubes as a lever as he hoisted them back into position. Then again it may have been a trick of the light/the distance/me havering, etc. Would such a manoeuver be possible?

ps. Sorry to go off topic a bit. Mods - strike me down with an insulator. All hail Fife.
The normal "open-route" MkIII STCs are fine, but the issue is with the slimmer cross-sections on masts which have larger radial loads (e.g. platform cantilevers, such as those used at Welwyn North). The larger the radial load, the more likely the "twist" can't be recovered.

Another reason why the Welwyn North-style cantilevers tend not to be used on new installs is the public; the less of a mast that someone can use as a de-facto climbing frame, the better!
 

McRhu

Member
Joined
14 Oct 2015
Messages
664
Location
Lanark
The normal "open-route" MkIII STCs are fine, but the issue is with the slimmer cross-sections on masts which have larger radial loads (e.g. platform cantilevers, such as those used at Welwyn North). The larger the radial load, the more likely the "twist" can't be recovered.

Another reason why the Welwyn North-style cantilevers tend not to be used on new installs is the public; the less of a mast that someone can use as a de-facto climbing frame, the better!
Many thanks for that.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
To be clear it says parapets not the bridge. :) There's also two foot bridges near Dysart that haven't been mentioned but I think they will ok for clearance, maybe just parapet work.
Apologies for the lack of knowledge. What does parapet work actually mean then? Is it for the return wires? And from cab rides in the past that I have seen, there is quite a few old bridges which look far too low for OHLE to pass under.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
The parapet is the bit on the side of the bridge that stops people or vehicles from falling off it. Raising it for electrification work means making it higher, to stop people dangling things over it which might come into contact with the wires. It unfortunately means that any view from the bridge is almost inevitably lost.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
The parapet is the bit on the side of the bridge that stops people or vehicles from falling off it. Raising it for electrification work means making it higher, to stop people dangling things over it which might come into contact with the wires. It unfortunately means that any view from the bridge is almost inevitably lost.
Ah, thanks for the info. I really should've known that beforehand...

I'm unfortunately not convinced that there will be truly full electrification even in the sections which are set to be electrified, since the clearance is definitely not enough for wires to pass through. An example being Markinch train station.
 

Ginaro

Member
Joined
23 Aug 2016
Messages
132
Location
Scotland
Well if it just mentions extending the height of bridge parapets then they must think that the clearance for that bridge is enough, otherwise they'd have to replace/raise the entire bridge. Here's an example from the Edinburgh to Glasgow electrification.


"The bridge parapet walls needed to be 1.8m tall to ensure the public is a safe distance from the 25k volt electric cables which will be installed under the structure as part of the ongoing Edinburgh Glasgow Improvement Programme (EGIP)."

bb31f6c746234d14ae8a77f9d70f2b91.jpg
 

AMD

Member
Joined
6 Dec 2017
Messages
770
An example being Markinch train station
Markinch isn't a problem, what is a problem is Kinghorn tunnel - low height and a very wiggly shape, as it has an S bend at the west end with another curve at the east, and it's not that long!
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Markinch isn't a problem, what is a problem is Kinghorn tunnel - low height and a very wiggly shape, as it has an S bend at the west end with another curve at the east, and it's not that long!
I agree with the Kinghorn tunnel as that will be an engineering nightmare, especially with its infamous kink in the middle.

I’m still skeptical whether this bridge along with others the exact same height will have great enough clearance… (e.g the one in this screenshot.)
 

Attachments

  • IMG_7274.jpeg
    IMG_7274.jpeg
    201.8 KB · Views: 91

jadmor

Member
Joined
26 Nov 2013
Messages
154
I agree with the Kinghorn tunnel as that will be an engineering nightmare, especially with its infamous kink in the middle.

I’m still skeptical whether this bridge along with others the exact same height will have great enough clearance… (e.g the one in this screenshot.)
I know this question drifts a little off topic, but is there any reason why Kinghorn tunnel wasn't bored out to a better alignment? I appreciate cost is always a factor, but is there an engineering issue?
 

BorderCollie

Member
Joined
15 Apr 2025
Messages
99
Location
Scottish Borders
October issue of Modern Railways now reporting that the electrification of the Borders railway (the same programme as Fife electrification) is in its entirety from Newcraighall to Tweedbank. ANyone know more?
 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
I know this question drifts a little off topic, but is there any reason why Kinghorn tunnel wasn't bored out to a better alignment? I appreciate cost is always a factor, but is there an engineering issue?
Could be complete bollocks, but LNER has a video with a fact about it at the timestamp 3:36
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
October issue of Modern Railways now reporting that the electrification of the Borders railway (the same programme as Fife electrification) is in its entirety from Newcraighall to Tweedbank. ANyone know more?
Having reread it, I suspect this is just a rather imprecise wording, rather than a change in scope.
 
Joined
20 Mar 2012
Messages
757
I noticed on Scot-Rail.groups.io that OHL installation between Thornton and Seafield, Kirkcaldy was due to begin at the weekend and last until end of next year
 