Apologies in advance if this is in the wrong section. Does anyone know why the footbridge from the original LT entrance that goes over the Thameslink lines at Farringdon was doubled in width given that it now doesn't go to the platforms? Is there some future master plan that I am not aware of?
Phil
Phil
