Darren R
Established Member
The platforms at Darwen have been extended by a metre or so and can now (just) accommodate 4x156 carriages. Blackburn and Entwistle can easily accommodate longer. The remainder are no longer than 3x156 cars, and (so far ad I am aware) there are no immediate plans to rectify this. However, this is set to change in the medium term, but not before the Farnworth Tunnel works begin.