Farnworth Tunnel Electrification.

Status
Not open for further replies.

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
The platforms at Darwen have been extended by a metre or so and can now (just) accommodate 4x156 carriages. Blackburn and Entwistle can easily accommodate longer. The remainder are no longer than 3x156 cars, and (so far ad I am aware) there are no immediate plans to rectify this. However, this is set to change in the medium term, but not before the Farnworth Tunnel works begin.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
Entwistle is definitely no longer than about 48-50 metres in usable length, despite what the sectional appendix might say (shows 119m).
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The video linked in post #29 says that the before the larger bore at Farnworth is enlarged, the smaller bore will be re-lined with concrete to protect it during the main works.

Yet if they were about to do this, wouldn't the temporary crossovers be initially the other way round, to direct trains through the larger bore?

So has this proposal been dropped or has it already been done?
 

ironstone11

Member
Joined
3 Jan 2013
Messages
217
The video linked in post #29 says that the before the larger bore at Farnworth is enlarged, the smaller bore will be re-lined with concrete to protect it during the main works.

Yet if they were about to do this, wouldn't the temporary crossovers be initially the other way round, to direct trains through the larger bore?

So has this proposal been dropped or has it already been done?

My thoughts entirely. I would guess that the track will be slewed across to the larger tunnel while the concrete lining of the smaller tunnel is done and then slewed back to the smaller bore.

We don't know what form the lining of the smaller bore will take, but if it's shotcrete, then I guess that can be done quite quickly.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
My thoughts entirely. I would guess that the track will be slewed across to the larger tunnel while the concrete lining of the smaller tunnel is done and then slewed back to the smaller bore.

We don't know what form the lining of the smaller bore will take, but if it's shotcrete, then I guess that can be done quite quickly.

Its shotcrete, applied on nights and at weekends, and its already started ...

the crossovers are exactly the right way round, trust us!
 
Last edited:

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,631
Location
Hampshire
Its shotcrete, applied on nights and at weekends, and its already started ...

the crossovers are exactly the right round, trust us!

Indeed - I presume it's using the RRV / Trolley set up Network Rail used in Whiteball tunnel and a few others down in Devon last year.
 

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Will Network Rail be producing a time-lapse video of the work being done at Farnworth as they have done for other works on the network ?
 