What a strange thread. As long as the train got to it's destination on time I really can't see the problem here. The fact is many Sunday services are given some slack as engineering works often mean slow lines have to be utilised or two tracks instead of four.
Even normal running you often have areas where as an experienced driver you know it's pointless running at line speed as you will catch up a preceding stopping service. One that we do regularly off the top of my head are services from Reading via Solihull. During the daytime you will catch up a stopper around Solihull and follow it to Tyseley. What is the point of running line speed only to then have to run on yellows at slow speed increasing the risk of a SPAD just so a punter can say well it was OK as we went 100MPH where possible.
Of course the OP is obviously unaware of a mechanical problem that could have affected the trains top speed. A voyager with one engine out (especially a five car) would struggle to get up to 125 between Stafford and Wolverhampton on the up even though the line speed is 125
With regards the the subject of padding timetables. I have never understood why people think this is such a bad thing. At least if your timetable has a bit of slack in it the odd few minutes delay can be clawed back if required. Without any recovery time any slight delay for any reason and the train would stay late. Recovery time just means the timetable is a lot more robust and can cope with events easier.
Recovery time has always been there so please don't suggest it's just there so TOCs can massage the figures. You only have to look at a WTT from pretty much any era and you will see.
So your train ran on time, It didn't run at 125MPH. well get over it.
My argument stems from all TOC's running slower timetables for IC than they ever have done, the trains that beat the timetable just to sit outside stations shows padding is too much and damn right annoying when journey times could be done quicker if there was more vision from those who own the trains and those who service the infrastructure. My gripe is that 125mph isn't quick compared to high-speed lines on the continent and Scotland isn't served well with such speeds SO....I feel the least my TOC can do is use the 125mph capability its given to get me to my destination a lot quicker than averaging 75mph Sunday or no Sunday - it's pathetic. The only thing that needs to be got over here is those who take the view that such average speeds are OK - they're not - so get over that!
Padding is done because all concerned in the TOC's and Network Rail cannot run a railway very well just yet. Costs are over-inflated, timetables could be faster as 10mins of padding is ridiculous because of 'just in-case events' as that just shows how much confidence you have in the network when you need to give so much padding. I think 5 mins was given in the past so we've doubled where we were and have the slowest timetables than at any point in history and the only TOC to have bucked that trend are Virgin and XC but then again, Virgin had investment and even that didn't do the full job and as for XC - I can walk quicker!
I'm well aware of the issues why and they're not all TOC's fault but people used to have pride in getting to destinations as quick as possible on IC and that has just disappeared. Not only has it gone, it's gone backwards. In what world that you live in is it ok to go slower according to your timetable than in the 1970's?!!! Great Western has gradually increased times and I don't give a damn as to why if it's getting to destinations just to sit outside stations when I could be arriving about 15mins quicker than I currently do and half an hour quicker at weekends.
Last edited by a moderator:
