How can you collect and crunch data on people who 'wake up in the morning and on the spur of the moment think I'll jump on a train to the seaside for a day?'
The way one member of staff dealing with multiple assistances is avoided is by those who require it informing the TOC in advance so the TOC can do their bit of getting the right number of staff in place to ensure that person is not missed or forgotten, this is not limited to railway travel and is more about ensuring that person gets what they need to make their journey as swift and unhindered as possible not about them having some kind of different rights to travellers who don't need assistance.
Data that is collected is historical, but over time as the data set grows, it can be used to make reliable predictions acute future peaks in demand. Thousands of businesses and industries use data to predict when they need staff, materials etc.
The national grid use historical data to show that when corrie or eastenders finish, millions of people leap for the kettle as the credits start to roll to make a brew. National grid use this data, collected over years to predict the Electricity demand needed. Ng then call on power stations to increase output.
Heck, the railways use it to offer advance fares. They use passenger counts to predict demand and then use yield analysis to show how much money they can make from a train. We all know that if there are a few major sporting events on in London at the weekend and other events the trains will be maxed out, so tocs try to use all carriages available.
We're going to disagree it seems, sure it is useful if someone knows they are making a trip in 3 months, then have a system to pre book, but use actual data to show the peaks when more staff are needed. In a wheelchair or not, people should be able to catch a train without having to pre book.